In brief

Q2 FY27 revenue rose 127% to ₹2,235 crore, PAT up 246% to ₹59 crore; no FY27 guidance, but management stayed on track for 10-15% QoQ growth.

Management's tone
Optimistic
What was said
Leaned positive
Guidance
Guidance held
Analyst pushback
Low
  • Q2 FY27 revenue rose 127% YoY to ₹2,235 crore, EBITDA rose 93% to ₹161 crore at a 7.2% margin, and PAT rose 246% to ₹59 crore.
  • H1 FY27 revenue rose 122% to ₹4,644 crore, EBITDA rose 92% to ₹304 crore and PAT rose 222% to ₹132 crore.
  • Management gave no FY27 full-year guidance, said H2 should be better than H1, and expected volume, revenue and EBITDA growth in coming quarters.
  • U.S. imports lengthened procurement, raising supplier advances and short-term borrowing; management expected net debt and working capital to normalize.
  • CNG: management targeted 100 Bangalore stations within the next three to four quarters and by next Diwali; 50 were said to be over and 10 were in the pipeline.

An AI read of our transcription of the recording · the filing

The numbers

The quarter, Q2 FY27

This quarterA year agoLast quarterMargin
Revenue₹2,235 cr+127.4%−7.2%
EBITDA (excl. other income)₹161 cr+94.8%+11.8%7.2% (8.4% a year ago)
Net profit₹68.6 cr+237.4%+10.8%3.1% (2.1% a year ago)
EPS (₹)₹2.06+66.1%+10.8%

From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

Where management's figures differ from the filing

  • PAT / net profit to owners: said PAT ₹59 crore in Q2 FY27; filed Net profit to owners ₹68.59 crore. The call reported consolidated PAT but did not reconcile it with the filed profit attributable to owners.
  • Net profit YoY growth: said PAT growth 246% YoY in Q2 FY27; filed Net profit to owners +237.4% YoY. Management cited PAT growth without reconciling it to the filed owner-profit line; no bridge was provided.

What moved the numbers, as management explained it

  • Management attributed PAT growth to operating leverage and higher volumes; Q2 FY27 PAT increased 246% YoY to ₹59 crore.
  • Management said it prioritized bulk LPG alongside packed LPG and optimized the mix while serving industrial and commercial customers under long-term contracts.
  • Geopolitical developments and Middle East supply uncertainty caused volatility in international LPG prices and availability, making revenue dependent on price fluctuations.
  • Longer U.S. import procurement cycles and advance supplier payments raised working capital and short-term borrowings; management called the increase temporary but structurally linked to the cycle.
  • Other current assets rose from ₹449 crore to ₹738 crore, mainly on supplier advances; management said net debt could be lower after knocking off those advances.
  • Management linked H1 EBITDA growth to improved scale and operational efficiency; H1 EBITDA rose 92% YoY to ₹304 crore.

The numbers management led with

  • LPG supply and distribution infrastructure: 4 time-chartered LPG vessels; 68 bottling facilities; 478+ LPG tankers; 225 STVs
  • Distribution and customer network: 3,400 dealers; 3,400 direct customers; 300+ industrial customers
  • Cumulative capital investment: Over ₹800 crore invested in capital over the last five years
  • Working-capital and net-debt position: Other current assets rose by ₹290 crore, largely due to supplier advances; net debt was approximately ₹820 crore

