Ceinsys Tech Q4 FY25 earnings call
In brief
Q4 FY25 revenue grew 81.9% YoY to ₹142 cr, EBITDA up 116% to ₹27 cr; order book ₹1,197 cr; 35% dividend declared.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- None given
- Analyst pushback
- Medium
- Q4 FY25 revenue grew 81.9% YoY to ₹142 cr; EBITDA up 116% YoY to ₹27 cr with 18.82% margin.
- FY25 revenue ₹418 cr (+65% YoY); net profit ₹63 cr (+81% YoY); PAT margin 15.12%.
- Confirmed order book stood at ₹1,197 cr as of March 31, 2025; water projects contributed ₹1,019 cr.
- Board recommended higher dividend of 35% vs 25% last year, subject to shareholder approval.
- Technology solutions revenue rose 3.5x to ₹213 cr, contributing 51% of FY25 turnover vs 24% last year.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹142 cr | +81.9% | +27.4% | |
| EBITDA (excl. other income) | ₹26.8 cr | +117.3% | +26.0% | 18.8% (15.7% a year ago) |
| Net profit | ₹21.9 cr | +88.3% | +22.8% | 15.4% (14.8% a year ago) |
| EPS (₹) | ₹12.54 | +71.3% | +22.8% |
From the company's filed results for the quarter ended 31 Mar 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Successful execution of projects drove both revenue growth and EBITDA margin expansion in FY25.
- Allygrow Technologies (100% subsidiary) amalgamated with Ceinsys effective April 1, 2024 per NCLT order; already consolidated but simplifies reporting. (accounting)
- ₹12 cr US business development investment expensed in P&L for FY25, depressing reported margins. (one-off)
- Technology solutions share rose to 51% of turnover vs 24%, a mix shift toward higher-margin digital work.
- Employee cost as % of revenue declined to 30% from 35%; turnover per employee rose to ₹3.34 mn from ₹2.29 mn.
The numbers management led with
- Confirmed order book (geospatial + enterprise): INR 1,197 crore as of 31 March 2025; restated INR 1,327 crore including INR 130 cr Allygrow annual contract
- Water domain order book: INR 1,019 crore
- Investable surplus for inorganic growth: INR 105 crore plus INR 45 crore operational cash surplus
- Technology solutions execution value: INR 213 crore (vs INR 60 crore prior year — 3.5x growth)
- Bid pipeline currently in market: INR 355 crore; INR 280+ crore expected to be disposed in next one month
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Quarterly order book target | — | target is to achieve INR 300 crores, INR 400 crores worth of order book every quarter |
The business
By business
Geospatial and Enterprise Solutions
Strong growth driven by increased focus on water, IoT and enterprise solutions; water projects dominate order book at ₹1,019 cr.
Order book ₹1,019 cr water · Order book ₹178 cr geospatial enterprise
Outlook: Bid pipeline ~₹355 cr; two large projects >₹280 cr expected within a month
Technology Solutions
Revenue rose 3.5x to ₹213 cr; share of turnover jumped to 51% from 24% as company shifted to high-value digital initiatives.
Revenue ₹213 cr (3.5x YoY) · Share of turnover 51% vs 24%
Outlook: Focus on expanding share domestically and taking tech solutions international in FY26
Mobility (Allygrow)
Allygrow amalgamated with Ceinsys effective April 1, 2024 per NCLT order; FY25 revenue ₹83 cr plus ₹10 cr JV profit.
Revenue ₹83 cr · JV profit ₹10 cr
Outlook: Management declined FY26 number; said 'substantial growth' expected
Balance sheet, capex and funding
- Confirmed order book ₹1,197 cr (water ₹1,019 cr + geospatial/enterprise ₹178 cr); ~₹65-70 cr to be executed over 3-4 years, rest 18-20 months.
- Investable surplus ₹105 cr plus operational cash surplus ₹45 cr earmarked for inorganic opportunities; no major capex.
