Annu Projects Q2 FY27 earnings call

Tue 17 Nov 202611:30 ISTANNU

In brief

Q2 FY27 revenue ₹15.74 cr, EBITDA margin 18.68%; order book ₹1,018 cr, management targets ~₹2,000 cr order book by March 2027.

Management's tone
Mixed
What was said
Leaned positive
Guidance
First guidance issued
Analyst pushback
Medium
Stock, next session
+3.36% (Nifty 50 +0.38%)
  • Q2 FY27 revenue ₹15.74 cr; EBITDA ex-other income ₹2.94 cr (18.68% margin); PAT ₹1.01 cr, EPS ₹0.19, vs a ₹3.48 cr pre-tax loss in Q2 FY26.
  • Order book ₹1,018.39 cr across 30 ongoing projects at Sept 30, up from 23 projects in June; telecom is 81.23% of it.
  • BharatNet Kerala: ₹260 cr of AMC work approved and partly executed; the ₹500 cr-plus EPC portion waits on DoT right-of-way approvals.
  • Management expects an order book of around ₹2,000 cr by March 2027, after bidding ~₹3,000 cr of tenders with ~9.3% clearance so far.
  • Trade receivables fell to ₹142 cr from ₹156 cr and unbilled to ₹59 cr from ₹76 cr; receivable days 237→192, with ₹73 cr collected in H1.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY27

This quarterA year agoLast quarterMargin
Revenue₹15.7 cr—−20.9%
EBITDA (excl. other income)₹3 cr—−27.3%18.7%
Net profit₹1 cr—−20.4%6.4%
EPS (₹)₹0.19—−29.6%

From the company's filed results for the quarter ended 30 Sept 2026 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Monsoon halted trenching and site work in Q2, stalling milestone billing: Q2 revenue ₹15.74 cr vs ~₹20 cr in Q1, with revenue weighted to H2.
  • BharatNet Kerala EPC revenue awaits DoT right-of-way approvals, so only the ₹260 cr AMC portion has approvals and part execution so far.
  • H1 revenue ₹35.65 cr grew 5.7x over H1 FY26's ₹6.51 cr — a low base; FY26 full-year revenue was ₹241 cr with only ₹6.51 cr booked in H1.
  • EBITDA of ₹2.94 cr (18.68% margin) is stated excluding ₹0.80 cr of other income; total income for the quarter was ₹16.54 cr. (accounting)
  • H1 PAT margin of 6.4% reflects the seasonal weighting of billing to the second half, with milestones mainly achieved in Q3 and Q4.

The numbers management led with

  • Ongoing project portfolio and order book: 30 ongoing projects (23 at June 30, 2026), INR 1,987 crores aggregate contract value; INR 1,018.39 crores order book.
  • BharatNet Kerala order concentration: Approximately INR 741 crores in the order book, also described as about INR 800 crores, including INR 260 crores of AMC; EPC work awaits right-of-way approvals.
  • Tender pipeline and year-end order target: About INR 3,000 crores bid, approximately 9.3% clearance, INR 125 crores of LOI awaited and a target of more than INR 2,000 crores by March 2027.

Guidance

Guidance on this call

WhatForWhat management said
Order bookFY27an order book in the range of around INR2,000 crores by the year end
EBITDA margin (H1 FY27 level)—margins are expected to be sustained at this level (H1 FY27 EBITDA margin 19.64%)
Revenue growth CAGR—we are confident of maintaining our revenue growth CAGR
Business momentumQ3 FY27we expect business momentum to strengthen in Q3 and be particularly strong in Q4 of FY27
EPS (INR7 mark)FY27Chairman affirmed "100%" on the INR7 EPS question; H1 FY27 EPS was INR0.45
Purchase of machinery from IPO proceeds—purchase of machinery, INR15.4 crores
IPO working capital allocation—working capital first, INR115 crores
India wastewater treatment market size (sewerage)FY26-FY30market size for wastewater treatment in India expected to grow to INR378.10 billion in FY30
Natural gas share in India's energy mix (gas pipeline)FY26-FY30natural gas share in the energy mix is supposed to grow from 6% currently to 15% in FY30
Turnkey rooftop solar project (renewable energy)—aligned with a few people to take entire turnkey project for 100-megawatt project

The business

By business

Telecom infrastructure

Largest vertical at 81.23% of the ₹1,018 cr order book; BharatNet Phase III Kerala (~₹741 cr) has ₹260 cr of AMC work approved and partly executed, with EPC awaiting DoT right-of-way.

