Ind-Ra withdraws rating on fully repaid IREDA term loan of Rs 83.24 crore
JNPR · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.1 pts less than Nifty Microcap 250, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Juniper Green Energy repaid its entire Rs 83.24 crore IREDA term loan in full and received a no-dues certificate. At the company's request, India Ratings (Ind-Ra) withdrew the credit rating (WD) on that facility, previously IND A+/Stable. The company runs a 30MW solar project in Maharashtra and, with subsidiaries, has 2.58GW of operational capacity plus 503MWh of battery storage as on 11 August 2026.
Positive for shareholders: debt is fully repaid and the rated facility is closed, cutting leverage and interest cost, with no rating now on this loan.