Bansal Roofing Products Q1 FY27 earnings call
In brief
Q1 FY27 revenue up 26.8% YoY to Rs45.89 cr, PAT up 31.9%; entered solar MMS; Phase 5 & 6 expansion due mid-Sept 2026.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Low
- Stock, next session
- +0.45% (Nifty 50 −0.16%)
- Q1 FY27 revenue from operations stood at Rs45.89 cr versus Rs36.20 cr in Q1 FY26, growth of approximately 26.8% YoY.
- Q1 FY27 EBITDA rose ~35% YoY to Rs4.12 cr with margin of ~9% versus ~8% in Q1 FY26; PAT grew 31.9% to Rs2.67 cr.
- Company formally entered Solar Module Mounting Structure manufacturing; machinery installed and to be operational from Q2 FY27.
- Phase 5 and Phase 6 expansion under construction, due for completion by mid-September 2026; Phase 6 to add ~200 MT/month of light fabrication PEB capacity.
- Incurred ~Rs5 cr of machinery capex in Q1 FY27 (CNC plasma cutting, roll forming, overhead cranes); new debt of ~Rs6 cr drawn to fund it.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q1 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹45.9 cr | +26.8% | +1.2% | |
| EBITDA (excl. other income) | ₹4.1 cr | +33.2% | −19.6% | 8.8% (8.4% a year ago) |
| Net profit | ₹2.7 cr | +31.9% | −23.7% | 5.8% (5.6% a year ago) |
| EPS (₹) | ₹2.02 | +32.0% | −23.8% |
From the company's filed results for the quarter ended 30 Jun 2026 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Revenue grew ~26.8% YoY in Q1 FY27 on volume growth across PEB and roll-forming components, partly helped by a lower Q1 FY26 base.
- EBITDA margin expanded YoY from ~8% to ~9% on operating leverage; sequential EBITDA and PAT were below Q4 FY26.
- New Rs6 cr debt drawn in FY27 (repayment over 4 years) to fund ~Rs5 cr of Q1 machinery capex; company was debt-free in FY26. (accounting)
- Solar MMS not yet contributing to Q1 P&L; commercial production set to begin Q2 FY27, expected to lower blended margins.
- Added 100 kW rooftop solar in Q1 FY27 to take total installed capacity to ~300 kW, covering ~45% of electricity consumption.
The numbers management led with
- Solar MMS production capacity: 25,000 metric tons per month
- Solar MMS revenue potential: Rs 20 crore per month at ~Rs 80/kg
- FY27 revenue target: Rs 180–200 crore (~25% growth)
- Current PEB capacity: 1,200 MT/month (8–12 hour shift); scalable to ~2,000 MT/month on double shift (1.75–1.8x uplift)
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 revenue target | FY27 | FY27 revenue target of Rs180-200 cr; chairman said 25%+ growth projection is conservative as solar not included. |
| PEB capacity with two-shift ramp (PEB structures) | — | PEB capacity of 1,200 tons/month can scale to up to 2,000 tons/month if orders warrant two-shift production. |
| Solar MMS monthly revenue potential | — | At 25,000 tons/month solar MMS output and ~Rs80/kg, revenue potential of Rs20 cr per month. |
| Solar MMS capacity potential | — | Solar MMS installed machinery can produce up to 25,000 tons per month once fully operational. |
| Solar MMS gross margin | — | Solar MMS gross margin guided at ~4-5%, with net margin ~2.5-3% given low manpower/electricity cost. |
| Phase 6 additional PEB light fabrication capacity (PEB structures) | Q3 FY27 | Phase 6 expected to contribute ~200 metric tons/month of additional light fabrication PEB capacity upon completion by mid-Sept 2026. |
| Roofing sheet capacity post-expansion (Roll-forming products) | — | Roofing sheet capacity to rise from 10,000 MT/yr to 15,000 MT/yr after Phase 5/6 expansion. |
| Purlin capacity post-expansion (Roll-forming products) | — | Purlin capacity to rise from 1,500 MT/yr to 3,600 MT/yr after Phase 5/6 expansion. |
The business
By business
PEB structures
Core pre-engineered building business with design, fabrication, supply and execution; current capacity ~1,200 tons/month, expandable to ~2,000 tons/month on a two-shift model.
