Frontier Springs Q2 FY26 earnings call

Fri 14 Nov 2025FRONTSP

In brief

Frontier Springs Q2 FY26: revenue ₹82.74 cr (+58%), EBITDA doubles to ₹22.07 cr; reaffirms FY26 ₹375 cr gross & FY27 ₹500 cr guidance.

Management's tone
Confident
What was said
Leaned positive
Guidance
Guidance held
Analyst pushback
Low
  • Q2 FY26 revenue ₹82.74 cr (+58.4% YoY), EBITDA ₹22.07 cr (+106.5%), PAT ₹15.71 cr (+115.5%); margin 26.7% vs 21-22% earlier guidance.
  • H1 FY26 gross revenue ₹187 cr; on track for FY26 gross revenue ₹375 cr; Alstom orders expected in 1-1.5 months.
  • FY27 gross revenue ₹500 cr target reaffirmed; 5-year aspiration of ₹1,000 cr with continued railway primacy.
  • FY26 capex ₹15 cr; ₹8 cr already spent in H1, ₹7-8 cr remaining, funded from internal accruals with no debt.
  • FIBA product targets ₹40-50 cr post 6-8 month trial; commercialization next FY H2; incremental testing capex ₹2 cr.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY26

This quarterA year agoLast quarterMargin
Revenue₹82.7 cr+58.4%+9.8%
EBITDA (excl. other income)₹22.1 cr+106.5%+8.1%26.7% (20.5% a year ago)
Net profit₹15.7 cr+115.5%+6.5%19% (14% a year ago)
EPS (₹)₹79.28+274.0%+97.7%

From the company's filed results for the quarter ended 30 Sept 2025 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Volume: Railway tender deliveries and air spring demand from new LHB/Vande Bharat coaches drove Q2 revenue +58.4% YoY.
  • Mix: Higher-margin Air Spring contribution and ongoing Coil Spring railway demand lifted blended margin.
  • Price: Management cited improving sales price realization as a margin lever.
  • Cost: Operating leverage from higher capacity utilization on 2-ton and 3-ton hammers (60-70%) supported the margin expansion.
  • Distortion to note — 6-ton hammer still at only 10-20% utilization, so margin upside from this asset has not yet flowed through.

The numbers management led with

  • FY26 capex commitment: INR 15 crores across Coil Spring, Air Spring and Forging divisions; INR 8 crores done in H1 FY26
  • FY27 advance orders already booked: INR 60-80 crores already received against FY27
  • FY26 year-end order book target: INR 200-250 crores expected in hand
  • IR coil spring market share: ~40% of Indian Railway demand

Guidance

Guidance on this call

WhatForWhat management saidFiled
FY26 gross revenueFY26Gross revenue amounting to INR 375 crores for the full Fiscal Year FY26₹322 cr, below the figure guided (standalone)
FY27 gross revenueFY27Progressing to INR 500 crores gross revenue in the following year—
FY26 EBITDA marginFY26At least 27% margin expected; confident to close year at the same range of margins26.8%, within the range (standalone)
Forging FY26 revenueFY26Planning to close FY26 around INR 75 crores to INR 80 crores in Forging—
Forging FY27 revenueFY27May touch around INR 100 crores to INR 115 crores next year in Forging—
FIBA revenue post-trial (Air Springs)FY27After successful trial, get around INR 40 crores to INR 50 crores business from FIBA—
FY26 total capexFY26Doing around INR 15 crores CAPEX across the three divisions in FY26—
Order book by FY26 year-endFY26Around INR 200 crores to INR 250 crores order in hand after closing this year—
FIBA incremental capex (Air Springs)FY26Around INR 2 crores for testing machines for FIBA—
NSE listing targetQ1 FY27Planning NSE listing in the next financial year's first quarter—
FY27 orders already receivedFY27INR 60 crores to INR 80 crores of FY27 orders already received—
5-year revenue aspirationFY26-FY30Targeting INR 1,000 crores in the next 5 years—

