In brief

H1 revenue rose 17.4% to INR 645 million, PAT turned positive, and FY27 targets were about INR 2,000 million revenue and INR 200 million PAT.

Management's tone
Mixed
What was said
Leaned positive
Guidance
First guidance issued
Analyst pushback
High
Stock, next session
+8.00% (Nifty 50 +0.38%)
  • H1 revenue grew 17.4% to INR 645 million; EBITA margin reached 6.9% after a 589 bps expansion, and PAT was INR 8.7 million.
  • Management attributed the turnaround to stronger telecom order flow, better cost control and new businesses starting to contribute.
  • Management targeted FY27 revenue of approximately INR 2,000 million and PAT of approximately INR 200 million, expecting H2 to exceed H1.
  • An Indus Towers LOI worth INR 919.7 million, excluding GST, covers cellular DAS across Delhi Metro stations and tunnels, with completion by March 2027.
  • Management set FY28 targets of revenue above INR 5,000 million and EBITDA above INR 750 million.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY27

This quarterA year agoLast quarterMargin
Revenue₹64.5 cr+17.4%—
EPS (₹)₹0.56——

From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call.

What moved the numbers, as management explained it

  • Revenue from operations rose 17.4% Y-o-Y to INR 645 million as stronger telecom order flow and new businesses beginning to contribute lifted volume.
  • EBITA excluding other income increased to INR 44.4 million from INR 5.5 million; management linked the 6.9% margin to better cost control.
  • PAT turned positive at INR 8.7 million against a prior-year loss of INR 10.2 million; the comparison base followed the previous year's difficult industry phase.
  • H1 revenue was mainly the telecom and EMS run-rate business; CCTV's planned contribution was delayed by pending STQC approval.
  • H2 revenue was expected to be larger on the Indus DAS order, which management sized at about INR 92 crore, although FY25 also had a proportionately stronger H2.

The numbers management led with

  • Indus Towers Delhi Metro DAS order: INR 919.7 million excluding GST; supply and installation scheduled for completion by March 2027
  • Annual cellular DAS market opportunity: INR 300 crore to INR 400 crore per annum
  • VLS Developers acquisition consideration: INR 360 million for 100% of VLS Developers Private Limited
  • Design-led manufacturing PLI incentives: Over INR 660 million, applicable until March 2027

Guidance

Guidance on this call

WhatForWhat management said
Financial year 27 revenueFY27FY27 revenue of approximately INR 2,000 million.
Profit after taxFY27FY27 profit after tax of approximately INR 200 million.
Financial year 28 revenueFY28FY28 revenue of more than INR 5,000 million.
Financial year 28 EBITDAFY28FY28 EBITDA of more than INR 750 million.
CCTV revenueFY28FY28 CCTV revenue of around INR 200 crores.
EMS revenueFY28FY28 EMS revenue of about INR 100 crores.
Telecom revenueFY28FY28 Telecom revenue of about INR 200 crores plus.
EMS revenueFY27FY27 EMS revenue of INR 12 crores to INR 15 crores.
EBITDA marginFY28Management reaffirmed confidence in a 15% consolidated EBITDA margin for FY28.
EMS business margin—EMS business margins expected to be double-digit.
DAS and non-DAS revenue mix (Telecom)FY28DAS and non-DAS telecom revenue expected to be around 50-50 in FY28.
STQC certification approvals (CCTV)Q3 FY27Some STQC approvals possibly in November or early December, with more by end December.
SMT lines (EMS)FY27-FY28Another SMT line possible in FY27; all four SMT lines in place by end FY28.
Indus Towers DAS project completion (Telecom)FY27Indus Towers DAS supply and installation scheduled for completion by March 2027.
Execution and portfolio milestones—LigoWave production and main-board migration are expected in FY27; VLS should close in 45 days to two months; surveillance and EMS should lead within 2-3 years.

The business

By business

Telecom (DAS and Operator)

Core telecom rebounded on stronger operator order flow. Frog received an Indus Towers LOI for cellular DAS across Delhi Metro stations and tunnels, with supply and installation due by March 2027.

Indus Towers LOI INR 919.7 million excluding GST

Outlook: FY28 Telecom revenue of INR 200 crores plus; management expected a roughly 50-50 DAS/non-DAS mix and continued airport and metro pipeline growth.

Electronic Manufacturing Services

The Noida SMT line was fully operational and fully loaded on one shift. A five-year LigoWave alliance adds branded wireless-radio manufacturing, Indian distribution and an export channel.