PEB capacity 9600 MT/yr pre-expansion · PEB capacity post-expansion 15000 MT/yr · Production 773 MT in prior year (80.86% utilization stated) · Target capacity up to 2000 tons/month with double shift
Outlook: Current capacity 1,200 tons/month; can scale to ~2,000 tons/month if orders warrant via two-shift model.
Roll-forming products (roofing sheets, decking sheets, purlins)
Roofing sheets, purlins, decking sheets and accessories sold both as part of PEB and independently; purlin utilization ~85%, decking utilization ~9%.
Roofing sheet capacity 10,000 MT/yr, utilization 50.72% · Roofing capacity post-expansion 15,000 MT/yr · Decking sheet capacity 6,000 MT/yr, utilization 9.2% · Purlin capacity pre-expansion 1,500 MT/yr, post-expansion 3,600 MT/yr, utilization 85.20%
Outlook: Capacities post Phase 5/6: roofing 15,000 MT/yr, purlins 3,600 MT/yr; push for higher utilization flagged.
Solar Module Mounting Structure (MMS)
Newly entered business in Q1/Q2 FY27 with high-speed CU-Purlin and HAT roll forming machines; production to commence from Q2 FY27.
Capacity potential 25,000 tons/month at full ramp · Revenue potential ~Rs20 cr/month at ~Rs80/kg · Gross margin 4-5% · net margin 2.5-3%
Outlook: Targets ~25,000 tons/month capacity; could add ~Rs20 cr/month revenue but at lower 4-5% gross margin.
Balance sheet, capex and funding
- Total debt ~Rs6 cr as on 30 June 2026, drawn for machinery capex; repayment spread over 4 years; no plan for further debt at current premises.
- Q1 FY27 machinery capex ~Rs5 cr; Phase 5 and Phase 6 civil construction ongoing, due mid-Sept 2026.
- Current premises (3 lakh sq ft at Savli, Vadodara) fully utilised; future expansion (e.g., sandwich panel project at Rs20-30 cr) to be funded via term loan and government subsidies.
- Receivable days historically under 2 weeks; solar MMS business expected to push credit period to 30-45 days.
- Rooftop solar capacity ~300 kW after Q1 FY27 addition; ~45% of electricity consumption now met via solar.
The industry, as management sees it
Management sees India's solar build-out (~5 GW of projects annually) as a major structural demand driver for mounting structure suppliers. Broader demand environment across warehousing, manufacturing, chemicals, pharmaceuticals, engineering, and commercial applications was described as supportive of BRPL's integrated offering.
Risks management named
- Solar MMS gross margin of 4–5% is materially below PEB margins; net margin ~2.5–3%
- Solar business receivable days expected at 30–45 days vs current <2 weeks, working capital impact
- ROCE may dip marginally as Rs5 cr Q1 capex on machinery enters the base before debt repayment begins
- Mumbai marketing office currently non-operational following departure of hired personnel
Q&A
Q&A was unusually structured — pre-submitted written questions from shareholder Lakshman Eswaran were read by the moderator, followed by live questions from Manish Kalaji. Management was forthcoming and specific with numbers throughout; no visible pushback. The most material discussions were on solar MMS economics (Rs20 cr/month potential at 4–5% gross margin), FY27 revenue run-rate (maintained Rs180–200 cr target, called 'conservative' without solar), and capex/debt posture (Rs6 cr debt for Rs5 cr Q1 capex, 4-year repayment). The call was cut short by the moderator on time grounds before Manish Kalaji could complete his question list; management offered to receive further questions via email.
Not answered directly
- Detailed forward revenue guidance including solar contribution (deferred to Q2 investor presentation)
- Specific future headcount numbers (qualitative only)
- Sandwich panel project specifics (acknowledged as future opportunity but no plan shared)
Asked for a number, answered without one
- Maximum revenue achievable from current asset base: Chairman said the potential could be significantly higher if solar business takes off but gave no figure.
- Future full-time and contract employee addition numbers: Chairman said permanent and temporary employees will need to be raised after Phases 5 and 6 complete, but did not give a number.
- Solar MMS order book and revenue contribution in coming years: Chairman gave a Rs20 cr/month potential at full ramp but did not commit to a timeline or share of FY27/FY28 revenue.