Order book share 81.23% · BharatNet Kerala ~INR741 cr of order book · INR260 cr AMC portion approved · AMC to complete over next 10 years (1-1.5 years done)

Outlook: FY27 revenue from the order book expected to be largely telecom; momentum to strengthen in Q3 and be particularly strong in Q4 as right-of-way approvals arrive.

Sewerage infrastructure

14.65% of the order book; a ~₹100 cr project is underway and ~₹150 cr of AMC sewerage work is spread over five to seven years, giving regular AMC revenue of ~₹50 cr.

14.65% of order book · Approx INR100 cr sewerage project · INR150 cr AMC sewerage work · INR50 cr regular AMC revenue · AMC spread over 5-7 years

Outlook: Large opportunity cited in tier-2 and tier-3 city sewerage as government funds sanitation; new sewerage orders won and pending LOA.

Gas pipeline

1.63% of the order book; management sees a large opportunity as natural gas share in India's energy mix is expected to rise from 6% to 15% by FY30.

1.63% of order book · Natural gas share 6% currently · 15% by FY30

Outlook: Described as a huge opportunity; selective bidding planned, with new gas orders targeted in the second half.

Railway signalling

2.49% of the order book; won a ₹12.81 cr North East Frontier Railway contract for a 143 km optical fibre backbone, extending the Eastern Railway engagement.

2.49% of order book · INR12.81 cr North East Frontier Railway contract · 143 km optical fibre backbone

Outlook: New railway execution orders expected in H2 FY27 to diversify the revenue mix; signalling seen as aligned to existing telecom expertise.

Renewable energy (solar)

New vertical entered via MoU with GEIE to supply materials under JVVNL rooftop solar projects worth ₹44.3 cr across 8,000 systems; a 100 MW turnkey project is under negotiation.

INR44.3 cr JVVNL rooftop solar project · 8,000 rooftop solar systems · 100 MW turnkey project under negotiation

Outlook: Exploring renewable energy and adjacent segments selectively; will not commit additional capital without relevant experience.

Balance sheet, capex and funding

  • IPO raised ₹175.06 cr: ₹20.5 cr issue expenses, ₹115 cr working capital, ₹15.4 cr plant & machinery; ₹70.3 cr utilised by Sept 30 (₹54.4 cr working capital).
  • No further capex or funding needs anticipated beyond the IPO proceeds — answered "Not currently".
  • Trade receivables down to ₹142 cr from ₹156 cr in March; unbilled down to ₹59 cr from ₹76 cr.
  • Receivable days down to 192 from 237 in March; about ₹73 cr collected from prior-year revenue during H1.
  • ROCE described as healthy with a larger post-IPO capital base; funds to be deployed into machinery and working capital as execution scales.
  • Machinery plan: HDD machines for existing projects and for expansion into states where the company is not currently present.

The industry, as management sees it

Management sees expanding telecom demand from data-center connectivity, significant underpenetration in sewerage treatment and a rising natural-gas pipeline opportunity. It cited only 28% sewerage treatment, a wastewater market expected at INR 378.10 billion by FY30, and gas's energy-mix share expected to rise from 6% to 15% by FY30.

Risks management named

  • BharatNet Kerala EPC revenue remains dependent on pending DOT right-of-way approvals
  • Monsoon-related work stoppages and delayed site handovers can defer milestones and billing
  • Competitive bidding pressure may compress project margins
  • Working-capital needs rise as the project portfolio expands
  • Measurement and certification delays may postpone revenue realization

Q&A

Analysts concentrated on the durability of H1 growth, post-listing share-price erosion, margin sustainability and the execution path for the order book. The sharpest focus was on BharatNet Kerala, where management tied timing to pending approvals and declined to give an EPC completion date; it also avoided FY27 revenue guidance. Management was generally confident on Q3-Q4 execution, order ambitions and collections, while the only direct investor grievance concerned post-IPO communication and was answered with a defense of disclosure and execution.

