NTPCNSENTPC Limited· PowerMediumPositive
Announced Wed, 27 May · 23:08 IST

NTPC Limited has informed the Exchange regarding 'Declaration of COD of eighth and the last part capacity of 105 MW out of 1200 MW Khavda-II Solar PV Project located in Gujarat of NTPC Renewable Energy Limited, a stepdown subsidiary of NTPC Limited'.

Greenfield CommissionedCapex & Operations View source PDF

NTPC · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reaction · full curve 14 horizons · vs prior close
-5.0%1-day move
₹397.85
prior close
₹400.00
base price
After-mkt
timing
5m10m15m30m1D2D3D4D5D7D15D1M2M3M
-0.8-0.7-0.8-1.1-5.0-7.7-7.9-8.3-9.3-10.5-8.1-10.9
Up moveDown movePending
AI summary

NTPC Limited's stepdown subsidiary NTPC Renewable Energy Limited (NTPC REL) has declared the Commercial Operation Date (COD) for the eighth and final tranche of 105 MW capacity out of the 1,200 MW Khavda-II Solar PV Project in Gujarat, effective 28th May 2026. This completes the entire 1,200 MW project. With this, the NTPC group's total installed capacity stands at 90,773 MW and commercial capacity at 88,893 MW. The project is owned by NTPC REL, which is a stepdown subsidiary through NTPC Green Energy Limited (NGEL).

Likely market impact

The full commissioning of the 1,200 MW Khavda-II Solar PV Project is a positive development, reflecting NTPC's continued execution of its renewable energy expansion plan. It strengthens NTPC's installed and commercial capacity, supporting its transition toward cleaner energy.