Every question, with its answer
1. Solar MMS opportunity and economics
Mr. Lakshman Eswaran, Unknown
Question. Can you elaborate on the solar structure opportunity — requirements, potential, target capacity, expected top-line contribution in coming years, and margins?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. India is a very large solar opportunity — approximately 5 GW of projects annually. BRPL has imported machines for MMS (HAT and C&U profiles) capable of producing 25,000 tons per month. At ~Rs80/kg, this translates to ~Rs20 crore per month revenue if order flow materialises. Margin: gross margin 4–5% (bulk roll-forming product, low manpower/electricity), net margin ~2.5–3% because expenses are very low. Top line will increase materially; bottom line moderately.
2. PEB capacity and Phase 5 & 6 impact
Mr. Lakshman Eswaran, Unknown
Question. What is the current PEB capacity and its potential this coming year? What is the targeted capacity post Phase 5 & 6 completion and its reflection on top line and margins?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Current PEB capacity 1,200 tons/month (8–12 hour shift). At ~Rs100/kg, that's the top-line run rate; margins will be good. With order flow, shifts can be raised from 1 to 2 (16 hours) and capacity can scale 1.75–1.8x — implying up to ~2,000 tons/month.
3. Order book visibility
Mr. Lakshman Eswaran, Unknown
Question. Can we have an idea of the current order book for the year?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Typically ~2 months of orders in hand. With FY27 target of Rs180–200 crore, divide by 12 and multiply by 2 — that's the rough order-in-hand figure.
Partly answered.
4. Large ticket execution capability
Mr. Lakshman Eswaran, Unknown
Question. Are we receiving larger ticket-size orders exceeding 10% of revenue, and are we ready for such execution?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Yes — last year bagged an order of ~Rs24 crore from a single party (~20% of turnover), currently nearing completion. Average order size is Rs3–5 crore; recently received an Rs8.5 crore order (disclosed on BSE). Capable of executing larger tickets but large orders are not the norm.
5. Employee strength and hiring plans
Mr. Lakshman Eswaran, Unknown
Question. What is the total employee strength as of today (full-time and contract) and any plan to increase? Future plans please elaborate.
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Total ~300 employees: ~100 permanent (HR, marketing, accounts, supervisors, production manager) and ~200 contract (technicians, fitters, welders, helpers). Once Phase 5 and 6 are complete, both permanent and contract headcount will need to increase. Specific numbers not shared; future plans described as 'very bright' given solar upside.
Partly answered.
6. ROE/ROCE sustainability
Mr. Lakshman Eswaran, Unknown
Question. ROE 24% and ROCE 35% — can we expect consistent 25% return metrics moving forward?
Answer, Mr. Kaushal Kumar S. Gupta / Mr. Jignesh Bansal, Chairman & Managing Director / Finance Head. CMD expects a slight dip due to lower solar margin and ~Rs20 cr/month incremental sales at lower margin, but overall results remain strong. Finance Head Jignesh Bansal added that the company was debt-free last year; this year Rs5 cr debt was taken for additional machinery with a 4-year repayment plan. As the debt is repaid, ROE should improve further. No plan for additional debt beyond this.
7. Solar receivable days impact
Mr. Lakshman Eswaran, Unknown
Question. Receivable days have been less than two weeks — will solar business impact receivable days?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Yes — solar business is capital-intensive for contractors; even good contractors need credit. 30–45 days is the normal credit period in the market, so receivables will be impacted.
8. Mumbai office status
Mr. Lakshman Eswaran, Unknown
Question. Are we seeing any revenue contribution from the Mumbai office?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Mumbai office is currently closed — the hired person left. No revenue contribution from the Mumbai office at present.
9. FY27 revenue projections maintained
Mr. Manish Kalaji, Unknown
Question. In Q3 and Q4 investor presentations you had released revenue projections; this quarter the presentation did not. Are we still on the prior projection of 25.32% growth?
Answer, Mr. Jignesh Bansal / Mr. Kaushal Kumar S. Gupta, Finance Head / Chairman & Managing Director. Jignesh Bansal: Yes, going by the same projections; will provide detailed run-rate analysis in the Q2 investor presentation. CMD added: 'This 25.32% is very conservative' — projections did not include revenue from the new solar business, which would lift actual growth higher.