Not answered directly

  • Quantified FY27 revenue outlook
  • BharatNet Kerala EPC completion timetable
  • Concrete milestones tied to the share-price decline
  • Productivity impact of machinery capex

Asked for a number, answered without one

  • FY27 revenue and H2 profitability guidance: CFO said he cannot guide the FY27 revenue number; the order book points to telecom-led revenue, with new railway, solar and gas orders broadening the mix.
  • EBITDA margin sustainability: Margins "expected to be sustained at this level"; risks listed were right-of-way approvals, land availability, site handovers and measurement and certification delays, with no margin number given.
  • FY27 EPS: Chairman answered "100%"; CFO said H1 EPS was ₹0.45 and would rise as second-half project execution and milestones are billed, without giving an FY27 EPS number.
  • BharatNet Kerala completion timeline: ₹260 cr AMC runs over the next eight years (1-1.5 years done); the ₹500 cr-plus EPC part starts only after DoT right-of-way permissions; no completion date was given.
  • Additional capex or funding: Answered "Not currently", with IPO funds to be deployed only as per the mandate of working capital, GCPs and plant and machinery.

Every question, with its answer

  1. 1. Growth sustainability

    Yash Parkar, Patel Investments

    Question. After H1 FY27 revenue rose 5.7x, is that growth momentum sustainable, and can investors expect similarly strong growth in coming quarters?

    Answer, Mayank Agarwal, Chief Financial Officer. Mayank Agarwal said project awards and execution are weighted to H2 and that the company was confident of maintaining the ongoing revenue trajectory. He offered no numerical growth rate and did not quantify how much of the H1 increase would repeat.

    Follow-up. Why was the post-listing share-price decline not reflecting the order book and future growth prospects, and what milestones should investors track?

    Answer. The CFO said short-term market movements have many drivers and do not reflect the company's performance or strength. He declined to comment on valuation, said fundamentals should show through in coming quarters, and did not specify milestones.

    Not answered directly.

  2. 2. EBITDA margin sustainability

    Yash Parkar, Patel Investments

    Question. Is the 19.64% H1 EBITDA margin sustainable, and which factors could influence margin performance?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said margins were expected to remain around the current level. He identified right-of-way permissions, local clearances, land availability, site handovers, government-agency coordination and measurement and certification delays as the principal swing factors, while expressing confidence in execution.

    Follow-up. What revenue-growth and profitability guidance applies to H2 FY27, and which segments should contribute meaningfully?

    Answer. The CFO said telecom would remain the main order-book contributor, with increasing contributions from railway, solar and other verticals. He explicitly declined to provide an FY27 revenue number but remained confident of maintaining the company's revenue-growth CAGR.

    Not answered directly.

  3. 3. Sequential revenue performance

    Yash Parkar, Patel Investments

    Question. Why did revenue decline sequentially from nearly INR 20 crores in Q1 to INR 15-16 crores in Q2, and was the decline temporary?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said EPC execution is more heavily weighted to H2 and that the monsoon disrupted trenching and other outdoor work across project locations. He presented the Q2 slowdown as seasonal rather than evidence of weaker underlying demand.

  4. 4. Order-book execution

    Shravan Modi, Syndicate Family Office

    Question. How does the company plan to execute its INR 1,018 crores order book?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO separated the portfolio into AMC work scheduled over roughly six to ten years and EPC projects scheduled over two to three years. He supported the execution claim with the company's record of completing more than 365 projects over 21 fiscal years.

  5. 5. BharatNet Kerala timeline

    Shravan Modi, Syndicate Family Office

    Question. What completion timeline does management expect for the BharatNet Kerala project?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said approximately INR 741 crores of the order book related to the project, including INR 260 crores of AMC work, while EPC execution awaited right-of-way approvals. Sanjay Kumar Sarraf added that the overall Kerala order was about INR 800 crores, with the AMC component extending over ten years and the INR 500-plus-crore EPC portion starting only after approvals.