5-year LigoWave alliance · 1.6 lakh square feet Noida facility · Space for 3 more SMT lines

Outlook: FY27 EMS revenue of INR 12 crores to INR 15 crores; FY28 revenue target of INR 100 crores, with another line in FY27 and all four lines by FY28.

CCTV (FROG EYES)

FROG EYES had 27 IP camera models, while STQC approval was delayed by company and SoC-vendor fixes; management expected approvals during November-December 2026.

27 IP camera models

Outlook: FY28 CCTV revenue of around INR 200 crores, targeting government, PSU, airports, operators and North India distributors after approval.

AI EYE

AI EYE, an analytics platform working across CCTV brands, was live in customer trials for fire, intrusion, crowding, PPE, facial and number-plate recognition.

Outlook: Management aimed to convert trials into paid deployments.

Get Five Bars

Operator proof-of-concept and end-user interest were strong, but commercialisation remained subject to operator approval.

Potential annual market INR 100 crores to INR 200 crores

Outlook: Management said Get Five Bars could address an INR 100-200 crore annual market after operator approval.

Defense Solutions

Defense solutions were in trials with positive feedback.

Outlook: Management called the timing unpredictable and included no defense revenue in its projections.

DCRA and 5G Site Implementation

DCRA building-certification adoption was slow and voluntary, while the 5G site implementation business was already operational and included in current numbers.

Outlook: DCRA was expected to remain slow over the next few quarters, although government was considering making digital ratings mandatory.

Balance sheet, capex and funding

  • VLS acquisition consideration was INR 36 crores for the land and existing shed; management said it would be funded through internal accruals and a term loan.
  • No additional capex for the acquired property had been planned or decided.
  • For future growth, management planned to rely on internal accruals and existing bank limits, with market fundraising as the last choice.

The industry, as management sees it

Telecom DAS demand is recovering as operators resume network spending and metros, airports and stadiums expand 4G and 5G coverage; the cellular DAS market was estimated at INR 300–400 crore annually. CCTV supply is becoming more competitive as seven to eight STQC-certified players emerge, although management believes a substantial portion of demand remains underserved.

Risks management named

  • STQC approval depends on internal fixes and SoC-vendor remediation, firmware changes and retesting.
  • Delivering the H2 revenue bridge depends materially on the Indus order and conversion of other large DAS opportunities.
  • Get Five Bars commercialization depends on operator approval.
  • DCRA adoption remains slow and voluntary; defense revenue timing is unpredictable.
  • Follow-on capex for the VLS plant is undecided and may require additional internal accruals or debt.
  • EMS ramp relies on new customer engagements and successful conversion of the LigoWave alliance.

Q&A

Q&A centered on STQC approval timing, FY28 segment and margin targets, and conversion of the H2 order pipeline. The certification concern was pressed by multiple analysts, producing both a firm end-December timing and a refusal to guarantee the outcome; management also pushed back on questions about SoC-vendor identity and declined several requests for quantified capex or pipeline detail.

Not answered directly

  • STQC certification certainty
  • SoC vendor identity and remediation dependency
  • Quantified DAS pipeline and conversion timing
  • Additional VLS plant expansion capex
  • Current bundled DAS and Wi-Fi commercial arrangements

Asked for a number, answered without one

  • Additional VLS plant capex: Management said the next growth phase had not been planned or decided; the INR 36 crores covered the land and existing shed.
  • DAS order pipeline value: Management said several large orders were under discussion but could not give a closing timeline or order value; it cited a INR 300-400 crore annual DAS market.
  • Emerging-business revenue contribution: 5G implementation was already part of the business; DCRA was slow, Get Five Bars awaited approval, and defense had no numbers included in projections.
  • EMS margin rate: Management expected double-digit margins from the EMS business but did not provide a specific margin percentage.

Every question, with its answer

  1. 1. CCTV STQC and FY28 revenue

    Sanchita Sood, RoboCapital Limited

    Question. When is STQC certification expected for the CCTV portfolio, and what CCTV revenue is targeted for FY28?

    Answer, Konark Trivedi, Managing Director and Founder. Konark said some approvals may arrive in November or early December and the rest by end-December, after firmware and testing fixes. He set an FY28 CCTV revenue target of around INR 200 crore out of an overall INR 500 crore target.

  2. 2. SMT capacity expansion

    Sanchita Sood, RoboCapital Limited

    Question. The analyst followed up on EMS capacity: with one SMT line operational and room for three more, when will all four lines be in place?

    Answer, Konark Trivedi, Managing Director and Founder. Konark expects another line possibly within FY27 and all four lines by end-FY28. The common infrastructure can support EMS, CCTV and telecom products.