Guidance

Guidance on this call

WhatForWhat management said
QoQ growth on revenueFY27Revenue growth of 10-15% QoQ from here onwards, subject to LPG price fluctuations.
QoQ growth on PATFY27PAT growth of 10-15% QoQ from here onwards; management said the bottom line was on track.
CNG stations in Bangalore (CNG and alternative energy)FY27-FY28100 CNG stations in Bangalore within the next three to four quarters, with completion focused on next Diwali.
Volume growthFY27Management said it would increase volume in coming quarters and add volume from new customers.
H2 better than H1H2 FY27Management agreed that H2 FY27 should be better than H1 FY27.
EBITDA growthFY27Management expected EBITDA growth in coming quarters and said H2 would be better than H1.
Further six stations will get operational (CNG and alternative energy)FY27Six further CNG stations were expected to become operational.
Add-ons in per-day sales (CNG and alternative energy)FY27Management expected add-on volume in per-day sales at established CNG stations.
Net debt normalization—Net debt was expected to normalize as Middle East supply conditions settled.
Working capital normalization—Working capital was expected to normalize as Middle East supply conditions settled.
Long-term agreements with new customers (Industrial and commercial LPG)FY27-FY30Long-term supply arrangements with new customers for two to three years.
Growth in Packed LPG, auto LPG, bulk LPG, CNG retailing and high-pressure cylinder manufacturingFY27-FY31Growth was expected in Packed LPG, Auto LPG, Bulk LPG, CNG retailing and high-pressure cylinder manufacturing over the next five years.
Outlook for our LPG business (Integrated LPG sourcing and distribution)FY27The outlook for the LPG business was described as strong and sustainable in the coming quarters.
Expanding our distribution footprint—Management prioritized expanding distribution, improving asset utilization and logistics, and enhancing operational efficiency.
Enhancing our LPG sourcing capabilities (Integrated LPG sourcing and distribution)—Enhancing LPG sourcing capabilities and strengthening supply-chain reliability were stated priorities.

What changed since the Fri 21 Aug 2026 call

WhatOn the Fri 21 Aug 2026 callOn this call
West Asia disruption impact (restated)West Asia disruption was described as a structural win, with new long-term industrial and HoReCa customers secured.U.S. sourcing lengthened procurement and raised working capital and short-term borrowing, although supply continuity and new customers continued.
QoQ revenue and PAT growth (held)QoQ growth of 10-15% was targeted for FY27.Management said it was on the same track and the bottom line was on track; revenue would depend on LPG prices.
Auto LPG station target (not repeated)Auto LPG stations were to scale from 315 to 500, including 75 additions in FY27.315+ stations were reported and LDS expansion remained a priority; no 500-station target was given.
Bangalore CNG station target (restated)CNG stations in Bangalore were to scale from 50+ to 100 during FY27-FY28.Management targeted 100 stations within the next three to four quarters and said completion was focused on next Diwali.
Type 4 commercial dispatch (not repeated)The Type 4 plant was commissioned, with commercial dispatch expected within one to two months.Not mentioned
Coastal storage terminals (not repeated)Backward integration included pursuing coastal storage terminals.Not mentioned
Income-tax assessment (not repeated)The search closed in seven days, but assessment was pending with no material liability expected.Not mentioned
Capital investment quantum (new)A priority was to improve utilization of already deployed assets.Over ₹800 crore had been invested in capital over the last five years, and benefits were now being realized.

The business

By business

Integrated LPG sourcing and distribution

Management described integrated sourcing and distribution, with increased U.S. imports after Middle East disruption; imports were roughly 80 to 80 thousand metric tons, without a stated period.

4 time-chartered LPG vessels · 68 bottling facilities · 478+ LPG tankers · 225 STVs · 3,400 dealers · 3,400 direct customers

Outlook: Management expected U.S. sourcing and volumes to expand in coming quarters and Middle East supply conditions to stabilize.

Bulk LPG

Management prioritized bulk LPG supplies and said long-term customer commitments supported sustained supply and an optimized business mix.

Outlook: Additional volume was expected from new customers, with bulk LPG volumes set to increase in coming quarters.

Pack LPG

Pack LPG was prioritized with bulk supply, supported by the company's dealer network, sourcing capabilities and distribution infrastructure.

Outlook: Management said it would expand the pack LPG business and strengthen sourcing, logistics and supply reliability.

Industrial and commercial LPG

New long-term supply arrangements with industrial customers and large hotels followed continuous supply during the disruption; contracts use a price-linked, competitive formula.

300+ industrial customers · 3,400 direct customers · 2-3 years

Outlook: Additional volumes were expected from new customers under the two- to three-year agreements.

Auto LPG

Auto LPG dispensing remained a priority, supported by the company's 315-plus station network and planned expansion of LDS coverage.

315+ auto LPG dispensing stations

Outlook: Management said it would strengthen its auto LPG position and expand the LDS network; no new station count was stated.

