K.P. Energy Q1 FY26 earnings call
In brief
K.P. Energy Q1 revenue Rs. 220.6 cr (+63% YoY), EBITDA Rs. 49.6 cr; 2.22 GW order book; new orders expected by September.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Low
- Stock, next session
- −0.80% (Nifty 50 +0.09%)
- Q1 consolidated revenue at Rs. 220.6 cr was the highest-ever Q1, up 63% YoY from Rs. 135.2 cr; PAT grew 40% to Rs. 25.4 cr with EPS at Rs. 3.81 (+39%).
- EBITDA at Rs. 49.6 cr (+63% YoY), the highest-ever Q1 on operational efficiencies; consolidated EBITDA margin at ~22%.
- Order book at 2.22 GW (~Rs. 3,000+ cr value) all EPC; expects new order inflow by September 2025 per CMD's interview direction.
- IPP portfolio at 48.5 MW (37 MW wind + 11.5 MW solar), fully commissioned in phases; GUVNL PPA tariff at Rs. 2.43/unit.
- Q1 revenue mix: EPC 95%, IPP 5%, O&M 1%; gross margins ~15-18% on EPC and ~65-75% on IPP power sale.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q1 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹219 cr | +72.6% | −45.3% | |
| EBITDA (excl. other income) | ₹48.5 cr | +116.5% | −31.1% | 22.1% (17.6% a year ago) |
| Net profit | ₹25.4 cr | +39.6% | −44.5% | 11.6% (14.3% a year ago) |
| EPS (₹) | ₹3.81 | +39.6% | −44.5% |
From the company's filed results for the quarter ended 30 Jun 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- EBITDA YoY growth: said Q1 FY26 Rs. 49.6 cr, +63% YoY; Q1 FY25 base Rs. 30.4 cr; filed Rs. 48.50 cr, +116.5% YoY (excl. other income). Filed excludes other income; management's prior-quarter base is ~Rs. 8 cr higher than filed. Different scope/definition.
What moved the numbers, as management explained it
- Earlier monsoon arrival (~1 month) enabled faster contract execution in Q1 FY26, on top of well-planned activity mix.
- Revenue mix held at 95% EPC / 5% IPP / 1% O&M, which caps consolidated margin at ~22% since EPC gross margins are only ~15-18% vs IPP at ~65-75%.
- Interest costs rose ~93% YoY and depreciation increased after the 28.7 MW wind IPP was capitalised in Q4 FY25; this gap is why PAT grew only 40% vs EBITDA growth of 63%. (accounting)
- Higher capacity utilisation on EPC execution and steady revenue growth drove the 63% YoY revenue increase.
- Other income dropped to Rs. 1.12 cr vs ~Rs. 8 cr one-off insurance claim in Q1 FY25; this base effect partially muted PAT growth in the YoY comparison. (one-off)
The numbers management led with
- Q1 FY26 consolidated revenue: Rs. 220.6 crore (+63% YoY); highest-ever Q1
- Q1 FY26 consolidated EBITDA: Rs. 49.6 crore (+63% YoY); highest-ever Q1
- Order book: 2.2 GW unexecuted (~Rs. 3,000+ crore in value); 1.3 GW from KPI Green, balance from other entities
- Bid pipeline: Approximately 3 GW under active discussion
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Order inflow timing | Q2 FY26 | Expected new order inflow by Q2 FY26 per CMD's interview direction. |
| IPP portfolio addition | — | About 20 MW of IPP addition targeted in coming months; full 100 MW IPP target reached via phased rollout. |
| CPP project completion (EPC) | FY26 | NTPC + Indian Oil CPP project targeted to complete within FY26 with ~Rs. 15 cr value addition. |
| Other income (quarterly normalised) | — | Normalised other income of Rs. 1-1.1 cr per quarter going forward (vs ~Rs. 8 cr one-off in Q1 FY25). |
| EBITDA margin | — | EBITDA margin to be maintained 'more or less the same' with upward movement as IPP share rises. |
| Group-level capacity target | — | Group-level target of 10 GW renewable capacity (vs 5.9 GW current). |
| O&M revenue share | — | O&M revenue expected to grow from current 1% as free O&M periods (1-2 years) on EPC contracts kick in. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Consolidated revenue growth | FY26 | 60–70% (on the Q4 FY25 call) | 59.5%, below the range |
| Consolidated EBITDA margin | FY26 | 19% (on the Q4 FY25 call) | 21.4%, above the figure guided |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
EPC (Balance of Plant)
Main revenue contributor at 95% of Q1 revenue. Highest-ever Q1 execution backed by 2.22 GW order book (~Rs. 3,000+ cr value). Gross margins ~15-18%.