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

What changed since the Thu 29 May 2025 call

WhatOn the Thu 29 May 2025 callOn this call
FY26 gross revenue target (held)Raised to ₹375 cr from ₹350 cr; called conservativeReaffirmed at ₹375 cr; flagged possible upside toward ₹400 cr but declined to commit higher
FY27 gross revenue target (held)₹500 cr maintained and called conservative₹500 cr reaffirmed; said could be exceeded by FIBA/defense contributions
FY26 EBITDA margin (raised)Guided 21% with 22-23% aspirationQ2 actual 26.7%; expects to close year at similar level
FY26 capex (held)₹15 cr earmarked across coil/air/forging₹15 cr reaffirmed; ₹8 cr already spent in H1
Order book by FY26 end (held)₹200-250 cr at call date vs ₹150 cr on April 1₹200-250 cr expected by year-end after current-year execution
Air spring market share target (raised)Targeted to rise from ~25% to 30%Stated current air spring market share at ~40% of railway demand
NSE listing timing (restated)Pursue if eligibility criteria can be met (no date)Targeted for next financial year Q1 (Q1 FY27)
Forging segment revenue targets (new)Not quantified as a separate targetFY26 ₹75-80 cr; FY27 ₹100-115 cr (₹20-25 cr incremental from new markets)
FIBA product development (new)Not discussedIn-house developed; RDSO approval applied; samples by Dec-end; 6-8 month trial; commercialization from FY27 H2
Contitech/Alstom metro-OEM partnership (achieved)Win metro-OEM air spring business via Contitech (Siemens, Bombardier, Alstom)Alstom orders expected to commence within 1-1.5 months

Guided on earlier calls, and what was filed

WhatForGuidedFiled
Gross revenue FY26FY26₹375 cr (on the Q4 FY25 call)₹322 cr, below the figure guided (standalone)
EBITDA marginFY2622–23% (on the Q4 FY25 call)26.8%, above the range (standalone)

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Air Springs

Q2 revenue ~₹35 cr; market share ~40%; Continental Germany tie-up cited as edge; Alstom orders expected within 1-1.5 months; metro-OEM push ongoing.

Q2 revenue ~₹35 cr · Market share ~40% · FIBA TAM ~₹100 cr · FIBA target ₹40-50 cr post trial · FIBA capex ~₹2 cr

Outlook: FIBA commercialization from FY27 H2 after trial; Alstom orders imminent; metro-coach expansion with increasing annual demand.

Coil Springs

Q2 revenue ~₹35 cr; market share ~40%; demand steady from railway primary suspension and LHB coach conversion.

Q2 revenue ~₹35 cr · Market share ~40%

Outlook: Railway demand visibility 4-7 years; remains part of metro coach bundle alongside air springs and FIBA.

Forging

Q2 revenue ~₹16-17 cr; FY26 target ₹75-80 cr, FY27 ₹100-115 cr; 6-ton hammer capacity utilization just 10-20%; defense entry still at sample stage.

Q2 revenue ~₹16-17 cr · FY26 target ₹75-80 cr · FY27 target ₹100-115 cr · 6-ton hammer utilization 10-20% · 3-ton/2-ton hammer utilization 60-70%

Outlook: Capacity utilization to improve through year-end; defense samples under long development; ₹20-25 cr of FY27 forging from new markets/customers.

Balance sheet, capex and funding

  • FY26 capex ~₹15 cr across Coil Spring, Air Spring and Forging; H1 already incurred ₹8 cr, balance ₹7-8 cr planned in next 6 months.
  • Capex fully funded from internal accruals/ploughed-back profits; no loans taken for capacity expansion.
  • Incremental ₹2 cr being invested in testing machines for the new FIBA product; advances already placed.
  • H1 FY26 operating cash generation evident from EBITDA of ₹42.5 cr (+107.9% YoY) and PAT ₹30.45 cr.
  • Order book visibility: ₹60-80 cr of FY27 orders already received; expected ₹200-250 cr order in hand by FY26 year-end.