CNG and alternative energy

CNG retailing in Bangalore was described as generating good kg-per-day sales; management said 50 stations were over and 10 more were in the pipeline.

52+ CNG retail stations · 82+ CNG cascade vehicles · 50 stations already over · 10 stations under pipeline · 100 stations target

Outlook: Management targeted 100 stations within the next three to four quarters and said completion was focused on next Diwali.

High-pressure LPG cylinder manufacturing

Management described three high-pressure cylinder manufacturing plants and included the business in its expected five-year growth plan.

3 high-pressure LPG cylinder manufacturing plants · 15+ LPG cylinder manufacturing units

Outlook: High-pressure cylinder manufacturing was expected to grow over the next five years alongside LPG and CNG.

Balance sheet, capex and funding

  • Management said working capital increased to support higher volumes and expanding operations, while also acknowledging a decrease in net working capital 'per se'.
  • Other current assets rose from ₹449 crore to ₹738 crore; management said the roughly ₹290 crore increase mainly reflected supplier advances.
  • Short-term borrowings increased to fund longer U.S. procurement cycles and supplier advances; management called the increase temporary but described the cycle effect as structural.
  • Net debt was stated at close to ₹820 crore, after management first said ₹822 crore.
  • Management expected net debt and working capital to normalize as Middle East supply conditions settled.
  • Over ₹800 crore had been invested in capital over the last five years; management said benefits were now being realized.

The industry, as management sees it

Management views Indian LPG demand as structurally supported by energy security, reliable fuel availability and source diversification, with consumption rising materially through FY26. However, Middle East geopolitical disruptions remain a source of price, availability and procurement-cycle volatility.

Risks management named

  • Middle East geopolitical disruption causing LPG price and availability volatility.
  • Longer U.S. import cycles and supplier advances increasing working capital and short-term borrowings.
  • Customers may switch to alternative suppliers if Confidence cannot match price terms or margins.

Q&A

Q&A focused on working capital and borrowings, durability of customer contracts and volumes, segment economics, the CNG rollout, and shareholder returns. Management was confident on operating growth and service differentiation, but avoided formal FY27 numbers, deferred segment-margin disclosure and left dividend and buyback decisions to internal and Board review; there was no aggressive analyst pushback.

Not answered directly

  • Future supplier advances and the timing of working-capital and net-debt normalisation
  • Segment-wise revenue and EBITDA margins
  • Formal FY27 revenue and PAT guidance
  • Dividend increase and share buyback

Asked for a number, answered without one

  • FY27 full-year revenue, PAT and volumes: Management said it gave no full-year guidance, while stating H2 should be better than H1 and expecting volume, revenue and EBITDA growth in coming quarters.
  • Segment revenue and profitability: Management said it would review the request internally and try to fulfil it; no segment revenue or margin figures were provided on the call.
  • Customer retention and renewal probability: Management attributed retention to service, pricing, sourcing and infrastructure, and said it was confident, but gave no renewal or switching probability.
  • CNG capex completed: Management said capex had been done on 56 stations and that six further stations would become operational, but gave no rupee amount.

Every question, with its answer

  1. 1. Working capital and supplier advances

    Vineet Chaudhary, Individual Investor

    Question. The analyst asked why total assets had risen by about ₹570 crore even though core working capital excluding inventory, receivables and payables had declined, and whether supplier advances explained the increase.

    Answer, Krishna Kumar, Finance Leadership. Krishna Kumar said growth necessarily lifts working capital and that the rise in debt primarily reflected the longer procurement cycle for U.S. LPG imports. He said other current assets increased by almost ₹300 crore, largely representing advances to suppliers, although he did not reconcile the analyst's full ₹570 crore asset movement.

    Follow-up. The analyst asked how much supplier advances had increased.

    Answer. Krishna Kumar said other current assets rose from ₹449 crore to ₹738 crore, a ₹290 crore increase. He attributed the larger portion to supplier advances and said he could not provide a forward amount.

    Partly answered.

  2. 2. Volume growth and FY27 outlook

    Vineet Chaudhary, Individual Investor

    Question. Will volumes and PAT continue in H2 FY27, is the recent performance sustainable, and can management provide a full-year PAT view?

