Jindal Supreme Q2 FY27 earnings call

Tue 17 Nov 202614:00 ISTJSIPL

In brief

Q2 FY27 revenue rose 36% to INR216.22 crores and PAT rose 132%; management guided FY27 revenue to INR850-900 crores.

Management's tone
Confident
What was said
Leaned positive
Guidance
First guidance issued
Analyst pushback
Low
Stock, next session
−2.80% (Nifty 50 +0.38%)
  • Q2 FY27 revenue rose 36% to INR216.22 crores from INR158.84 crores in Q2 FY26.
  • Q2 EBITDA rose 122% to INR16.94 crores as margin expanded to 7.8% from 4.8%; PAT rose 132% to INR9.91 crores.
  • FY27 guidance was INR850-900 crores of revenue and INR60-odd crores of EBITDA, with management expecting H2 to be much stronger than H1.
  • H1 utilization rose to 65.5% from 61.6%, value-added product mix reached 57.5%, and EBITDA per ton increased to INR5,800 from INR2,100.
  • IPO proceeds of INR99.89 crores funded INR71 crores of debt repayment, lowering debt-to-equity to 0.48; cash was INR38.47 crores.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY27

This quarterA year agoLast quarterMargin
Revenue₹216 cr——
EBITDA (excl. other income)₹16.9 cr——7.8%
Net profit₹9.9 cr——4.6%
EPS (₹)₹2.40——

From the company's filed results for the quarter ended 30 Sept 2026 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Value-added product share rose from 49% to 57% year on year (57.5% in H1), the stated main driver of margin improvement; EBITDA per ton rose from INR2,100 to INR5,800.
  • Capacity utilization improved to 65.5% in H1 FY27 from 61.6% in FY26, spreading fixed costs over higher volume.
  • GI tubular poles and black tubular poles were the key H1 growth and margin drivers; Q2 growth reflected newly added capacity despite monsoon and festival seasonality.
  • As a re-roller, steel-price changes are passed through with about a two-week lag; management increased inventory when steel prices rose.
  • Operating cash flow was negative because inventory was accumulated and receivables were INR42 crores versus INR33 crores last year; working capital reached 64 days.
  • Other current assets rose from INR15-odd crores to INR40-odd crores due supplier payments, input credit and IPO expense, which management said will be written off from reserves in H2. (accounting)

The numbers management led with

  • H1 FY27 capacity utilization: 65.5%, up from 61.6% in FY26
  • IPO proceeds and deleveraging: INR99.89 crore raised; INR71 crore used for debt repayment; debt-to-equity 0.48x versus 1.2x in FY26 and 2.1x in FY24
  • Raipur Phase 1 expansion: About INR150 crore capex for 150,000 tons per annum, with production targeted by March 2028
  • Raipur full-site expansion potential: About INR600 crore of phase-wise capex

Guidance

Guidance on this call

WhatForWhat management said
FY27 revenueFY27FY27 revenue will be about INR850 crores to INR900 crores.
Full-year EBITDAFY27Full-year FY27 EBITDA is expected at INR60-odd crores.
Overall capacity utilizationQ3 FY27-Q1 FY28Overall utilization was targeted at about 70% in Q3 FY27, 75% in Q4 FY27 and 80%-odd in Q1 FY28.
Value-added product mixH2 FY27The H2 FY27 value-added product mix is targeted at 70%-75-odd percent.
Long-term sustainable EBITDA margin—Management said a 7% to 8% EBITDA margin is very much doable over a much longer term.
Double-digit EBITDAFY28In the margin discussion, management targets double-digit EBITDA once utilization reaches 80%, mostly by Q1 FY28.
Net working capital daysH2 FY27Net working capital days are targeted at 45 to 50 days.
GI tubular poles capacity utilizationQ4 FY27GI tubular-pole utilization is targeted at 80% to 85% by Q4 FY27.
Raipur Phase 1 capex (Raipur greenfield)—Raipur Phase 1 capex was put at INR150-odd crores; land closure was targeted for Q4 FY27 and funding at about 50-50 from accruals and debt.
Raipur full potential capex (Raipur greenfield)—Full potential capex for the Raipur site was put at INR600-odd crores, phase wise.
Raipur Phase 1 capacity (Raipur greenfield)FY28Raipur Phase 1 is planned at 150,000 tons per annum, with production targeted by March 2028; Phase 2 would follow at about 50% utilization.
Capacity (Hisar)FY27Capacity is expected to be about 200,000 tons by year-end FY27.
Galvanizing line number 5FY28A fifth galvanizing line was planned at about 24,000 tons per annum; management stated both Q4 FY28 and Q2 FY28 as timing.
FY28 monthly outputFY28FY28 monthly output was expected at 15,000-16,000 tons.
Solar structures and nut-and-bolt production (Solar structures and nuts and bolts)Q4 FY27Solar structures and nut-and-bolt manufacturing were both slated to come up in Q4 FY27.