    Not answered directly.

  6. 6. Order inflows

    Shravan Modi, Syndicate Family Office

    Question. What opportunities does the company see for securing additional orders in the upcoming quarters?

    Answer, Sanjay Kumar Sarraf, Chairman and Managing Director. The Chairman said the company had bid on about INR 3,000 crores of tenders and achieved approximately 9.3% clearance, with a letter of intent for INR 125 crores awaited during November. He expected the order book to exceed INR 2,000 crores by March 2027 while emphasizing cautious bidding to protect revenue and profitability.

  7. 7. FY27 EPS outlook

    Shrinivas Aiyer, Rockfort Consultant

    Question. Can FY27 EPS return to FY26's INR 6.91, given that H1 FY27 EPS is only INR 0.45?

    Answer, Mayank Agarwal, Chief Financial Officer. The Chairman initially answered '100%' and asked the CFO to continue. The CFO clarified that H1 EPS was INR 0.45, said most EPC milestones and revenue are concentrated in Q3 and Q4, and expected EPS to increase as project execution accelerated, but did not formally reiterate a numeric target.

    Partly answered.

  8. 8. Investor communication and IPO confidence

    Shrinivas Aiyer, Rockfort Consultant

    Question. Original IPO investors have reportedly lost 60% of their wealth, and the company made little effort to communicate after listing. Why should investors trust management?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO cited transparent disclosures, regular investor forums and operational execution as the basis for restoring confidence. He said management would prioritize converting the order book into sustainable growth, strengthening working capital and deploying IPO funds as stated, while noting that the IPO price resulted from the book-building process and market conditions.

    Not answered directly.

  9. 9. IPO proceeds utilization

    Anirudh Sharma, Ekaant Investment

    Question. How does the company plan to use the IPO proceeds, and how were the key investment priorities identified?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said gross IPO proceeds were approximately INR 175.06 crores. INR 20.5 crores was earmarked for issue expenses, INR 115 crores for working capital and INR 15.4 crores for machinery; by September 30, about INR 70.3 crores had been utilized, including INR 54.4 crores toward working capital.

  10. 10. Machinery investment

    Anirudh Sharma, Ekaant Investment

    Question. What machinery will be purchased, and are the investments intended to expand capacity, upgrade existing infrastructure or add capabilities?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said the planned purchases include horizontal directional drilling machines and that full details were disclosed in the RHP. The machines would support existing projects as well as expansion opportunities in states where the company is not currently present.

  11. 11. Capex execution impact

    Anirudh Sharma, Ekaant Investment

    Question. How will the planned capital expenditure strengthen execution capabilities?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said the additional machines would help the company execute projects, but did not quantify capacity gains, cost savings, productivity improvements, project throughput or deployment timing.

    Not answered directly.

  12. 12. Additional funding requirements

    Anirudh Sharma, Ekaant Investment

    Question. Does the company anticipate any additional capital expenditure or funding requirements beyond the IPO proceeds?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO answered that the company does not currently anticipate additional capital expenditure or funding requirements beyond the IPO proceeds.

  13. 13. Gas pipeline and sewerage opportunity

    Mrunal Shah, Individual Investor

    Question. What growth opportunities does management see in the gas-pipeline and sewerage infrastructure segments?

    Answer, Sanjay Kumar Sarraf, Chairman and Managing Director. The Chairman pointed to data-center connectivity requiring national fiber networks, growing gas-pipeline requirements and sewerage needs in Tier 2 and Tier 3 cities. The CFO added that only 28% of Indian sewerage is treated, the wastewater market is expected to reach INR 378.10 billion in FY30, and natural gas's energy-mix share is expected to rise from 6% to 15% by FY30.

  14. 14. JVVNL rooftop solar

    Mrunal Shah, Individual Investor

    Question. Can you elaborate on the INR 44.3 crores JVVNL rooftop-solar project and its scope of work?