The industry, as management sees it

Management sees exceptionally strong 4-7 year demand visibility from Indian Railways given replacement of ~15,000 ICF coaches over 3 years, ~6,000-7,000 annual new coach production, and the government's railway modernization program. MD expects demand to keep rising for the next 10 years, with upside from metro-coach conversion to air springs and a longer-dated option from the bullet-train project (3+ years away).

Risks management named

  • Margin variability: MD flagged 1-2% swings around the 27% EBITDA level on tender pricing dynamics
  • Rail delivery schedule binds quarterly run-rate; wagon-order upside may not flow into H2 FY26 P&L
  • Defense product commercialization still in long development cycle; timing uncertain
  • New-entrant risk in air/coil springs acknowledged; MD cites 2-year approval cycle as moat

Q&A

Q&A was dominated by three threads: (1) why EBITDA margins leapt to ~27% from the prior 21-22% guide and whether that is sustainable, (2) FIBA economics, addressable market and approval timing, and (3) defense and metro diversification potential. Management fielded every question with high confidence and disclosed granular FIBA economics (INR 1 lakh/coach x 6,000 coaches = INR 60 cr; plus Vande Bharat ~INR 100 cr total). The only mild pushback came from Ankur Kumar and Garvit Goyal on H2 acceleration potential, where the MD stuck to a conservative message that railways' fixed annual delivery schedule governs quarterly run-rate regardless of underlying demand. No major red flags surfaced.

Not answered directly

  • Defense product TAM — MD declined to specify exact addressable market citing confidentiality on the item
  • Bullet train opportunity — MD deferred, citing project is 3+ years from operating in India
  • FIBA exact market share target — MD gave a post-trial range (INR 40-50 cr) but no committed share

Asked for a number, answered without one

  • Defense forging market size: Said it is a huge market spanning defense, mining and road construction equipment, but declined to name the item or quantify the addressable market.
  • Post-FY27 product expansion path: Said ₹1,000 cr in 5 years is targeted but going from ₹500 cr to ₹1,000 cr requires a big jump with new product lines still at a very initial basis that cannot be revealed on the call.

Every question, with its answer

  1. 1. EBITDA margin driver

    Priyanshu Jain, GrowthX Infinity

    Question. Congrats on strong results. In our prior conversation you said 21-22% EBITDA margins were sustainable. Q2 came in at ~27% — what's driving the upside?

    Answer, Kapil Bhatia, Managing Director. We are improving sales price and capitalizing on railway demand; it's an opportunity to have that much margin in the product. Hope to close year in the same range.

    Follow-up. So we can expect 27% / 26% margins sustainable going forward?

    Answer. Yes, at least for this year I am confident we will be doing this.

  2. 2. Product mix revenue

    Priyanshu Jain, GrowthX Infinity

    Question. Can you give the Q2 revenue breakup across the three divisions — Air Springs, Coil Springs and Forging?

    Answer, Kapil Bhatia, Managing Director. Air Springs around INR 35 crores, Coil Springs around INR 35 crores, and Forging around INR 16-17 crores this quarter.

  3. 3. Order pipeline

    Priyanshu Jain, GrowthX Infinity

    Question. Are we targeting tenders in the pipeline? What kind of order book can we expect by FY26 end?

    Answer, Kapil Bhatia, Managing Director. We already have INR 375 crores of orders to close the year. For FY27, INR 60-80 crores orders already received. By year-end, order book should be around INR 200-250 crores.

  4. 4. FY26 / FY27 revenue & margin guidance

    Akshay Kaila, AK Invest

    Question. We've already done INR 158 cr in H1. Confident of the remaining INR 217 cr in H2 FY26? And INR 500 cr in FY27? Will margins stay at 27% into FY27?

    Answer, Kapil Bhatia, Managing Director. INR 375 cr is gross revenue. We've already crossed INR 187 cr gross in H1; in line with INR 375+ this year, INR 500 cr next year. On margins, 1-2% minus/plus may happen due to tender business, but we will try to remain at same level.