    Follow-up. When can the next three SMT lines come on stream?

    Answer. Another line may be added within FY27, with all four lines expected by end-FY28.

  3. 3. FY28 mix, competition and margins

    Ankit Gupta, Bamboo Capital Limited

    Question. For FY28, what is the segment mix behind INR 500 crore; how much telecom is DAS versus non-DAS; what supports INR 100 crore EMS and INR 200 crore CCTV; how many CCTV players have STQC certification; and why is 15% company EBITDA margin achievable?

    Answer, Konark Trivedi, Managing Director and Founder. Management gave a rough FY28 mix of INR 200 crore telecom, INR 200 crore CCTV and INR 100 crore EMS, with telecom about 50% DAS and 50% non-DAS. EMS rests on a fully loaded single-shift SMT line and advanced EV-charger, LED-panel and laptop engagements; CCTV will target government and PSUs, airports, operators and North India distributors. Konark cited peer margins above 15% and said roughly seven to eight certified CCTV players exist, with demand still concentrated among larger firms.

    Partly answered.

  4. 4. VLS capacity, funding and DAS pipeline

    Dalpat D. Mehta, Sun City Advisors LLP

    Question. When will the VLS acquisition close and the plant become operational; what additional capex and funding are required; what is the DAS order pipeline; and when will the main-board migration occur?

    Answer, Konark Trivedi, Managing Director and Founder. VLS was expected to close within 45 days to two months; the acquired land and shed would be used as demand grows, but no follow-on expansion capex was planned. Funding would primarily use internal accruals and existing bank limits, with market fundraising the last choice. Management said the airport and metro DAS pipeline is large and several orders were under discussion, without quantification, and targeted NSE main-board migration within FY27.

    Not answered directly.

  5. 5. STQC timing and H2 order visibility

    Darshil Jhaveri, Crown Capital Limited

    Question. What is the firm STQC timeline and cause of delay; can FY28 CCTV revenue be achieved if approvals slip; what supports a much larger H2; and are there other large DAS orders in the pipeline?

    Answer, Konark Trivedi, Managing Director and Founder. Konark attributed the delay to thorough checks and SoC-vendor remediation, said some models could be approved in the first week of December and the rest by end-December. He said FY27 numbers do not depend on STQC and all approvals should be secured within FY27 even allowing a three-month buffer. The Indus order contributes about INR 92 crore before March; several other large orders were discussed but not quantified.

    Not answered directly.

  6. 6. STQC certification certainty

    Sumit Meena, NovaWealth Capital

    Question. Can management be 100% certain that the long-pending STQC certifications will arrive by the end of November and December?

    Answer, Konark Trivedi, Managing Director and Founder. Konark said the approval process is like an exam and cannot be guaranteed until certification is received; he described the company as hopeful, not certain.

    Not answered directly.

  7. 7. EMS economics and CCTV target bridge

    Sandeep Kumar, Unknown

    Question. How will the delayed INR 50 crore CCTV target be recovered, and what margins and current-year revenue should the SMT line generate?

    Answer, Konark Trivedi, Managing Director and Founder. Konark said H1 revenue mostly came from run-rate telecom and EMS, which continues into H2, while the Indus DAS project supplies incremental H2 delivery; STQC was not required for FY27 numbers. He expects EMS margins to be double-digit under branded alliances, but did not quantify FY27 EMS revenue in this answer.

    Partly answered.

  8. 8. EMS strategy and SoC dependency

    Tarun Kumar Khatri, Unknown

    Question. Does LigoWave expand Frog into telecom infrastructure or services; can products be cross-sold with DAS; is SMT capacity common across businesses; what is FY27 EMS revenue; and which SoC vendors support STQC remediation?

    Answer, Konark Trivedi, Managing Director and Founder. Konark said Frog will manufacture and sell LigoWave radios and access points under its own brand to enterprises, B2C customers and distributors, while installation remains with system integrators; it is not pursuing BOT-style infrastructure services. Cross-selling with DAS customers is intended, and one SMT line can serve EMS, CCTV and telecom products. He put FY27 EMS revenue at INR 12–15 crore, described current output as pilot phase, and declined to name the SoC vendors, citing confidentiality.

    Not answered directly.

  9. 9. New-business commercialization

    Priyam Shah, Value Equity Capital Limited

    Question. Please update Get Five Bars, defense solutions, DCRA and 5G site implementation, including commercialization timelines and expected revenue contribution.

    Answer, Konark Trivedi, Managing Director and Founder. Konark began responding on 5G site implementation and DCRA, but the participant's connection dropped. The moderator suspended the question and later invited Priyam Shah back into the call.