- Current ratio improved to 2.82 from 2.6; turnover to net working capital ratio rose to 4.4x from 3.2x.
- Trade receivables ₹253 cr includes unbilled ₹135 cr; ₹88 cr received in March 2025; further collection in April-May.
- ₹12 cr US business development expensed in P&L; Board recommended 35% dividend vs 25% last year.
The industry, as management sees it
Government policy backdrop is highly supportive: Jal Jeevan Mission extended to 2028, National Geospatial Mission launched under PM Gati Shakti, and urban land/planning reforms announced. Ceinsys's exposure to JJM will not exceed 7-8% of total mission spend, so diversification across water, technology solutions and mobility limits concentration risk. International technology solutions expansion underway with US team addition.
Risks management named
- Vidarbha river-linking project faces potential compounding delays from upcoming monsoon affecting survey and soil testing work
- Geospatial margins compressed in Q4 on specific project milestone (lower EBITDA percentage on milestone achieved)
- ESOP cancellations and senior US leadership turnover (Rashi resigned, John ESOPs cancelled on performance) during transition
- Concentration risk in Maharashtra government projects — payment cycles could lengthen further
Q&A
Q&A was dominated by three threads: (1) order book reconciliation — management clarified the apparent INR 200 cr decline was a definitional change (Allygrow annual contract moved out, putting restated order book at INR 1,327 cr); (2) receivables quality — INR 135 cr of unbilled revenue from milestone-driven billing explained the cash flow gap, with INR 88 cr collected in March alone; and (3) leadership transition — Prashant Kamat confirmed he is stepping back into an advisory role after K.P. Surej takes over as CEO, with ESOP cancellations framed as right-sizing for the new leadership rather than governance concerns. Pushback was medium: analysts pressed hard on order book decline, Vidarbha project timing under monsoon risk, FY26 guidance, and ESOP restructuring. Management consistently declined forward guidance, citing no-headwinds language instead.
Not answered directly
- FY26 revenue target (INR 550 cr or otherwise)
- FY26 ESOP cost
- Allygrow FY26 revenue outlook
- Quantitative margin guidance for next 3-5 years
- Specific bid pipeline conversion timelines
- Mr. Kamat's exact post-transition role
Asked for a number, answered without one
- FY26 revenue from Allygrow: Said 'substantial growth in the current year' but declined to give a specific number.
- FY26 ESOP cost: Said new CEO will need ESOPs and a new scheme for hires; cost not zero but premature to quantify.
- 3-5 year margin aspirations: Said company does not want to give future projections; will maintain and improve margins.
- Data center opportunity progress: Said putting data center plans on the back burner; do not want to defocus management.
- ₹1,000 cr revenue timeline: Refused to give forward-looking statement; suggested 'couple of years' if extrapolated but won't quantify.
- FY26 total revenue target: Said company does not give forecasts and would refrain from giving targets for FY26.
Every question, with its answer
1. Order book composition
Rohit Singh, Nvest Analytics Advisory LLP
Question. Order book declined ~INR 190 cr this quarter vs revenue of only INR 140 cr — why the gap? Does this indicate lack of fresh orders despite the INR 400 cr quarterly pipeline guidance? Is the proposed 45% reduction in center share under JJM affecting inflows?
Answer, Kaushik Khona, Managing Director (India Operations). The order book consumed in execution was INR 190 cr and new orders added were less — but no dearth of opportunity. On JJM, the reduction is from a higher state ask moderated to a reasonable number; on a yearly ~INR 110,000 cr JJM budget, our share won't exceed 3-5% of revenue. Geospatial share of JJM will be no more than 7-8%. Currently focused on Maharashtra, UP and tapping other states.
Follow-up. Why is the gap INR 190 cr in order book but only INR 140 cr in revenue?
Answer. The earlier order book figure referred only to geospatial; we have an additional INR 140 cr annual revenue potential from the mobility (Allygrow) business which was not counted in the earlier disclosed order book. So no actual reduction.