    Answer, Mayank Agarwal, Chief Financial Officer. The Chairman said Annu Projects initially took the material-supply portion and was discussing a possible full turnkey role in a separate 100-MW project. The CFO clarified that the existing INR 44.3 crores PM Surya Ghar contract covers 8,000 systems under JVVNL, with Annu Projects primarily responsible for supplying materials.

  15. 15. Adjacent segment strategy

    Mrunal Shah, Individual Investor

    Question. Are there plans to enter other infrastructure segments, and which adjacent areas are being explored?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said management is exploring renewable energy and other adjacent areas, while railway signalling is already closely aligned with the company's telecom expertise. He said expansion would remain selective and that additional capital would not be committed without relevant experience, equipment and relationships.

  16. 16. Working capital and collections

    Divya Reddy, Sunshine Capital

    Question. How will the company keep working-capital requirements under control while supporting top-line growth?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO said trade receivables fell from INR 156 crores in March to INR 142 crores and unbilled receivables declined from INR 76 crores to INR 59 crores. The company collected about INR 73 crores in H1 FY27, reduced receivable days from 237 to 192, and selectively used IPO working-capital funds.

  17. 17. Q3-Q4 execution support

    Divya Reddy, Sunshine Capital

    Question. What supports management's expectation that Q3 and Q4 will be stronger quarters?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO cited FY26's strong seasonality: revenue was INR 6.51 crores in H1 but approximately INR 241 crores for the full year. He explained that project execution and milestone billing are concentrated in H2, with the current larger portfolio and order book providing a similar basis for FY27.

  18. 18. Investor milestones

    Divya Reddy, Sunshine Capital

    Question. What key milestones should investors track over the next few quarters?

    Answer, Mayank Agarwal, Chief Financial Officer. The CFO identified three broad milestones: growth in the order book, commencement of upcoming projects and execution of the project portfolio. He did not provide specific award dates, approval dates or execution milestones.

What was said

Topic by topic, in the order it was spoken

Company Profile and Track Record · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • Annu Projects was established in 2003 and described itself as an infrastructure and EPC solutions provider with more than two decades of experience.
  • Its four operating verticals are telecom infrastructure, sewerage, gas pipeline and railway signalling.
  • Management cited 365 projects executed, supported by in-house engineering, owned machinery and expertise in trenchless technology and optical-fiber splicing.
  • The footprint spans 10 states and two union territories, serving government departments, public-sector undertakings and private organizations.

Order Book and Vertical Mix · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • At September 30, 2026, the company had 30 ongoing projects with aggregate contract value of INR 1,987 crores, versus 23 projects a quarter earlier.
  • The reported order book was INR 1,018 crores and provided the base for future execution.
  • Telecom represented approximately 81% of the order book, followed by sewerage infrastructure.
  • The BharatNet Phase III Kerala package remained the largest ongoing engagement.

BharatNet Kerala Execution Dependency · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • Kerala project approvals had been received for approximately INR 260 crores of AMC work, and execution had commenced on part of it.
  • The remaining EPC work was awaiting right-of-way approvals from the Department of Telecommunications.
  • Approval delays had affected the pace of project execution and revenue recognition during FY27.
  • Because the larger Kerala component has a long execution period, annual revenue depends on approvals and execution pace rather than total order value alone.

Order Inflows and Bidding Discipline · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • Based on current visibility and normal circumstances, management expected the order book to reach around INR 2,000 crores by year-end.
  • The company was participating in several large tenders and planned to update investors on material developments.
  • Management said the tender market had become highly competitive and bidding margins were under pressure.
  • The company planned to bid selectively and would not breach its internal margin threshold merely to expand the order book.

Adjacent Infrastructure Expansion · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • The company secured an INR 12.81 crores contract from North East Frontier Railway for a 143-km optical-fiber backbone.
  • The railway order built on Annu Projects' existing engagement with Eastern Railway.
  • An MoU with GEIE covered INR 44.3 crores of material supply for 8,000 JVVNL rooftop solar systems in Dausa, Rajasthan.
  • Management viewed railway communications and solar supply as extensions of its existing execution capabilities.