    Not answered directly.

  10. 10. DAS pipeline and competitive position

    Nidhi Rastogi, Unknown

    Question. How should the DAS pipeline be characterized by opportunity size and conversion timelines, what is Frog's competitive advantage, and can the pipeline be quantified?

    Answer, Konark Trivedi, Managing Director and Founder. Konark cited deployed airport references and the Delhi Metro installation as proof of capability, and said metro, airport and large-venue projects are at different discussion stages. He quantified only the annual cellular DAS opportunity at INR 300–400 crore, without project-level pipeline or conversion timing, and described Frog as the leading DAS vendor.

    Not answered directly.

  11. 11. Get Five Bars, DCRA and defense

    Priyam Shah, Value Equity Capital Limited

    Question. After reconnecting, Priyam Shah resumed the request for updates on Get Five Bars, defense, DCRA and 5G site implementation, including timelines and revenue potential.

    Answer, Konark Trivedi, Managing Director and Founder. 5G site implementation is already contributing. DCRA is slow because adoption is voluntary and awareness is low, though government may mandate it; Get Five Bars awaits operator approval but could address a INR 100–200 crore annual market. Defense trials have positive feedback, but maturation is unpredictable and no revenue is included in projections.

    Follow-up. What are the commercialization timelines and expected revenue contributions for Get Five Bars, defense, DCRA and 5G implementation?

    Answer. 5G implementation is ongoing; DCRA and defense remain slow; Get Five Bars awaits operator approval and represents a potential INR 100–200 crore annual market.

  12. 12. Capex, metro expansion and CCTV exports

    Darshil Jhaveri, Crown Capital Limited

    Question. How much capex will be required over the next one to two years, what is the opportunity from new metro lines, and could CCTV be exported before STQC approval?

    Answer, Konark Trivedi, Managing Director and Founder. No quantified capex plan was provided. Management said every metro, airport and stadium expansion creates a DAS opportunity, subject to infrastructure-provider and operator business cases, while reiterating the INR 300–400 crore annual cellular DAS market. CCTV exports are not being pursued; management will focus first on STQC and the Indian market.

    Follow-up. Please quantify capex and the metro opportunity, and explain whether CCTV exports can bridge the STQC delay.

    Answer. Capex was not quantified; all infrastructure expansions are viewed as DAS opportunities, but CCTV exports are not currently being explored.

    Not answered directly.

  13. 13. Bundled connectivity and DCRA

    Tarun Kumar Khatri, Unknown

    Question. Is Frog discussing bundled DAS and unlicensed Wi-Fi deployments, and what progress and revenue stream are expected from Get Five Bars and the building-connectivity certification business?

    Answer, Konark Trivedi, Managing Director and Founder. Konark said DAS currently covers equipment and installation, while access points and UBR are a separate segment; common buyers create future cross-selling potential, but no bundled commercial arrangement was disclosed. He repeated that DCRA adoption would remain slow over the next few quarters until mandatory rules or awareness improve.

    Follow-up. Are there talks to provide DAS and Wi-Fi as bundled services, and what progress is being made in the connectivity-certification businesses?

    Answer. Cross-selling is an intended future opportunity, but no current bundled arrangement was disclosed; DCRA adoption remains slow.

    Not answered directly.

What was said

Topic by topic, in the order it was spoken

H1 Turnaround and Performance Drivers · Konark Trivedi (Managing Director and Founder)

  • H1 FY27 revenue from operations grew 17.4% Y-o-Y to INR 645 million; EBITA margin rose 589 bps to 6.9%, and PAT returned to profit.
  • Management attributed the turnaround to stronger telecom order flow, better cost control and early contributions from EMS and CCTV.
  • Konark framed H1 as evidence that FY26's restructuring and new growth engines were beginning to convert into results.

DAS Recovery and Indus Towers Order · Konark Trivedi (Managing Director and Founder)

  • Indus Towers issued an LOI worth INR 919.7 million, excluding GST, for cellular DAS across Delhi Metro stations and connecting tunnels.
  • Supply and installation are scheduled for completion by March 2027.
  • Management called the project validation of its proprietary OneDAS engineering and metro-tunnel execution capability.
  • OneDAS was already live at Navi Mumbai, Mumbai, Noida, Guwahati, Lucknow and Delhi airports.

Operator Relationships and DAS Pipeline · Konark Trivedi (Managing Director and Founder)

  • Management said prior disputes between infrastructure providers and mobile operators had eased, returning DAS projects to the pipeline.
  • Frog continued supplying Airtel and Vodafone Idea; Vodafone Idea's investment picked up as funding eased.
  • Jio joined as a customer, beginning with RF repeaters and testing a wider product set.
  • Management cited similar opportunities across metros, airports and high-density venues.