Partly answered.
2. Trade receivables
Rohit Singh, Nvest Analytics Advisory LLP
Question. Trade receivables have built up and Maharashtra government is reportedly delaying contractor payments — what % of receivables are from government, and by when will they be collected?
Answer, Kaushik Khona, Managing Director (India Operations). Total trade receivables INR 253 cr includes INR 135 cr of unbilled revenue. Actual debtors have come down vs prior year. INR 88 cr was collected in March alone; no overdue from Maharashtra government as of 31 March. Q1 FY26 billing milestones should convert the unbilled portion.
3. Vidarbha project execution
Rohit Singh, Nvest Analytics Advisory LLP
Question. Update on Vidarbha river-linking project: revenue booked in Q4, execution on schedule?
Answer, Kaushik Khona, Managing Director (India Operations). Letter of allotment granted Jan 13 (vs Nov announcement) — 2-month government delay. Deployed 88+ people on-site since Nov-Dec. First link aerial LiDAR survey largely complete; flying 150-175 sq km/day, to complete by 31 May with data processing by 30 June. No delay per project charter.
Follow-up. Will the INR 350+ cr order be completed in Q1 FY26?
Answer. Entire project will not be completed in Q1; we forecast ~INR 150 cr in Q1, execution on track per project charter after Feb 1 commencement.
4. Vidarbha project timing
Rohit Singh, Nvest Analytics Advisory LLP
Question. Follow-up on monsoon and Vidarbha timing — should we expect more than INR 150 cr in Q1?
Answer, Prashant Kamat, Vice Chairman and CEO. With rainy season coming up, survey/soil testing work will be affected. Right now we don't want to give any futuristic numbers; will update as we progress.
Not answered directly.
5. Allygrow contribution
Akshay Patel, AK Investment
Question. How much revenue contribution from Allygrow Technologies in FY25 and expectation for FY26?
Answer, Prashant Kamat / Kaushik Khona, Vice Chairman and CEO / MD India Operations. FY25: INR 83 cr revenue + INR 10 cr JV profit (total ~INR 93 cr) within INR 413 cr total. We don't give futuristic numbers but expect substantial growth in current year.
Not answered directly.
6. Order pipeline
Akshay Patel, AK Investment
Question. Order pipeline size and expected inflow in FY26 across all segments?
Answer, Kaushik Khona, Managing Director (India Operations). Order book INR 1,197 cr (ex-Allygrow). Target is INR 300-400 cr per quarter of new order book; cannot speculate quarterly. Bidding selectively for competitive advantage.
Partly answered.
7. Competition
Akshay Patel, AK Investment
Question. Competition in geospatial and technology solutions segments — which Indian peers, what's competitive edge?
Answer, Prashant Kamat, Vice Chairman and CEO. Many competitors (list very long). Our numbers show we are doing much better. Edge is technical competencies, project execution, 26 years of experience, breadth of services.
Not answered directly.
8. Order book restatement
Pranay, Burman Capital
Question. Order book delta between Dec (INR 1,400 cr) and Mar (INR 1,200 cr) — INR 200 cr drop vs only INR 140 cr revenue? Has the definition changed?
Answer, Kaushik Khona, Managing Director (India Operations). INR 1,197 cr order book is only geospatial + engineering services. Earlier INR 1,390 cr included ~INR 130 cr Allygrow (annual contract). Restated order book is INR 1,197 cr + INR 130 cr = INR 1,327 cr — aligned to prior period.
Follow-up. Bid pipeline size and probability of conversion in next six months?
Answer. Typically INR 300-400 cr per quarter. Currently INR 355 cr bid in market; two large projects aggregating INR 280+ cr expected to be disposed in next one month. Last year Q2+Q3 added INR 760 cr in two quarters.
9. Leadership transition and ESOPs
Pranay, Burman Capital
Question. ESOP cancellations and senior leadership changes — what's happening with Mr. Kamat, Rashi, John? Will FY26 ESOP cost be zero?