    Answer, Management Representative. Management said volumes should rise as the company uses ready infrastructure, is importing roughly 80,000 metric tons and has added customers under two- to three-year supply agreements. It said no full-year guidance would be given, but expected H2 to be better than H1, citing continued volume, revenue and EBITDA growth and confidence in newer customers.

    Not answered directly.

  3. 3. Customer retention and guidance

    Garvit Goel, Serene Alpha

    Question. How binding are the two- to three-year customer contracts if another supplier offers a lower price, can customers return to PSUs for a 5-10% discount, and what is the renewal outlook beyond the contract term?

    Answer, Management Representative. Management said customers have a first right of refusal but may leave if Confidence cannot meet price terms. It argued formula-based contracts linked to international prices, procurement competitiveness, service standards and cylinder-weight reconciliation would retain them. Customers may keep a second vendor, but management expects Confidence to remain one of two and cited 68 plants versus 14 PSU plants.

    Follow-up. The analyst asked whether the prior 10-15% QoQ revenue and PAT guidance remained intact.

    Answer. Management said it was on the same track, had delivered the prior commitment and intended to deliver in coming quarters. It cautioned that revenue depends on fluctuating LPG prices, while asserting that the bottom line remained on track.

    Partly answered.

  4. 4. Segment economics and CNG rollout

    Samved Valdaman, Mani Valdaman Financial Services Private Limited

    Question. Which segment generates the highest revenue and EBITDA margin, and which segments will management prioritise over the next five years?

    Answer, Management Representative. Management said it would review the request internally and try to provide segment-wise revenue and EBITDA margins later. It said it is pursuing growth across packaged LPG, auto LPG, bulk LPG, Bangalore CNG retailing and high-pressure cylinder manufacturing rather than prioritising one segment.

    Follow-up. After four years of delay in the GAIL India CNG joint venture, when will the 100-station target be completed, given 50 stations are complete?

    Answer. Management said capex had been completed for 56 stations, with further stations expected to come online and the focus initially on raising daily volumes at the existing network. It gave no fixed schedule initially, then targeted 100 stations within three to four quarters, or by next Diwali.

    Not answered directly.

  5. 5. Dividend and share buyback

    Indu Bhushan Thamal, Individual Investor

    Question. Will the dividend increase next year, and why has the promoter not considered a share buyback that would give retail investors an exit opportunity?

    Answer, Management Representative. Management said both proposals involve multiple factors, require internal discussion and Board approval, and cannot be communicated in terms of timing now. It undertook to consider the buyback suggestion but made no commitment on either dividend or buyback.

    Not answered directly.

What was said

Topic by topic, in the order it was spoken

India LPG Demand and Industry Backdrop · Nitin Dinkara (Promoter)

  • Management described India as the world's third-largest LPG consumer, with consumption rising from 26.3 million metric tons in FY20 to 35.04 million metric tons in FY26.
  • Energy security, fuel availability and source diversification were cited as supports for the company's integrated sourcing and distribution model.
  • Middle East geopolitical developments and supply uncertainty continued to cause volatility in international LPG prices and availability.
  • The operating priority was to maintain supply continuity and serve both existing and new customers across segments.

Supply Continuity and Import Response · Nitin Dinkara (Promoter)

  • Bulk LPG and packaged cylinder supplies were prioritised to support industrial, commercial and household customers despite volatile market conditions.
  • The company increased LPG imports from the United States in response to Middle East supply disruptions.
  • Longer procurement cycles and advance supplier payments increased working-capital requirements.
  • Short-term borrowings were used to keep supplies uninterrupted, with management expecting conditions to ease as Middle East supply stabilised.

Integrated Distribution Infrastructure · Nitin Dinkara (Promoter)

  • The supply and logistics platform included four time-chartered LPG vessels, 68 bottling facilities, more than 478 LPG tankers and 225 STVs.
  • Distribution reach comprised 3,400 dealers, 3,400 direct customers and more than 300 industrial customers.
  • Downstream coverage included more than 315 auto LPG dispensing stations, more than 52 CNG retail stations and more than 82 CNG cascade vehicles.
  • Manufacturing included more than 15 LPG cylinder manufacturing units or plants and three high-pressure cylinder manufacturing plants.
  • Management said this integrated network supported supply reliability, efficient service and broader market reach.