EMS Manufacturing Scale-up · Konark Trivedi (Managing Director and Founder)

  • The Noida SMT line was fully operational, making smart meters, induction heaters, power adapters, EV chargers and other products.
  • It currently runs one shift; moving to two shifts could roughly double output without new capital.
  • The 1.6 lakh square feet facility had room for three additional SMT lines.

FROG EYES, STQC and AI EYE · Konark Trivedi (Managing Director and Founder)

  • FROG EYES comprised 27 IP camera models across 2 MP, 5 MP and 8 MP in dome, bullet and varifocal formats.
  • STQC certification became mandatory for imported CCTV from April 1, 2026, favoring compliant Indian manufacturers.
  • Management cited the Indian surveillance market growing from $4.84 billion in 2026 to $7.77 billion by 2031.
  • AI EYE was in live customer trials; the immediate goal was conversion into paid deployments.

LigoWave Manufacturing Alliance · Konark Trivedi (Managing Director and Founder)

  • The five-year LigoWave alliance made Frog licensed manufacturer, distributor, system integrator and service partner in India.
  • The pact also created an export channel by supplying finished LigoWave-branded products.
  • Noida production of Wi-Fi 6 and Wi-Fi 7 products was scheduled to start during the year.
  • Management cited a Wi-Fi market rising from INR 40,000 million in FY25 to over INR 83,000 million in FY32.

VLS Acquisition and Capacity · Konark Trivedi (Managing Director and Founder)

  • The board approved acquiring 100% of VLS Developers for INR 360 million, replacing a direct purchase of the same assets.
  • Funding would come from internal accruals and a term loan; completion was expected within about two months.
  • VLS owns the land and factory shed, providing space to scale CCTV and EMS beyond Noida.

Main Board and New Initiatives · Konark Trivedi (Managing Director and Founder)

  • Shareholders approved migration from NSE SME Emerge to the NSE main board, which management expects to broaden investors and liquidity.
  • Get Five Bars had operator proof-of-concept activity and strong end-user interest, but launch awaited operator approval.
  • Defense trials had positive feedback, while DCRA and 5G site implementation services were building steadily.

FY27 Financial Outlook · Konark Trivedi (Managing Director and Founder)

  • FY27 guidance was approximately INR 2,000 million revenue and INR 200 million profit after tax.
  • Management expected H2 to be larger, supported by Indus execution, new DAS orders, full operator activity and EMS orders.
  • FROG EYES was expected to add contribution once STQC approval was received.

FY28 Vision and Growth Platform · Konark Trivedi (Managing Director and Founder)

  • The FY28 vision was more than INR 5,000 million revenue and more than INR 750 million EBITDA.
  • Four growth engines were identified: connectivity, surveillance, AI electronics manufacturing and services.
  • Management expected surveillance and EMS to become the largest businesses within two to three years.
  • Design-led manufacturing PLI incentives exceeded INR 660 million and remain applicable until March 2027.

In their words

I always say and I always believe that unless the thing is done, it's not done.
Mr Konark Trivedi (Managing Director and Founder, Frog Innovations Limited)
Frog is the only Indian company with proprietary technology to manufacture and deploy DAS systems.
Mr Konark Trivedi (Managing Director and Founder, Frog Innovations Limited)
Looking ahead, we are confident of returning to financial year 25 levels this year with financial year 27 revenue of approximately INR 2,000 million and profit after tax of approximately INR 200 million.
Mr Konark Trivedi (Managing Director and Founder, Frog Innovations Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • STQC approvals: some models were expected by early December and the remainder by end-December 2026.
  • Indus Towers Delhi Metro DAS supply and installation: completion was scheduled for March 2027.
  • FY27 delivery: revenue of about INR 2,000 million and PAT of about INR 200 million, with H2 expected to exceed H1.
  • EMS: FY27 revenue of INR 12-15 crore, another SMT line within FY27 and all four lines by FY28.
  • VLS: acquisition was expected to close within 45 days to two months, after which management planned to use the existing shed.
  • Main-board migration and LigoWave production at Noida were both expected within FY27.

Transcript

Read along with the recording

The whole call, 235 lines from 3 speakers over 1:01:00. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.

Sign up freeLog in

The stock after the call

After the callCloseStockNifty 50
Next session Tue 17 Nov 2026₹324.65+8.00%+0.38%

From the close of Mon 16 Nov 2026, ₹300.60: the call began at 16:30 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.