  5. 5. FIBA opportunity

    Akshay Kaila, AK Invest

    Question. On FIBA awaiting RDSO approval: total addressable market in India, and is this a new product or already used by Indian Railways?

    Answer, Kapil Bhatia, Managing Director. Already in use but imported by 1-2 foreign players. RDSO approval applied; samples ready December-end; will patent. ~6,000 coaches made annually at INR 1 lakh/coach ≈ INR 60 cr market; plus Vande Bharat = INR 100 cr market.

  6. 6. FIBA competitive position

    Akshay Kaila, AK Invest

    Question. So we will be the first domestic player to get RDSO approval?

    Answer, Kapil Bhatia, Managing Director. 1-2 more people also in the line. Cannot say I'm the only one, but we are early; should get good market share with good profit margins.

    Partly answered.

  7. 7. FIBA margin profile

    Akshay Kaila, AK Invest

    Question. If approved, order inflow starts from next FY — is FIBA at similar margin level to our current products?

    Answer, Kapil Bhatia, Managing Director. Almost similar margin level. Product ready by December end, approval follows, then 6-8 month trial; H2 FY27 onwards (December next year) we will be able to supply more, which will reflect in sales.

  8. 8. H1 vs H2 revenue pacing

    Garvit Goyal, Nvest Analytics Advisory

    Question. H1 gross revenue is INR 187 cr against INR 375 cr full-year target, so H2 would be muted. Is that right? If so, why — since H2 last year was much better than H1?

    Answer, Kapil Bhatia, Managing Director. We're right on target — INR 187 cr in H1 against INR 375 cr gross. Railway has a fixed delivery schedule; if we execute here we won't get paid and they may not accept material. Must adhere to IR delivery schedule.

  9. 9. Defense product & TAM

    Garvit Goyal, Nvest Analytics Advisory

    Question. What's the update on the defense product getting approved? And the TAM for those items?

    Answer, Kapil Bhatia, Managing Director. Defense item is still in development — long cycle; samples made, next year may begin supplies. TAM is large, not only defense but also mining and road construction equipment.

    Partly answered.

  10. 10. Beyond-FY27 growth levers

    Garvit Goyal, Nvest Analytics Advisory

    Question. Beyond FY27, how do you plan to scale? Any color on the next leg of growth after the clear INR 500 cr FY27 target?

    Answer, Kapil Bhatia, Managing Director. For Forging this year INR 75-80 crores, next year INR 100-115 crores — the INR 20-25 cr incremental will come from new markets and new players we are targeting.

  11. 11. FIBA per-coach mechanics

    Yashovardhan Banka, Tiger Assets

    Question. On FIBA: 2 devices per coach and ~15 coaches in Vande Bharat — for every air spring already installed, is this a modification/replacement or an addition?

    Answer, Kapil Bhatia, Managing Director. Wherever air springs are installed — Vande Bharat, metro, LHB — FIBA is already there, currently imported. We are developing in India, ahead of others. Each coach has 2 bogies, each bogey 2 air springs; every bogey requires 1 FIBA + 4 indicators for 4 air springs.

  12. 12. FIBA target share & capex

    Yashovardhan Banka, Tiger Assets

    Question. On the INR 100 cr FIBA TAM, what share are you targeting from next year? Any incremental capex needed?

    Answer, Kapil Bhatia, Managing Director. After a successful trial, should get INR 40-50 crores business. INR 100 cr is just Vande Bharat + LHB; air spring should be approved for metro by then, plus aftermarket on rolling stock — continuous demand. Manufacturing uses existing capacity; ~INR 2 crores for testing machines — already investing, advances paid.

  13. 13. Forging margin trajectory

    Mahesh Atal, Dhairya Investment Advisors

    Question. On Forging: in talks with defense — will margins improve or will you chase margin-based products? Is the 6-tonne hammer mainly about operating efficiency?