The business

By business

Black pipes

Black pipes are the mass category and are sold through dealers; management intends to raise sales per dealer as overall capacity utilization rises.

H1 FY27 capacity utilization 70%

Outlook: Dealer sales are expected to increase as overall utilization moves from about 65% toward 75-80% in H2 FY27.

Galvanized pipes

H1 utilization was 65%. An 18,000-ton-per-annum galvanizing line began commercial production in October and is dedicated to crash barriers.

H1 FY27 capacity utilization 65% · New galvanizing capacity 18,000 tons per annum · Total galvanizing capacity 63,000 tons

Outlook: The new line was to ramp over coming weeks, with enhanced volume from December; management gave Q4 FY28 and later Q2 FY28 for the fifth 24,000-ton line.

Metal beam crash barriers

H1 utilization was 56%. The added line took total crash-barrier capacity to 48,000 tons from 24,000 tons, and crash barriers are an H2 FY27 growth driver.

H1 FY27 capacity utilization 56% · Crash-barrier capacity 48,000 tons · Prior crash-barrier capacity 24,000 tons

Outlook: Management expects crash barriers, alongside poles, to drive H2 FY27 and sees enhanced volume from the dedicated galvanizing line from December.

GI tubular poles

Utilization reached 45% from about 15-odd percent at launch, and management called poles a key H1 growth and margin driver.

H1 FY27 capacity utilization 45% · Launch utilization about 15-odd percent · Targeted Q4 FY27 utilization 80% to 85%

Outlook: Management targeted 80-85% utilization by Q4 FY27 and said the level could be achieved over the next three years.

Nuts and bolts

A new category supplying crash barriers, poles and towers; management said bolts would be consumed in-house and also sold, with low tonnage and high value addition.

Outlook: Commercial production was targeted for Q4 FY27.

Solar structures

A new ground-mounted solar-structure category; management said capex was already completed and production was set for Q4 FY27.

Outlook: Commercial production was targeted for Q4 FY27.

Balance sheet, capex and funding

  • During FY27, the company raised INR99.89 crores through a fresh-issue IPO; INR71 crores of proceeds had been committed to borrowing repayment.
  • Debt-to-equity improved to 0.48 in H1 FY27 from 1.2x in FY26 and 2.1x in FY24; management later cited 0.4x.
  • Cash stood at INR38.47 crores as of 30 September 2026.
  • Net working capital rose to 64 days from 57 days in FY26; management targets 45-50 days.
  • Capex for solar structures was described as completed; the fifth galvanizing line was planned, with Q4 FY28 and Q2 FY28 both cited.
  • Raipur Phase 1 capex was put at INR150-odd crores, funded about 50-50 from internal accrual and debt; full-site capex potential was INR600-odd crores.

The industry, as management sees it

Management expects India's pipes and tubes industry to grow at 7-8% CAGR to about $24 billion by 2036, supported by Jal Jeevan Mission, Amrut, Smart Cities, freight corridors and bullet-train projects.