Answer, Prashant Kamat, Vice Chairman and CEO. Rashi resigned as VP Finance US (not needed after new US CEO hired). John ESOPs were performance-linked and not delivered. Kamat's own ESOPs voluntarily surrendered because exiting CEO shouldn't take all ESOPs — should go to new CEO. On FY26 ESOP cost: not zero — new CEO will get ESOPs and new scheme for hires. Prashant will stay as advisor/support; final role to be decided by new CEO.
10. M&A pipeline
Nikhil Poptani, Kizuna Wealth
Question. Update on the four M&A targets from prior call — two were nearly confirmed. Status?
Answer, Prashant Kamat, Vice Chairman and CEO. Due diligence expected to complete by April-May. Should see headway on two targets in next 1-2 months. Acquisition strategy remains both customer and competence acquisition.
Follow-up. Are targets for capability or organic growth?
Answer. Both customer acquisition and competence acquisition — track continues medium-term.
Partly answered.
11. Project delays
Nikhil Poptani, Kizuna Wealth
Question. Any other projects facing delays like Vidarbha?
Answer, Kaushik Khona, Managing Director (India Operations). No projects getting delayed. Vidarbha meter starts from agreement date — delay was between announcement and actual award.
Follow-up. Which states are you bidding in?
Answer. Target states: Maharashtra, Uttar Pradesh, Madhya Pradesh; also Gujarat and Rajasthan; focus on water, 3D city and urban development.
12. Trade receivables
Ankur Kumar, Alpha Capital
Question. Trade receivable trend — increase or decrease?
Answer, Kaushik Khona, Managing Director (India Operations). Receivables include debtors + unbilled. Unbilled INR 133 cr (milestone-driven, not due). Receivable-to-turnover ratio improved vs prior year. April-May collections continued.
Follow-up. Prior call mentioned INR 550 cr for FY26 — any change to that?
Answer. We don't give forecast. Achieved INR 418 cr vs INR 252 cr prior year and will continue growth path; refrain from FY26 targets.
Not answered directly.
13. Jal Jeevan Mission
Ankur Kumar, Alpha Capital
Question. Jal Jeevan mission allocation reduction — any impact on business?
Answer, Kaushik Khona, Managing Director (India Operations). Reduction is from a higher state ask, not affecting us. Even capturing all JJM opportunities would be 7-8% of budget. Opportunities not diminishing.
14. Order book execution timeline
Deepak Poddar, Sapphire Capital
Question. Execution timeline for INR 1,200 cr order book and 3-4 year order portion?
Answer, Kaushik Khona, Managing Director (India Operations). Average execution 18-20 months. Long-duration (3-4 years) orders not significant — only INR 65-70 cr.
Follow-up. Margin aspiration over next 3-5 years given growth?
Answer. We don't give future projections. Do not see headwinds; should maintain and improve margin profile. So far continuing on that track.
Not answered directly.
15. UK FTA
Vinay Bathija, Chanakya Investment Advisors
Question. Impact of newly-signed India-UK FTA on the business given UK exposure?
Answer, Prashant Kamat, Vice Chairman and CEO. UK exposure today is very small. FTA, if at all, will help positively; no negative impact.
16. Unbilled revenue
Keshav Sureka, Niveshaay
Question. Expected timeline for unbilled revenue realization?
Answer, Prashant Kamat, Vice Chairman and CEO. Unbilled is from 7-8 major projects; majority will be billed by Q2-Q3. Cyclical — as revenue grows, new UBR will be created.
Follow-up. Margin expansion in geospatial but compression in technology this quarter — what's driving the reversal?
Answer. One or two projects had lower-margin milestones this quarter. Tech solutions has higher margin; annual view better reflects it. Focus on tech solutions going forward.
17. Segment mix outlook
Keshav Sureka, Niveshaay
Question. Going forward, more revenue from technology or geospatial?