    Answer, Kapil Bhatia, Managing Director. Forging has lower margin than Coil/Air Spring — you're right. The market we're targeting will improve margin a little, and capacity utilization of 6-tonne will also boost profitability. Both levers in play.

    Follow-up. Is the 6-tonne hammer already commercialized — will H2 see contribution?

    Answer. Yes, H2 will reflect hammer contribution; orders starting from railways. Currently 10-20% capacity used on 6-tonne; 3-tonne and 2-tonne at 60-70%. By year-end expect good contribution.

  14. 14. FY26 capex plan

    Santosh, Financial Finesse

    Question. Any capex plan for the spring division?

    Answer, Kapil Bhatia, Managing Director. This year we are doing INR 15 crores of capex across all three divisions; H1 already done INR 8 crores; further INR 7-8 crores in next 6 months. Continuous process, funded from internal accruals — no loans.

  15. 15. Alstom / Siemens air spring progress

    Santosh, Financial Finesse

    Question. Earlier you mentioned discussions with Siemens and Alstom to supply air springs — any progress?

    Answer, Kapil Bhatia, Managing Director. Almost on the verge of completion. Quite hopeful that in another 1-1.5 months we will start getting orders from Alstom.

  16. 16. Metro product portfolio

    Piyush Bora, Stambha Systems

    Question. What kind of products are you looking at for metro coaches apart from air springs and FIBA? Only those two?

    Answer, Kapil Bhatia, Managing Director. Air spring, FIBA and Coil Spring — these three for metro. Very little forging or other types in metro coaches.

  17. 17. NSE listing plans

    Piyush Bora, Stambha Systems

    Question. Any restructuring of capital structure or plans on NSE listing?

    Answer, Kapil Bhatia, Managing Director. Already planning to go ahead with NSE listing; work started; targeting NSE listing in next financial year's first quarter.

  18. 18. Wagon industry dynamics vs guidance

    Ankur Kumar, Alpha Capital

    Question. Wagon OEMs (Titagarh, Jupiter) flagged wheelset issues now resolved, expecting H2 acceleration — but you guide H2 similar to H1 at INR 375 cr gross. Any difference?

    Answer, Kapil Bhatia, Managing Director. Confident on INR 375 cr gross. H1 gross was INR 187 crores. May cross INR 375 cr, may touch INR 400 cr, but I'm little conservative. Don't want to commit to INR 400-450.

    Follow-up. Out of total revenue, what % goes to wagon manufacturers vs directly to railways?

    Answer. Wagon manufacturing is around 10% to 15% of revenue.

  19. 19. FIBA IP & development

    Rakesh Roy, Omkara Capital

    Question. On FIBA — is the technology developed in-house or taken from outside?

    Answer, Kapil Bhatia, Managing Director. 100% in-house. Have professionals experienced in this line employed by us, plus consultants. Total indigenous development; we're also applying for a patent.

    Follow-up. So for each bogie, we need 4 devices?

    Answer. Each bogey needs 1 FIBA + indicator per air spring. 2 bogeys per coach = 2 FIBA devices + 4 indicators for 4 air springs per coach.

  20. 20. Air spring adjacency — auto/industrial

    Raja Panda, Unknown

    Question. Do air springs have applications in industrial and automotive usage? Any plans to address those?

    Answer, Kapil Bhatia, Managing Director. Already exploring. Quite a few manufacturers in automotive and Tata has its own subsidiary. Don't see that much margin or demand in domestic bus/truck air springs.

    Not answered directly.

  21. 21. Air spring penetration of IR fleet

    Prasanth Nagi, Unknown

    Question. By FY27, what % of trains in India do you think will be covered by air springs?

    Answer, Kapil Bhatia, Managing Director. New coaches from Rail Coach Factory Kapurthala, Modern Coach Factory Rae Bareli, ICF Chennai are 100% with air spring + coil spring. Old ~20,000 pre-air-spring coaches still on coil spring — may be upgraded later. Strong air-spring demand ahead.

