शुभ दीपावलीDiwali offer: 3 months free on yearly plans · ends 11 NovSee plans
BSEB.R.GOYAL INFRASTRUCTURE LIMIT· ConstructionHighNeutral
Announced Wed, 12 Aug, 2026 · 15:30 IST

Allotment of 11 lakh convertible warrants at Rs 119 each

Price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
-4.3%Reaction day
₹199.50
prior close
—
announcement price
After-mkt
timing
Nifty Microcap 250market · in no size index; the smallest one is used+0.2%-4.4% vs market
Civil Construction peers, median of 100sector-0.0%-4.2% vs sector

On the reaction day the stock moved 4.4 pts less than Nifty Microcap 250 and 4.2 pts less than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
—
10m
—
15m
—
30m
—
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
-4.3+0.2-4.4-0.0-4.2
Next day
-4.8+0.2-5.0-0.7-4.0
2d
+0.0+0.4-0.4-0.4+0.4
3d
+0.0+0.7-0.7-1.3+1.3
4d
-0.3+0.1-0.4-2.0+1.8
5d
-0.8+0.7-1.4-1.6+0.8
1w
+0.3+1.2-0.9-1.6+1.9
15d
-6.3+0.7-7.0-1.7-4.6
1m
-9.3-1.2-8.1-4.8-4.5
2m
-0.3-1.1+0.9-8.7+8.5
3m
—————
UpDownMarket · Nifty Microcap 250Sector · Civil Construction peers, median of 100Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

B.R.Goyal Infrastructure has allotted 11,00,000 convertible warrants at Rs 119 each (face value Rs 10, premium Rs 109) to 9 non-promoter allottees on a preferential basis. Total potential value: Rs 13.09 crore. Company received Rs 3.27 crore (25 percent upfront). Warrants convertible into equal number of equity shares within 18 months. Issue fully subscribed.

Likely market impact

Potential equity dilution if warrants are later converted. Brings in Rs 3.27 crore now; remaining Rs 9.82 crore over 18 months.