Answer, Kaushik Khona, Managing Director (India Operations). Tech solutions was 51% this year (vs 24% last year). Focus is on tech solutions, but difficult to project segment-wise percentages.
18. International strategy
Arya Oswal, Finterest Capital
Question. Technology is India-focused — does international revenue strategy continue? Has focus shifted?
Answer, Prashant Kamat, Vice Chairman and CEO. Focus has not shifted. Tech is largely India today but will be taken to international markets in coming quarters.
Follow-up. Bifurcation of geospatial into water/energy/mobility/AEC verticals?
Answer. No longer breaking out by utility — classifications better at geospatial vs technology level. Out of INR 1,197 cr, ~INR 500 cr is technology solutions, ~INR 400 cr water, balance geospatial engineering.
Partly answered.
19. Intangible assets
Aman Soni, Nvest Analytics Advisory LLP
Question. Nature of intangible asset increase in FY25 — visibility on economic benefits?
Answer, Kaushik Khona, Managing Director (India Operations). INR 8.3 cr intangibles relate to internally-developed technology process; IPR applied for; already generating benefits in existing projects. Capitalised per accounting standards.
Follow-up. Earlier INR 1,000 cr revenue target — when do you expect to hit that?
Answer. We don't give futuristic numbers. Extrapolating past performance suggests couple of years but no forward-looking statements.
Not answered directly.
20. International technology solutions
Aman Soni, Nvest Analytics Advisory LLP
Question. International order pipeline developments to trigger technology solutions going global?
Answer, Prashant Kamat, Vice Chairman and CEO. Multiple initiatives started. Signed one large contract; small execution underway. Pipeline and contracts expected to expand in FY26 as year unfolds.
Partly answered.
21. CEO role and posting
Midhun James, Eighth Wonder Capital
Question. Will K.P. Surej be CEO for entire group? Will he be posted in US given 90% business from India?
Answer, Prashant Kamat, Vice Chairman and CEO. Yes, Suraj will be CEO of entire company; Kaushik continues as MD for India Ops. This is a futuristic move to build international presence.
Follow-up. Update on futuristic businesses (data center, metaverse) to justify CSTech.ai rebrand?
Answer. AI/ML team built for geospatial; internally usable. As develops, may break out AI revenue separately. Data center currently put on back burner.
Partly answered.
22. Segment classification
Midhun James, Eighth Wonder Capital
Question. Clarification on technology vs geospatial bifurcation at project level — river-linking is tech but Maharashtra water IoT is geospatial?
Answer, Prashant Kamat, Vice Chairman and CEO. Segmentation is not at project level — each project has mix. Example: river-linking LiDAR survey is geospatial, AI processing of that is technology. Mix makes project-level tagging difficult.
23. Data center plans
Ashish Soni, Family Office
Question. Update on data center opportunity mentioned in prior call?
Answer, Prashant Kamat, Vice Chairman and CEO. Data center plans currently on back burner. Will communicate if decision taken. No management distraction warranted now given strong existing order book.