Revenue share 95% of Q1 consolidated · Order book 2.22 GW (~Rs. 3,000+ cr) · Gross margin range 15-18%
Outlook: New order inflow expected by September 2025; NTPC + Indian Oil CPP project (462-464 MW) targeted to complete within FY26.
Power Sale (IPP)
5% of Q1 revenue. 48.5 MW portfolio (37 MW wind + 11.5 MW solar), fully commissioned in phases. PLF: wind 35-37%, solar 20-23%.
Revenue share 5% of Q1 consolidated · Portfolio 48.5 MW · Gross margin range 65-75% · Solar realisation Rs. 5-5.5/unit (net) · Wind realisation Rs. 4.5-5/unit (net, ex-GUVNL) · GUVNL tariff Rs. 2.43/unit
Outlook: Next ~20 MW IPP addition targeted in coming months; full 100 MW IPP target reached via phased rollout funded by internal accruals.
O&M
1% of Q1 revenue. Portfolio exceeds 595 MW; covers preventive care, data-driven diagnostics, efficiency enhancements for BOP components.
Revenue share 1% of Q1 consolidated · O&M portfolio >595 MW
Outlook: Expected to grow from current 1% as free O&M periods (1-2 years) on existing EPC contracts expire.
Balance sheet, capex and funding
- Debt has been rising; main reason per management is the 30 MW IPP project (commissioned). No absolute debt number disclosed on the call.
- Plan next 50 MW IPP addition via internal accruals to avoid loading the balance sheet further.
- Fixed assets jumped from ~Rs. 170 cr to Rs. 252 cr entirely due to 28.7 MW wind plant capitalisation in Q4 FY25.
- Interest costs up ~93% YoY; depreciation also enhanced due to capitalisation of the IPP asset in prior quarter.
- Other income normalised at Rs. 1-1.1 cr per quarter going forward (vs ~Rs. 8 cr insurance-claim one-off in Q1 FY25).
The industry, as management sees it
Management views India's renewable energy demand as 'tremendously high' — the country needs ~40 GW per year to meet the 500 GW 2030 non-fossil target (currently at ~190 GW). Land and power evacuation (PE) creation is the supply-side bottleneck; BOP execution expertise is scarce, which favours integrated EPC players like KPEL. Offshore wind is at a nascent stage with proposed 500 MW each for Gujarat and Tamil Nadu; commercial viability requires Rs. 10-15/unit tariff with VGF and is likely 5+ years away.
Risks management named
- Wind EPC margins structurally lower (~18-20%) than solar-dominant peers due to longer execution cycles and resource concentration
- PAT growth (40%) lagging EBITDA growth (63%) due to higher interest and depreciation from recently capitalised IPP asset
- Seasonality risk from extended monsoon impacting Q1 execution pace
- Capital intensity of IPP expansion could pressure balance sheet if not phased carefully
Q&A
Q&A was friendly with mostly individual investors and a handful of boutique brokers; pushback intensity was low. The CFO Shabana Bajari carried the call and gave direct, number-rich answers on order book mix, segment margins, IPP portfolio and execution timelines. Two threads drew the most scrutiny: (1) why KPEL's margin profile (~18-20%) lags solar-heavy group peer KPI Green (~32%) — management attributed this to wind's longer execution cycle and resource concentration, signalling gradual improvement as IPP scales; (2) the pace of order book execution versus the September 2024 commitment — management defended the gap as a function of milestone-based value recognition versus full commissioning. No major pushback, no uncomfortable topics.