10. Capex funding strategy and current debt
Mr. Manish Kalaji, Unknown
Question. Capex requirement — prior presentations had low projected debt levels despite planned capex. Sandwich panel project may need Rs20–30 crore. Will capex be largely funded through internal accruals?
Answer, Mr. Kaushal Kumar S. Gupta, Chairman & Managing Director. Till date, no external funds required. For future expansion outside the current packed-up Vadodara premise (3 lakh sq ft fully utilized as of 2026), some funds may be needed — but not very high. Management would prefer term loans, leveraging government subsidies currently available. Current debt ~Rs6 crore.
Follow-up. What is the current debt level as on 30 June?
Answer. Rs6 crore.
11. Product category revenue breakup and revenue ceiling
Mr. Manish Kalaji, Unknown
Question. Can the investor presentation give a breakup across product categories (PEB, solar structures, purlins, etc.)? Maximum revenue achievable from the current asset base?
Answer, Mr. Kaushal Kumar S. Gupta / Mr. Jignesh Bansal, Chairman & Managing Director / Finance Head. CMD explained product architecture via an analogy — PEB is the 'car', sold as a complete product, but components (roofing sheets, purlins, deck sheets) are also sold independently — these fall under roll-forming products. So when CMD says 1,200 tonnes of PEB, total PEB + related components is closer to 1,800 tonnes. Jignesh Bansal noted that the Q4 investor presentation already had a quantity-wise breakup of roll-forming and PEB products. On revenue ceiling: if solar business takes off, potential could be significantly higher and contribute substantially.
Partly answered.
What was said
Topic by topic, in the order it was spoken
Company Introduction & Journey · Mr. Kaushal Kumar S. Gupta (CMD)
- BRPL incorporated in 2008; commenced commercial production of roofing sheets and accessories in 2011; IPO and BSE SME listing in 2014.
- PEB commercial production started in 2016; migrated to BSE main board in 2021.
- Acquired 3 lakh sq ft land (~10x earlier unit) in 2020; PEB capacity scaled from ~100 MT/month (2020) to ~300 MT/month (2022) to ~800 MT/month (Dec 2024).
Business Model & Integrated Solutions · Mr. Kaushal Kumar S. Gupta (CMD)
- Positioned as integrated metal building solutions company — design, engineering, manufacturing, supply and installation of PEBs, roofing/cladding systems and allied building components including solar structure.
- Caters to warehousing, manufacturing, chemicals, pharmaceuticals, engineering, showrooms, recreational and industrial/commercial applications.
- Functions as a single-point solution provider — handles everything except civil work.
Manufacturing Infrastructure · Mr. Kaushal Kumar S. Gupta (CMD)
- Primary facility Unit 2 at Pratap Nagar, Savli, Vadodara, Gujarat; ~3 lakh sq ft built-up area on ~7 acres.
- Equipped with CNC plasma cutting, HV welding, multiple roll forming machines, arc welding, shot blasting, painting lines.
- Manufacturing, storage, administration and dispatch all housed on-site.
Financial Evolution (FY21–FY26) · Mr. Kaushal Kumar S. Gupta (CMD)
- Revenue from operations grew from ~Rs41.7 cr (FY21) to ~Rs154.3 cr (FY26); PAT from Rs2.2 cr to Rs10.4 cr.
- 5-year CAGR: ~30% revenue, ~36% EBITDA, ~36% PAT.
- Framed as transition to a substantially larger manufacturing and organisation base for the next phase of growth.
Forward Strategy Philosophy · Mr. Kaushal Kumar S. Gupta (CMD)
- Focus on increasing utilization of existing infrastructure rather than pivoting into unrelated businesses.
- Expand into higher-value PEB and fabrication work; grow share of internally manufactured products.
- Broaden customer industry base; leverage steel processing, roll forming, fabrication into adjacent opportunities such as solar MMS.
Q1 FY27 Financial Performance · Mr. Kailash Bansal (Whole Time Director)
- Revenue from operations Rs45.89 cr vs Rs36.20 cr in Q1 FY26 — YoY growth ~26.8%.
- EBITDA Rs4.12 cr vs Rs3.01 cr — YoY growth ~35%; margin ~9% vs ~8%.