  22. 22. Air/coil spring competitive landscape

    Nishant Joshi, Equisense Advisors

    Question. How do you see the competitive landscape evolving over the next year or so, and what could demand be in air spring and coil spring? Any new entrant that may hurt Frontier?

    Answer, Kapil Bhatia, Managing Director. Demand will be there for air and coil spring for next 4-7 years. ~15,000 ICF coaches to replace in 3 years, plus new coach demand. 6,000-7,000 manufactured annually; require 15,000+ to replace ICF. 1-2 players may come but their roadmap to regular orders is at least 2 years — RDSO approval then trial orders then 1-1.5 yr running. Set up a unit, wait 2 years.

  23. 23. Continental tie-up & FIBA moat

    Vivek Gautam, GS Investment

    Question. How sustainable is the Continental Germany tie-up edge near and mid-term? What's the opportunity size and differentiator for FIBA?

    Answer, Kapil Bhatia, Managing Director. Tie-up with Continental Germany gives edge through quality, innovation and air-spring know-how. 1-2 competitors importing from China face high failure. Supplied ~15,000 air springs in 2.5 years to IR with zero field failures. Knorr-Bremse imports FIBA today; we are the early indigenous developer and should get good market share.

  24. 24. Market share & bullet train

    Sandeep Kumar Patwa, Unknown

    Question. What's your market share in the air spring and coil spring segments catering to Indian Railways? Any bullet train opportunity?

    Answer, Kapil Bhatia, Managing Director. Coil spring ~40% of IR demand; air spring almost the same; forgings ~20-25% of IR demand. 1-2 coil spring manufacturers and 1-2 air spring manufacturers approved by railways; 7-8 players in forging. Bullet train is ~3 years away; have spoken to people involved but let's wait — being old railway supplier, will likely get opportunity.

    Partly answered.

  25. 25. Coil vs air spring — substitution risk

    Suman Bhunia, Unknown

    Question. In the near future, is there any chance the entire coil spring will be replaced by air springs?

    Answer, Kapil Bhatia, Managing Director. No. There are two suspensions — primary on axle uses coil spring, secondary carries load and uses air spring globally. Both technologies remain; design may evolve but coil remains coil, air remains air.

  26. 26. FIBA / defense layering & INR 1,000 cr aspiration

    Devesh Shrimali, DS Investment

    Question. For FY27 INR 500 cr gross — FIBA and possible defense supplies — are these on top of INR 500 cr or embedded in it? Can we hit INR 1,000 cr beyond FY27?

    Answer, Kapil Bhatia, Managing Director. Other than INR 500 cr. If full project, we may cross INR 500 crores — but INR 500 cr is from existing product lines. INR 500 cr → INR 560-575 cr → INR 600 cr in following years. To hit INR 1,000 cr requires a big jump and more product lines; discussing 1-2 new railway products internally.

    Partly answered.

  27. 27. Margin upside on higher run-rate

    Harshal Kalra, Symphoria LLP

    Question. If revenue run-rate hits INR 100 cr per quarter — is there scope for margins to expand further?

    Answer, Kapil Bhatia, Managing Director. Keeping fingers crossed to maintain margin at current levels. May move 1-2% up or down, but on the improving side and hopeful. Yes, yes, yes — looking like operating leverage.

    Follow-up. From a 5-year perspective, what revenue mix do you expect — railway still dominant? Will railway contribute ~60-70% even 5 years out?

    Answer. Definitely crossing INR 1,000 cr in 5 years. Adding more products to IR (priority customer). Already closing 1-2 more railway products with good margin. Definitely, railway will continue to be 60-70% — have met many railway officials; want to be cautious on capacity announcement.

  28. 28. Wheelset availability — sector update

    Utkarsh Somaiya, Eiko Quantum Solutions

    Question. Has the wheelset shortage issue in railways been resolved, or does it still persist?