What was said
Topic by topic, in the order it was spoken
Company Overview & Rebranding · Kaushik Khona (MD - India Operations)
- Recently rebranded as CS Tech Ai; corporate name remains Ceinsys Tech Limited
- Leading IT-enabled technology solutions provider with geospatial engineering expertise
- Services span data creation, analytics, decision support systems, enterprise web solutions
- Allygrow Technologies acquired in FY22 brought manufacturing/mobility engineering (2W/3W, PV, CV, heavy equipment)
- Offices in India, US, UK, Germany; Innovation wing focused on AI/ML for metaverse, ad-tech, gaming, mobility
FY25 Financial Performance · Kaushik Khona
- Q4 FY25 operational revenue grew 81.9% YoY to INR 142 crore; EBITDA up 116% YoY to INR 27 crore
- Q4 EBITDA margin at 18.82%; net profit INR 22 crore (89% YoY growth), PAT margin 15.38%
- FY25 operational revenue INR 418 crore (65% YoY); EBITDA INR 78 crore (77% YoY), margin 18.63%
- FY25 net profit INR 63 crore (81% YoY); PAT margin 15.12%
- Growth driven by successful project execution and operational efficiency initiatives
Allygrow Amalgamation & Reporting · Kaushik Khona
- Allygrow Technologies (100% subsidiary) amalgamated with effect from April 1, 2024 per NCLT order
- ATPL was already consolidated; merger only streamlines reporting
- Allygrow contributed INR 83 crore revenue + INR 10 crore JV profit in FY25
Balance Sheet & Working Capital · Kaushik Khona
- Total confirmed order book of INR 1,197 crore (water INR 1,019 crore, geospatial/enterprise INR 178 crore)
- Investable surplus INR 105 crore for inorganic opportunities; operational cash surplus INR 45 crore
- Current ratio improved from 2.6 to 2.82; turnover to NWC ratio up from 3.2x to 4.4x
- Total trade receivables INR 253 crore includes INR 135 crore of unbilled revenue
Technology Solutions Growth · Kaushik Khona
- Technology solutions execution up 3.5x YoY: from INR 60 crore (FY24) to INR 213 crore (FY25)
- Technology solutions now 51% of total turnover (vs 24% prior year)
- Technology segment carries higher EBITDA margin than pure geospatial
- Per-project mix of geospatial and technology makes segment attribution project-specific
Operational Efficiency & HR · Kaushik Khona
- Employee cost declined to 30% of revenue (vs 35% prior year)
- Turnover per employee rose to INR 3.34 million (vs INR 2.29 million prior year)
- US business development investment of INR 12 crore fully expensed in FY25 P&L
- Continues to invest in training and development of technical resources
Leadership Changes & Board · Kaushik Khona
- Board appointed industry veteran Vanish Moorthy (25+ years, ex-Fortune 500 outsourcing deals) as Additional Director
- K.P. Surej (formerly CEO of US subsidiary TA) appointed CEO Designate and Additional Director
- Board recommended dividend raised to 35% (vs 25% prior year)
Major Contract Wins · Kaushik Khona
- Prestigious Vidarbha river-linking project in Maharashtra valued at INR 381 crore
- IoT project with Maharashtra State Water and Sanitation Mission: INR 332 crore order value
- CIDCO integrated GIS enterprise contract: INR 29 crore
- MHADA integrated digital transformation system integrator: INR 29 crore
Policy Tailwinds · Kaushik Khona
- Government extended Jal Jeevan Mission till 2028 — significant opportunity in water domain
- National Geospatial Mission launched using PM Gati Shakti framework
- Budget proposals for urban land reforms, municipal services and urban planning reforms
- Geospatial exposure to JJM will not exceed 7-8% of total mission spend — diversifies risk
In their words
It will be unfair on company and investors that exiting CEO takes all the ESOPs and walks out. Therefore, voluntarily, I said, I will surrender this ESOPs. Rightfully, they should go to the new CEO, not the CEO which is exiting.
With the rainy season coming up, the work will be affected in terms of survey and soil testing and all of that for API. Just a word of caution there. So right now, I don't think we want to give any futuristic numbers at this call.
We don't see any headwinds and we should be able to maintain and improve our margin profile as the quarters and quarters starts unfolding.
To check next time
What management committed to on this call, or the dates they gave.
- Vidarbha river linking (₹381 cr) execution: aerial LiDAR flying by May 31, data processing by June 30.
- Outcome of two large bids (~₹280 cr) from current pipeline of ₹355 cr, expected within a month.
- Progress on two M&A targets; due diligence expected to close by April-May 2025.
- Realization of unbilled revenue ₹135 cr during Q1 FY26 as project milestones are achieved.
- New CEO K.P. Surej transition (expected by year-end); Vanish Moorthy onboarded as Additional Director.
- International revenue updates as tech solutions are taken to UK/US markets in FY26.