Risks management named

  • Working capital rose to 64 days from 57 on inventory and receivables; the 45-50 day target depends on inventory conversion.
  • Steel-price movements pass through with roughly a two-week lag, creating short-term margin timing exposure.
  • Raipur's schedule depends on closing 75-80 acres of land in Q4 FY27 and completing a new plant by March 2028.

Q&A

Analyst attention centered on the utilization ramp, working-capital and cash conversion, new-product execution and the proposed Raipur greenfield. Management provided specific targets and timelines for most operating questions, but was less precise on the product-mix bridge and the reconciliation between IPO-funded debt repayment and reported borrowings; there was little adversarial pushback.

Not answered directly

  • Q2 product-mix bridge behind the EBITDA-per-ton improvement
  • Full reconciliation of IPO debt repayment versus the decline in reported borrowings
  • Top-five state contribution to revenue

Asked for a number, answered without one

  • Future dealer count: Management said it would focus on extracting more sales per dealer rather than add dealers, without quantifying a future dealer count.
  • Other current assets composition: Management attributed it to supplier payments, input credit and IPO expense, without quantifying each component or the expected H2 reduction.
  • EBITDA margin under steel-price volatility: In that response, management said steel-price changes pass through with about a two-week lag and higher utilization and mix would improve EBITDA, without a forecast range.
  • Overall order book: Management said there is generally no order-book position and other products are ordered day to day; only poles had about one month of orders.

Every question, with its answer

  1. 1. GI tubular poles

    Arvind Jain, Motilal Oswal

    Question. What is the opportunity and ramp plan for GI tubular poles, and are there other new product categories management plans to enter?

    Answer, Management. GI tubular poles serve streetlights and telecom towers, particularly in hilly locations where optic-fiber infrastructure is difficult to deploy. Management said utilization had risen from about 15% at launch to 45% and expected 80-85% utilization within the next three years, including a target of 80-85% by Q4 FY27.

    Follow-up. Are there any other new product categories being considered?

    Answer. Management said ground-mounted solar structures would enter production by Q4 FY27. It had also introduced nuts and bolts for fixing poles, towers and crash barriers, describing these as the fifth and sixth product categories.

  2. 2. Capacity utilization and galvanizing ramp

    Devang Shah, Attitude Advisory

    Question. What is the timeline for moving overall utilization from below 70% to the stated 75-80% range, and what is the status of the new 18,000-ton galvanizing unit?

    Answer, Management. Management forecast utilization at about 70% in Q3 FY27, 75% in Q4 FY27 and 80%-odd in Q1 FY28, describing the latter as near the industry's optimum level. The new 18,000-ton galvanizing line had started production and was to ramp over the following weeks, supporting additional crash-barrier volumes from the next month.

    Follow-up. What is the status of the new 18,000-ton per annum galvanizing unit?

    Answer. The unit had already begun production and was being ramped. It was designed specifically for galvanized crash barriers, with enhanced volume expected from the next month.

  3. 3. Net working capital

    Abhijeet Porwal, Deven Choksey

    Question. What is management's target for net working capital, given that it increased to 64 days from 57 days?

    Answer, Management. Management targeted net working capital of 45-50 days. It said working capital increased because it had built inventory partly to benefit from higher steel prices and because receivables rose from INR33 crore to INR42 crore.

    Follow-up. Why was operating cash flow negative despite positive profit, and when will that reverse?

    Answer. Management attributed negative operating cash flow to the inventory build and the increase in receivables. It expected working-capital days to normalize as inventory converted, which would subsequently improve operating cash flow.

  4. 4. FY27 guidance, current assets and debt

    Raj Shah, Insight Advisors

    Question. Please provide FY27 revenue and EBITDA targets, explain the rise in other current assets and whether it will reverse in H2, reconcile EBITDA-per-ton gains with the product mix, and reconcile INR71 crore of IPO-funded debt repayment with the smaller decline in reported borrowings.