IPO Proceeds Deployment · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • The BSE and NSE listing was described as a significant milestone for the company.
  • Fresh-issue proceeds were earmarked for machinery capital expenditure and business working-capital requirements.
  • Management expected these investments to support execution capability as the project portfolio expanded.

H2 Execution and Business Priorities · Sanjay Kumar Sarraf (Chairman and Managing Director)

  • The business was historically weighted toward the second half, with more project execution and revenue realization expected in H2 FY27.
  • Management expected momentum to strengthen in Q3 and be particularly strong in Q4 as projects progressed and approvals arrived.
  • Priorities included timely execution, quality and cost discipline, milestone billing, receivable collection and geographic expansion.
  • Management would evaluate adjacent opportunities only where its technical capabilities and execution experience could be leveraged.

Q2 and H1 FY27 Performance · Mayank Agarwal (Chief Financial Officer)

  • Q2 revenue from operations was INR 15.74 crores, while EBITDA excluding other income was INR 2.94 crores with an 18.68% margin.
  • Q2 profit after tax was INR 1.01 crores and EPS was INR 0.19, versus a corresponding-quarter pre-tax loss of INR 3.48 crores.
  • H1 revenue from operations was INR 35.65 crores versus INR 6.51 crores in H1 FY26, with EBITDA of INR 7 crores and a 19.64% margin.
  • H1 PAT was INR 2.29 crores, EPS was INR 0.45 and PAT margin was 6.4%, reflecting the company's seasonal H2 weighting.

Order Mix and Diversification · Mayank Agarwal (Chief Financial Officer)

  • Telecom represented 81.23% of the order book, sewerage 14.65%, railway signalling 2.49% and gas pipelines 1.63%.
  • Management expected future revenue to become more diversified across verticals and geographies.
  • The company held L1 positions on additional sewerage, gas and railway orders, but excluded them until letters of award were received.
  • The company entered H2 with 30 ongoing projects and an order book of INR 1,018.39 crores.

Working Capital and Capital Efficiency · Mayank Agarwal (Chief Financial Officer)

  • Management remained focused on improving billing efficiency and collections as the project portfolio expanded.
  • It described ROCE as healthy and noted that the capital base had increased following the IPO.
  • IPO funds were being deployed into machinery and working capital, with the objective of steadily improving capital efficiency.
  • Experienced manpower and in-house machinery were cited as foundations for operating efficiency and financial discipline.

In their words

We will not go below our internal margin threshold merely to add to the order book.
Sanjay Kumar Sarraf (Chairman and Managing Director, Annu Projects Limited)
As execution progresses across our key projects and the required approvals are received, we expect business momentum to strengthen in Q3 and be particularly strong in Q4 of FY27.
Sanjay Kumar Sarraf (Chairman and Managing Director, Annu Projects Limited)
The timing of these approvals has had a bearing on the pace of execution and revenue so far this year.
Sanjay Kumar Sarraf (Chairman and Managing Director, Annu Projects Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • Order book trajectory toward ~₹2,000 cr by March 2027, including the ₹125 cr LOI awaited and undisclosed L1 wins.
  • DoT right-of-way approvals for BharatNet Kerala and start of the ₹500 cr-plus EPC construction.
  • Q3 execution: management expects momentum to strengthen in Q3 and Q4 to be particularly strong.
  • Milestone billing and collections: receivable days (192), trade receivables and unbilled balances.
  • IPO fund deployment per mandate: ₹115 cr working capital and ₹15.4 cr for HDD machinery.
  • New verticals: ₹44.3 cr JVVNL rooftop solar supply, 100 MW turnkey talks and the ₹12.81 cr NF Railway contract.

Transcript

Read along with the recording

The whole call, 175 lines from 13 speakers over 46:02. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.

Sign up freeLog in

The stock after the call

After the callCloseStockNifty 50
Next session Tue 17 Nov 2026₹39.98+3.36%+0.38%

From the close of Mon 16 Nov 2026, ₹38.68: the last close before the call, which began at 11:30 IST. Adjusted daily closes; the move includes everything else that happened in those sessions.