Customer Contracts and Business Mix · Nitin Dinkara (Promoter)

  • New long-term supply arrangements were signed with industrial customers and large hotels.
  • Pricing commitments were designed to remain competitive while maintaining reliable supply and long-term customer relationships.
  • The mix was balanced between bulk LPG supplies and packaged LPG sold in cylinders.
  • Management said the contracts and sourcing capability support a strong long-term outlook for the LPG business.

Working Capital and Funding Impact · Nitin Dinkara (Promoter)

  • The extended U.S. procurement cycle required larger advance payments to suppliers.
  • Working-capital needs were funded through short-term borrowings so that customer supply was not interrupted.
  • Management expected working capital and net debt to normalise as Middle East supply conditions stabilised.
  • The company was also seeking to improve asset utilisation and supply-chain efficiency to support growth.

Strategic Growth Priorities · Nitin Dinkara (Promoter)

  • Management planned to strengthen its position in auto LPG and expand the LPG dispensing-station network.
  • Bulk and packaged LPG businesses were identified as areas for continued expansion.
  • Sourcing capabilities and supply-chain reliability were to be enhanced.
  • Operational efficiency and asset utilisation across existing infrastructure were identified as improvement priorities.
  • The company intended to expand its presence in CNG and alternative-energy segments.

Q2 and H1 FY27 Financial Performance · Krishna Kumar (Finance Leadership)

  • Management reported strong consolidated growth and attributed the result to the business model, execution and sustained demand across operating segments.
  • Q2 FY27 revenue was ₹2,235 crore versus ₹983 crore a year earlier, while EBITDA rose 93% to ₹161 crore and margin reached 7.2%.
  • Q2 FY27 PAT increased 246% to ₹59 crore, while EPS rose to ₹2.06 from ₹0.62.
  • H1 FY27 revenue reached ₹4,644 crore, up 122% and almost equal to FY26 revenue of ₹4,705 crore.
  • H1 FY27 EBITDA rose 92% to ₹304 crore and PAT increased 222% to ₹132 crore.
  • Management characterised the half-year result as evidence of scale, operating leverage and profitable growth.

Balance Sheet and Structural Growth · Krishna Kumar (Finance Leadership)

  • Promoter shareholding increased to more than 60%, which management linked to confidence in the company's prospects.
  • Working capital increased to support higher volumes and expanding operations.
  • The rise in short-term borrowings was attributed to longer U.S. import cycles and advance-payment requirements.
  • Management described the borrowing increase as temporary and structurally linked to the extended procurement cycle.
  • Net debt and working capital were expected to normalise as Middle East supply conditions settled.
  • More than ₹800 crore had been invested in capital over the preceding five years, and management said the benefits were now being realised.

In their words

Accordingly, the increase in borrowings is temporary.
Krishna Kumar (Finance Leadership, Confidence Petroleum India Limited)
We believe that our growth is structural and not cyclical.
Krishna Kumar (Finance Leadership, Confidence Petroleum India Limited)
We remain committed to building a sustainable, integrated energy business while creating long-term value for our shareholders and stakeholders.
Nitin Dinkara (Promoter, Confidence Petroleum India Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • Whether Q3 FY27 revenue grew 10-15% QoQ, which management qualified with LPG-price volatility.
  • Whether PAT delivered the 10-15% QoQ path management said remained on track.
  • Whether H2 revenue and EBITDA began to exceed H1, as management expected.
  • Whether net debt and working capital normalized as Middle East supply conditions settled.
  • Progress on six more CNG stations becoming operational and toward 100 stations by next Diwali.
  • Volume additions from new industrial and hotel customers and continued supply continuity.

Transcript

Read along with the recording

The whole call, 153 lines from 9 speakers over 37:45. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.

Sign up freeLog in

The stock after the call

No session has closed since the call yet.

From the close of Thu 19 Nov 2026, ₹70.10: the call began at 16:00 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.

Confidence Petro Ind's other calls

  • Q1 FY27Fri 21 Aug 2026Tone: Optimistic