    Answer, Management. FY27 revenue is targeted at INR850-900 crore and EBITDA at about INR60-odd crore. Management said other current assets rose mainly due to raw-material payments, input credit and IPO-related expense; the IPO expense should be written off from reserves, reducing the balance in H2.

    Follow-up. How does the product mix explain the EBITDA-per-ton increase, and how should the borrowing decline reconcile with the stated IPO-funded repayment?

    Answer. Management reaffirmed that value-added mix and utilization had improved, but asked the analyst to identify the relevant slide because the product-mix bridge was unclear. It attributed the gap between INR71 crore of stated IPO-funded debt repayment and the roughly INR30 crore decline in reported borrowings to short-term borrowing used to stock inventory, without providing a full numerical reconciliation.

    Not answered directly.

  5. 5. Raipur greenfield expansion

    Anubhav Podar, Individual Investor

    Question. How will the IPO proceeds and stronger balance sheet support expansion, particularly a greenfield plant? What products, capex, funding and production timeline are planned in Chhattisgarh?

    Answer, Management. Management said roughly INR72 crore of IPO proceeds had repaid debt and that land acquisition in Chhattisgarh was in advanced due diligence. The Raipur plant would make larger sizes and new products; Phase 1 capex is about INR150 crore for 150,000 tons per annum, with total site potential near INR600 crore. Funding will come from internal accruals and some debt, with production targeted by March 2028.

    Follow-up. Does the 171,000-ton capacity include the new galvanizing line, and do higher utilization and new products support the INR850-900 crore revenue target? What brownfield additions remain?

    Answer. Management reaffirmed INR850-900 crore FY27 revenue, saying guidance reflected a worst-case outcome and that H2 should be stronger because H1 was seasonally slower. Hisar additions include a fifth 24,000-ton galvanizing line and nuts-and-bolts manufacturing.

  6. 6. Steel-price pass-through and margins

    Astha, Neomile Asset Management

    Question. How should EBITDA margins be expected to behave when raw-material costs are a significant portion of revenue and steel prices fluctuate?

    Answer, Management. As a re-roller, management said steel-price increases are generally passed through to customers, although there is a lag of about two weeks; prices are also adjusted when steel costs fall. Higher utilization should absorb fixed costs, while improved mix from crash barriers, poles and new categories should support EBITDA per ton.

  7. 7. Revenue model and family ownership

    Nirmal Jain, Jain Investments

    Question. What is the company's relationship to the Jindal family, how does the 20% dealer revenue mix differ from the remaining 80%, which states are most important, and how will the Raipur expansion be funded? Will there be equity dilution, which products should drive H2, what is the H1:H2 split, and what margin is sustainable?

    Answer, Management. Management confirmed the company is from the same Jindal family. Dealers contribute about 20% of revenue; the remaining 80% is sold directly to EPC firms and contractors, including NHAI, BSNL, ITI, Delhi Buildcon and NCC. Management described direct-sales margins as materially better than dealer margins.

    Follow-up. Which states are the largest contributors, how will Raipur be funded, is there equity dilution, which products drive H2, and what is the sustainable margin?

    Answer. The Hisar plant serves northern states, while crash barriers and GI pipes also reach Maharashtra, Gujarat and Madhya Pradesh; Raipur could serve 11-12 states with lower outbound freight. Phase 1 capex is about INR150 crore, funded roughly 50:50 from accruals and debt, with no near-term equity-dilution plan. GI and black tubular poles drove H1, while poles and crash barriers were expected to lead H2; sales were expected to split 40:60 between H1 and H2. Management viewed 7-8% EBITDA margins as sustainable and targeted double digits once utilization reached 80% around Q1 FY28.

  8. 8. Capacity additions and FY28 output

    Abhijit Periwal, APSEC

    Question. What will total capacity be by FY27-end, what additional Hisar capacity is planned for FY28, and is nuts-and-bolts included in the 200,000-ton estimate? What output and greenfield capacity are expected?