- PAT Rs2.67 cr vs ~Rs2.02 cr — YoY growth ~31.9%; diluted EPS Rs2.02 vs Rs1.53.
- Sequential: revenue broadly stable vs Q4 FY26, but EBITDA and PAT lower; management urged against reading one quarter in isolation.
Annual Production Capacity & Utilization · Mr. Kailash Bansal (Whole Time Director)
- Roofing sheet capacity 10,000 MT/annum; FY26 production 5,072 MT (utilization 50.72%); expanding to 15,000 MT/annum.
- Decking sheet capacity 6,000 MT/annum; FY26 production 552 MT (utilization 9.2%).
- Purlin capacity 1,500 MT/annum; FY26 production 1,278 MT (utilization 85.20%); expanding to 3,600 MT/annum.
- PEB structure capacity 9,600 MT/annum; FY26 production 7,773 MT (utilization 80.86%); expanding to 15,000 MT/annum.
- Solar structure is newly added — production yet to commence.
Capacity Expansion — Phase 5 & 6 · Mr. Kailash Bansal (Whole Time Director)
- Phase 5 and 6 currently under construction; both expected to be completed by mid-September 2026.
- Phase 6 to add ~200 MT/month of light fabrication PEB capacity.
- Rs5 crore of machinery capex executed in Q1 FY27 — CNC plasma cutting, drone forming machines, roofing sheet forming machine, overhead and mobile cranes.
Solar Module Mounting Structure (MMS) Entry · Mr. Kailash Bansal (Whole Time Director)
- Installed high-speed roll forming machinery for C-Purlin and HAT profiles; operations to commence in Q2 FY27.
- Marks BRPL's entry into the renewable energy infrastructure ecosystem.
- Marketing team recruitment for solar MMS is underway.
- Roll-forming, low manpower/electricity product with bulk supply economics — differentiated from PEB execution model.
Operating Model & Sustainability Initiatives · Mr. Kailash Bansal (Whole Time Director)
- Currently operating partial two-shift (8–12 hours) production; can be extended to 16 hours based on demand.
- Added 100 kW rooftop solar in Q1 FY27 — total installed rooftop capacity ~300 kW.
- ~45% of electricity consumption now met through rooftop solar.
Five Forward Priorities · Mr. Kailash Bansal (Whole Time Director)
- Capacity utilization — aggressively increase throughput across all facilities.
- Execution capability — faster project turnaround with safety as top priority.
- In-house value addition — greater proportion of manufacturing to happen internally.
- Product basket expansion — leverage existing ecosystem into adjacent opportunities like solar MMS.
- Financial discipline — monitor margins, working capital, capital utilization and balance sheet as scale grows.
In their words
Till date, we don't require any fund from outside. For the future expansion, we may require some fund. But not in this premises. This premises is packed up now.
This is 25.32 is very conservative.
Since our company had been debt-free last year, this year we introduced debt, for additional machinery CAPEX of Rs5 CR, and the repayment plan, is for the next four years. Other than that, we don't have any plan to increase any further debt for it.
To check next time
What management committed to on this call, or the dates they gave.
- Solar MMS commercial production commencement in Q2 FY27 and first order wins; management has flagged 25,000 tons/month potential.
- Completion of Phase 5 and Phase 6 expansion by mid-September 2026, adding ~200 MT/month light fabrication PEB capacity.
- FY27 revenue trajectory against the Rs180-200 cr target; management says solar upside is not yet baked in.
- Movement in ROCE/ROE as new Rs6 cr debt begins to be serviced and asset base turns over.
- Receivable days trend as solar business starts contributing (chairman expects 30-45 day credit).
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Thu 13 Aug 2026 | ₹133.65 | +0.45% | −0.16% |
| 5 sessions Wed 19 Aug 2026 | ₹124.00 | −6.80% | −1.46% |
| 20 sessions Wed 9 Sept 2026 | ₹145.65 | +9.47% | −4.11% |
From the close of Wed 12 Aug 2026, ₹133.05: the last close before the call, which began at 14:00 IST. Adjusted daily closes; the move includes everything else that happened in those sessions.
Bansal Roofing Products's other calls
- Q2 FY27Thu 19 Nov 2026Tone: Confident