Not answered directly
- Standalone 10 GW target for KPEL vs group — management reframed as a group-level aspiration without committing to a separate company-level number
Asked for a number, answered without one
- FY26 revenue/EBITDA guidance (specific number): Said 'very confident that we will be crossing all the committed thresholds' without giving a specific FY26 revenue or EBITDA number.
- Closest competitor name: Deflected with broad names (Sterling & Wilson for solar, Suzlon for wind) but did not name a single closest wind-EPC competitor.
- Investment vs revenue from IPP portfolio: Did not give a specific investment figure; only mentioned 48.5 MW capacity, PLF ranges and per-unit realisation ranges.
- Bid pipeline in ₹ value terms: Gave only ~3 GW bid pipeline; no ₹ value provided.
- Peak unit output at PLF 35-40%: Gave PLF ranges (wind 35-37%, solar 20-23%) but did not tie to specific unit output.
Every question, with its answer
1. FY26 guidance and IPP status
Sudhir Bheda, Bheda Family Office
Question. Can you meet the FY26 guidance given the strong Q1? And was the early monsoon a reason for the Rs. 220 cr revenue? Also, is the entire 48 MW IPP energised?
Answer, Shabana Bajari, CFO, K.P. Energy Limited. On guidance, with Q1 turnover of Rs. 221 cr (up 63%) and a 2.2 GW order book (~Rs. 3,000+ cr in value), we are definitely confident we will cross all committed thresholds. On monsoon — yes, it arrived about a month earlier and is one factor, but more importantly execution activities are well planned. And yes, the full 48.5 MW IPP is commissioned and up and running.
2. Order book scope, timeline and segment margins
Shubhankar Gupta, Equitree Capital
Question. Is the 2.2 GW order book (~Rs. 3,000 cr) at KPEL level or group level? What is the execution timeline? Also, can you split the Rs. 220 cr revenue between IPP and O&M, and what are the segment margins?
Answer, Shabana Bajari, CFO, K.P. Energy Limited. The 2.2 GW is for KP Energy only. Project timelines range from completing by September '25 to beyond the current FY, with an average cycle of 12-24 months. The entire 2.2 GW is EPC contracts — no IPP element. Revenue mix is 95% EPC, 5% power sale (IPP), 1% O&M this quarter. Gross margins: EPC 15-18%, power sale (IPP) 65-75%. O&M share will rise as free O&M periods (1-2 years) attached to EPC contracts expire.
3. IPP rationale, future PPA strategy and CTU connectivity
Ashish Khurana, ANK Capitals
Question. Why did you take the 30 MW GUVNL IPP given tight return on capital ratios? Any tax/depreciation benefits? For the next 50 MW, will you go for government or private PPAs? And how does CTU connectivity enable using Gujarat land banks for projects in other states?
Answer, Shabana Bajari (with Dr. Alok Das), CFO, K.P. Energy Limited (and Group CEO, KP Group). For the 30 MW IPP, the prime reason is to have our own asset, plus higher EBITDA margins, plus depreciation benefits from a tax perspective to save tax on total profits. Both government and private PPAs are open; government PPAs offer lower tariff but longevity and quick payment cycles, private PPAs offer marginally higher tariff — a balanced call. On CTU: Dr. Das explained that with CTU connectivity through PGCIL and resource availability, IPP investors can build wind-dominant (Karnataka, Gujarat, Tamil Nadu, AP) and solar-dominant (Rajasthan, Gujarat, MP) projects and evacuate power to consumption centres like Odisha. Round-the-clock operations drive hybrid demand.