    Answer, Management. Management expected total capacity of about 200,000 tons by FY27-end. The fifth galvanizing line adds 24,000 tons per annum and was expected by Q2 FY28, while nuts and bolts were slated for Q4 FY27 and excluded from tonnage because they carry high value with low weight. FY27 utilization was expected to be around 70%.

    Follow-up. What monthly and annual output is expected in FY28, and what capacity would the INR150 crore Raipur Phase 1 provide?

    Answer. Management indicated monthly output of 15,000-16,000 tons in FY28, equivalent to about 170,000-180,000 tons annually. The INR150 crore Raipur Phase 1 would support about 150,000 tons per annum, and the full planned site could approach four times Hisar's current scale.

  9. 9. Raipur commercialization and product mix

    Darshan Jain, Individual Investor

    Question. When is the 150,000-ton Raipur project expected to be commercialized, when will subsequent capacity phases begin, and how much of its product range will differ from Hisar?

    Answer, Management. Management reiterated a March 2028 production target. Phase 2 would begin once the greenfield plant reached roughly 50% utilization. About half of the planned range would match Hisar, while the remainder would comprise different pipe sizes and thicknesses.

    Follow-up. When will later phases be added, and will the product range at Raipur differ materially from Hisar?

    Answer. Subsequent capacity would be added after approximately 50% utilization of Phase 1. Around 50% of products would overlap with Hisar, and approximately 50% would be different sizes and thicknesses.

  10. 10. Order book and customer mix

    Raj Shah, Insight Advisors

    Question. Is there a trackable order book behind the roughly 80% of revenue that is not sold through dealers, and who are the typical crash-barrier customers?

    Answer, Management. Management clarified that the 80% non-dealer mix comprised about 30% EPC customers, 30% crash barriers and the balance in pipes. It said there was generally no formal order book because the company did not take large government tenders, with most sales occurring day to day; poles had an order book of about one month. Crash-barrier customers were NHAI contractors placing typically 50-ton, 100-ton or 150-ton orders, with a mix of repeat and new buyers.

  11. 11. Receivables and galvanizing commercialization

    Nirmal Jain, Jain Investments

    Question. What are the typical credit and receivable terms for contractor sales, and has the additional galvanizing capacity achieved commercial production?

    Answer, Management. Crash barriers were sold on 100% advance payment, while pole sales to EPC companies were backed by bank letters of credit. Pipe terms varied between advances and dealer credit, and debtor days were typically about 12-13 days, with most credit extended to dealers. The galvanizing unit reached commercial production at the end of October, with additional volume expected by December.

What was said

Topic by topic, in the order it was spoken

Company Overview and Distribution Footprint · Abhishek Jindal (Chairman & Managing Director)

  • Jindal Supreme traces its operating history to 1974, when it was known as Janak Steel Tubes Limited.
  • The company operates a 16-acre integrated Hisar facility with about 171,000 tons per annum of installed capacity.
  • Its four principal categories are black pipes, galvanized pipes, metal beam crash barriers and GI tubular poles.
  • The company serves more than eight end-user industries across 20 states through 53 dealers and direct institutional sales.
  • No single customer contributes more than 5% of revenue, while dealer contribution has increased to about 20%.

H1 Utilization and Product Mix · Abhishek Jindal (Chairman & Managing Director)

  • H1 FY27 capacity utilization improved to 65.5% from 61.6% in FY26.
  • Product utilization was approximately 70% for black pipes, 65% for GI pipes, 56% for crash barriers and 45% for tubular poles.
  • The tubular-pole line, introduced in April FY25, was ramping rapidly from a low initial base.
  • Value-added products increased from 49% to 57% year on year and management identified mix as the principal margin driver.
  • EBITDA per ton increased from INR2,100 to INR5,800 as higher-value products and fixed-cost absorption improved profitability.