    Answer, Kapil Bhatia, Managing Director. From Jupiter and Titagarh — they say the issue has been resolved and things will move smoothly over the next 6 months.

What was said

Topic by topic, in the order it was spoken

Q2 FY26 Financial Performance · Kapil Bhatia (MD)

  • Q2 FY26 revenue from operations INR 82.74 crores, +58.39% YoY.
  • EBITDA INR 22.07 crores, +106.53% YoY, more than doubled.
  • PAT INR 15.71 crores, +115.5% YoY; profitability aided by Air Spring pricing power and Coil Spring realization from railway demand.

H1 FY26 Financial Performance · Kapil Bhatia (MD)

  • H1 FY26 revenue from operations INR 158.08 crores, +53.49% YoY.
  • H1 EBITDA INR 42.5 crores, +107.92% YoY, more than doubled.
  • H1 PAT INR 30.45 crores, +113.37% YoY, described as a significant increase.

Order Book & Demand Visibility · Kapil Bhatia (MD)

  • Solid demand across all product lines; healthy order book provides substantial visibility for remainder of FY26.
  • Air Spring segment is the primary profitability driver; Coil Spring division remains bolstered by railway sector demand.
  • Order book expected to reach INR 200-250 crores by FY26 year-end with INR 60-80 crores of FY27 orders already received.

6-Tonne Hammer Project & Capacity Utilization · Kapil Bhatia (MD)

  • 6-tonne hammer project progressing well; capacity utilization currently 15-20%, expected to improve in forthcoming quarters.
  • Existing 3-tonne and 2-tonne hammers already running at 60-70% capacity utilization, providing operational reference.
  • Improved utilization expected to strengthen operational efficiency and reduce per-unit fixed costs.

FIBA Product (Failure Indication & Brake Application) · Kapil Bhatia (MD)

  • Innovative in-house product developed; auto-applies service brakes on air-spring failure and provides real-time operator alerts.
  • Currently 1-2 foreign players (including Knorr-Bremse) import the same product for Indian Railways.
  • RDSO approval targeted shortly; samples ready by December end; commercialization planned next financial year after 6-8 month trial; patent filing planned.

Forward Outlook & FY26-FY27 Targets · Kapil Bhatia (MD)

  • FY26 gross revenue target INR 375 crores reaffirmed; FY27 gross revenue target INR 500 crores.
  • EBITDA margin of ~27% expected to be sustained through FY26 with potential 1-2% variability.
  • 5-year aspiration: INR 1,000 crores revenue with continued railway dominance and selected new product additions.
  • Strategic view to align capex with growth ambitions and capacity expansion across target sectors.

In their words

Until today, we have not a single failure from the field. So, and which will give confidence to the railways also that if we buy Frontier product that is a quality product.
Kapil Bhatia (Managing Director, Frontier Springs)
Being an old supplier to Indian Railways and supplying so many components last almost 40 years.
Kapil Bhatia (Managing Director, Frontier Springs)
Definitely, we will cross INR 1,000 crores in the next 5 years. There is no doubt about it.
Kapil Bhatia (Managing Director, Frontier Springs)

To check next time

What management committed to on this call, or the dates they gave.

  • Q3 FY26 print and H2 progress against the ₹375 cr gross revenue guidance.
  • Commencement of Alstom air spring orders (within 1-1.5 months per management).
  • FIBA sample readiness and RDSO approval process (samples by December end).
  • 6-ton hammer capacity utilization ramp-up from current 10-20%.
  • Completion of remaining ₹7-8 cr of FY26 capex.
  • Update on NSE listing preparation ahead of targeted Q1 FY27.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

Frontier Springs's other calls

  • Q2 FY27Mon 16 Nov 2026Tone: Mixed
  • Q4 FY26Wed 3 Jun 2026Tone: Optimistic
  • Q4 FY25Thu 29 May 2025Tone: Confident
  • Q2 FY25Mon 18 Nov 2024Tone: Confident
  • Q4 FY24Thu 30 May 2024Tone: Confident