4. IPP PLF, realisation, offshore wind and margin classification
Rushil Selarka, PINC Wealth Management
Question. What is the peak unit generation at 48.5 MW at PLF of 35-40% and average realisation per unit? Has anything been additionally energised after the 48.5 MW? What is the offshore wind opportunity and KPEL's positioning? Are you looking at further wind IPP expansion? And to clarify, are the 15-18% (EPC) and 65-75% (IPP) gross or EBITDA margins?
Answer, Shabana Bajari (with Dr. Alok Das), CFO, K.P. Energy Limited (and Group CEO, KP Group). 48.5 MW is fully operational — 37 MW wind (28.7 MW was last to be energised in Q4 FY25) and 11.5 MW solar. Solar PLF 20-23% (fixed tilt or tracker), wind PLF 35-37%. Average realisation on gross basis: solar Rs. 7-8/unit, wind Rs. 6.5-7/unit; net basis: solar Rs. 5-5.5/unit, wind Rs. 4.5-5/unit (excluding GUVNL). GUVNL effective rate is better than headline Rs. 2.43 because GUVNL bears transmission charges. On offshore: very nascent — 500 MW each proposed for Gujarat and Tamil Nadu; commercial viability needs Rs. 10-15/unit minimum tariff with VGF; likely 5+ years away; KP is in planning mode. On further wind IPP expansion: yes, we are in resource creation mode across 3-4 states and want to participate. The 15-18% and 65-75% are gross margins; EBITDA margin is similar at roughly 1-2% variation since there is little between EBITDA and gross in EPC and IPP cost structures.
5. NTPC project, margin gap vs KPI Green, big orders and group target
Akhilesh Kumar, Individual Investor
Question. How is the 462 MW NTPC/INGEL CPP project progressing and is it near completion? Why does KPEL's margin (~18-20%) lag solar-heavy group peer KPI Green (~32%) despite fewer wind EPC competitors? Will we ever catch up on margins? Any hint on the big orders the CMD mentioned? Why is there no separate 10 GW target for KP Energy alone?
Answer, Shabana Bajari (with Dr. Alok Das), CFO, K.P. Energy Limited (and Group CEO, KP Group). NTPC + Indian Oil (INGEL) project is on track; there has been a value addition of ~Rs. 15 crores due to change in turbine type; expected to be completed in this financial year. On margin gap with KPI Green — KPI has 12-13% IPP vs KPEL's 5%; wind execution involves far more activities (permissions, liasoning, site mobilisation), making it longer; solar can be executed anywhere pan India whereas wind must be at resource locations, leading to concentrated competition and market-price-driven margins. IPP scaling is capital intensive and we need to balance the balance sheet; over time we envisage upward margin movement as IPP grows and O&M rises. Big orders expected in September (CMD-confirmed); orders from the CMD's interview are on track. On the 10 GW target — group level currently at 5.9 GW capacity; the 10 GW is a group-level vision; KPEL does not have a separate standalone target.
Partly answered.
6. New order pipeline, demand outlook and other income normalisation
Deepak Jindal, Individual Investor
Question. Any colour on the new orders expected by September end — what defines a 'big order' for KPEL? Is wind demand still very high vs limited supply? Why was Q4 FY25 other income ~Rs. 8 cr vs Rs. 1 cr this quarter and what's the sustainable quarterly run rate?
Answer, Shabana Bajari (with Dr. Alok Das), CFO, K.P. Energy Limited (and Group CEO, KP Group). Multiple discussions ongoing — mostly on wind hybridisation; orders should be expected by September end as the CMD indicated. On demand-supply: demand is 'tremendously high' — India needs 40 GW per year; creation of land and power evacuation (PE) is the crux; KPEL is creating resources aggressively. On other income: Q4 FY25 had a small insurance claim that materialised; sustainable run rate is ~Rs. 1-1.1 crore per quarter (~Rs. 4-5 crore annualised).