Capacity Expansion and New Products · Abhishek Jindal (Chairman & Managing Director)

  • A new metal beam crash-barrier line reached commercial operation, doubling that category's capacity from 24,000 to 48,000 tons.
  • An additional 18,000-ton galvanizing line became operational, taking total galvanizing capacity to 63,000 tons per annum.
  • Management is adding a fifth galvanizing line with about 24,000 tons per annum of rated capacity.
  • The fifth galvanizing line is expected to become operational in Q4 FY28.
  • The company also began introducing nuts and bolts and ground-mounted solar structures to broaden its product portfolio.

Financial Performance and Margin Drivers · Ashish Chugh (Chief Financial Officer)

  • Q2 FY27 revenue from operations increased 36% year on year to INR216.22 crore, while EBITDA rose 122% to INR16.94 crore.
  • Q2 EBITDA margin expanded to 7.8% from 4.8%, and PAT margin increased to 4.6% from 2.7%.
  • H1 FY27 revenue grew 23% to INR407.16 crore, EBITDA rose 64% to INR30.70 crore and PAT increased 72% to INR18.19 crore.
  • Management described H1 FY27 as the company's strongest first-half performance to date.
  • Margin expansion was attributed to a 57.5% value-added mix, 65.46% utilization and greater absorption of fixed costs over higher volumes.

IPO Proceeds and Balance-Sheet Reset · Ashish Chugh (Chief Financial Officer)

  • The company raised INR99.89 crore through the FY27 IPO fresh issue.
  • INR71 crore of IPO proceeds had been committed to repayment of borrowings.
  • Debt-to-equity improved to 0.48x from 1.2x in FY26 and 2.1x in FY24.
  • Cash stood at INR38.47 crore as of September 30, 2026.
  • Net working capital increased to 64 days from 57 days, limiting the immediate cash-conversion benefit from stronger reported profit.

H2 FY27 Priorities and Demand Outlook · Abhishek Jindal (Chairman & Managing Director)

  • The first H2 priority was to raise overall utilization from about 65% toward 75-80%.
  • Management also targeted a value-added product mix of approximately 70-75% from about 65%.
  • Working-capital days were expected to decline in H2 as inventory converted into sales.
  • The deleveraged balance sheet was expected to provide headroom for growth investment without excessive balance-sheet stress.
  • Demand support was linked to Jal Jeevan Mission, Amrut, Smart Cities, freight corridors and bullet-train projects.
  • Management expected the Indian pipes and tubes industry to grow at 7-8% CAGR to about $24 billion by 2036.

In their words

The shift in the product mix is the main driver for our margin improvement.
Abhishek Jindal (Chairman & Managing Director)
We are now a significantly deleveraged company with a strong balance sheet to fund our next phase of growth.
Ashish Chugh (Chief Financial Officer)
We remain confident of maintaining our growth momentum in the H2 of financial year '27.
Abhishek Jindal (Chairman & Managing Director)

To check next time

What management committed to on this call, or the dates they gave.

  • Check Q3 FY27 overall utilization against about 70% and progress toward 75% in Q4 FY27.
  • Check GI tubular-pole utilization against the 80-85% target for Q4 FY27.
  • Check H2 FY27 value-added mix against 70-75%, noting H1 was 57.5% while the outlook called current mix about 65-odd%.
  • Check FY27 revenue and EBITDA against INR850-900 crores and INR60-odd crores.
  • Check net working capital days moving from 64 toward 45-50 and whether operating cash flow normalizes.
  • Track the new galvanizing line's volume ramp, Q4 FY27 solar and nut-and-bolt output, and Raipur land closure; Phase 1 production is targeted for March 2028.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Tue 17 Nov 2026₹167.53−2.80%+0.38%

From the close of Mon 16 Nov 2026, ₹172.36: the last close before the call, which began at 14:00 IST. Adjusted daily closes; the move includes everything else that happened in those sessions.