7. Order execution pace, IPP funding and KPI Green execution status
Sunil Kumar, Individual Investor
Question. Going back to September 2024 — order book was 2 GW at Rs. 3,350 cr with 15-18 month execution target. You have executed ~Rs. 825 cr in 9 months; can you deliver the remaining Rs. 2,500 cr in the next 9 months (by May 2026)? What is the timeline for the next 50 MW IPP and will it be funded via internal accruals, debt or equity? How much of the KPI Green order has been executed?
Answer, Shabana Bajari, CFO, K.P. Energy Limited. Contractual timelines extend up to October '26 but internal aspiration is to complete by March-May '26 — we want to set goals high, not low. Order book value and gigawatt terms cannot be directly matched — energisation/install is only counted when fully complete per statutory requirements while value recognition happens milestone by milestone. On KPI execution: 92 MW DC installed — 75.2 MW solar + 16.95 MW wind — plus 23.1 MW completed for Aditya Birla in the last two quarters. Next 20 MW IPP targeted in coming months (not this quarter), funded from internal accruals.
8. Order book split by client
Gopinath Chenna, CDK Global
Question. Within the 2.2 GW unexecuted order book, what is the split between KPI Green and other entities? Any new orders received in this quarter or last quarter?
Answer, Shabana Bajari, CFO, K.P. Energy Limited. Approximately 1.3 GW is from KPI Green and the balance is from other entities. As already announced by the CMD, an order inflow is expected by Q2 FY26 — the company is working in that direction.
9. Bid pipeline, competitive landscape and PAT margin trajectory
Shikha Mehta, Time & Tide Advisors
Question. What is the current bid pipeline in value terms? Who is KPEL's closest competitor? Would PAT margin move in line with EBITDA margin as IPP scales, given depreciation benefits?
Answer, Shabana Bajari (with Dr. Alok Das and Salim Yahoo), CFO, K.P. Energy Limited (and Group CEO, KP Group and CFO, KPI Green). Bid pipeline is roughly 3 GW; gestation period from bid to order is long due to capital intensity on the client side. On competitors: there are many, but few offer hybrid (solar + wind) capability like KPEL; Salim Yahoo noted Sterling & Wilson is solar-only and Suzlon is wind-only; KPEL stands out as a BoP execution expert with end-to-end capability (WRA, conceptualisation, evacuation) under one EPC contractor. On PAT margins: more or less consistent with EBITDA — EPC contracts have long timelines and the company is optimising execution; absolute volume growth should drive better margins even at the PAT level.
Partly answered.
10. Debt levels, fixed asset build and EBITDA margin sustainability
Darshil Pandya, Finterest Capital
Question. With debt rising alongside revenue scaling, how are you keeping debt in check? Is the Rs. 252 cr fixed asset jump entirely from IPP? Can EBITDA margin be sustained at 21-22% for the rest of the year?
Answer, Shabana Bajari, CFO, K.P. Energy Limited. Long-term debt primarily arose from the IPP project; the next 50 MW IPP will be phased to avoid overloading the balance sheet. The Rs. 252 cr fixed asset jump is entirely from the recent 28.7 MW wind IPP energisation in the last quarter. EBITDA margin guidance maintained at the 21-22% level — the company is consistently focused on cost control and operating efficiencies.
11. PAT growth lag, seasonality and depreciation trajectory
Akhilesh Kumar, Individual Investor
Question. Why did PAT grow only 40% vs EBITDA 63% and revenue 73% — driven by 93% higher interest and depreciation? Will this trend continue? Any seasonality from the extended monsoon this quarter? Will depreciation remain flat or step up with more IPP capitalisation?
Answer, Shabana Bajari, CFO, K.P. Energy Limited. Yes, higher turnover implies higher tax; the asset capitalised in the last quarter of the previous year has lifted the depreciation run rate; the trend will broadly continue. On seasonality — monsoon does impact execution but contracts have different milestones and KPEL plans to balance revenue booking across the year; depreciation will see some addition in coming quarters as the next IPP phase is added (50 MW yet to be executed).
What was said
Topic by topic, in the order it was spoken
Company Overview & Integrated Wind EPC Positioning · Siddharth Thakur (CMD Office, KP Group)
- Welcome remarks — first investor call of FY26; described KP Energy as one of the very few integrated end-to-end wind EPC players in India.
- Highlighted vertical integration across the wind project lifecycle: site identification, logistics, construction, grid integration and final commissioning.
- Emphasised group-level synergy advantage — quality, cost efficiency and accelerated timelines from in-house capabilities across KP Group entities.
- India achieved the 50% non-fossil generation milestone ahead of schedule; KP Energy positioned as a prominent player in driving renewable expansion.
Leadership Welcome & Strategic Vision · Affan Faruk Patel (Whole-Time Director, KP Energy Limited)
- Proudly reported a strong start to FY26 with robust financial performance and continued operational excellence.
- Acknowledged CMD Dr. Faruk Patel's visionary leadership and forward-thinking approach to sustainability and inclusive growth.
- Reaffirmed commitment to long-term value creation for all stakeholders as India accelerates its renewable energy transition.
- Set up the financials and industry overview handoff to CFO and Group CEO for detailed discussion.
Industry Context & India Renewable Targets · Shabana Bajari (CFO, KP Energy Limited)
- India has installed over 190 GW of renewable energy capacity cumulatively; solar at 81 GW and wind at 47 GW.
- The 2030 target of 500 GW from non-fossil fuels has been achieved at nearly 38%; both solar and wind are at roughly one-third of their sub-targets.
- India added over 15 GW of renewable capacity in the last fiscal; momentum is accelerating with policy support and green corridor push.
- Positioned KP Energy as a 'catalyst' transforming 'potential into power and projects into progress'.
Q1 FY26 Financial Highlights · Shabana Bajari (CFO, KP Energy Limited)
- Consolidated revenue at Rs. 220.6 crores vs Rs. 135.2 crores in Q1 FY25 — a 63% increase, the highest-ever Q1 revenue for KP Energy.
- Consolidated EBITDA at Rs. 49.6 crores vs Rs. 30.4 crores in Q1 FY25 — a 63% YoY increase, also the highest-ever Q1 number.
- PBT at Rs. 34.8 crores (+50%); PAT at Rs. 25.4 crores (+40%); basic EPS at Rs. 3.81 vs Rs. 2.73 (+39%).
- Quarterly unit generation rose to 2.65 crores from 0.98 crores in Q1 FY25 on higher IPP capacity utilisation.
Order Book, IPP & O&M Portfolio Snapshot · Shabana Bajari (CFO, KP Energy Limited)
- Current order book stands at about 2.2 GW, inching towards the ambitious 10 GW group-level target.
- Consolidated IPP portfolio now at approximately 48.5 MW (combination of wind and solar), fully operational.
- O&M portfolio now exceeds 595 MW; supports end-to-end preventive care, data-driven diagnostics and BoP efficiency enhancements.
- Acknowledged investors, partners and stakeholders for continued trust and support; opened the floor for Q&A.
In their words
I am definitely very confident that we will be crossing all the committed thresholds.
KP Energy has demonstrated a strong concurrence of results both revenue accretive and EBITDA accretive and we will ensure we will continue to do so.
BOP expertize is very scarce today in India. So, whereby KP is coming, we have got expertise for the balance of plan development and execution of the project. In that consideration and parameters we stand very very remarkable position in India.
To check next time
What management committed to on this call, or the dates they gave.
- New order inflow announcement expected by September 2025 (Q2 FY26).
- Execution progress on ~20 MW IPP addition targeted in coming months.
- NTPC + Indian Oil CPP project (462-464 MW) completion timeline (targeted within FY26).
- Movement in O&M revenue share from current 1% as free O&M periods on existing EPC contracts expire.
- Q2 FY26 execution pace through monsoon and its effect on revenue mix.
- Order book execution against 2.22 GW unexecuted pipeline in 12-18-24 month project cycles.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Thu 7 Aug 2025 | ₹459.10 | −0.80% | +0.09% |
| 5 sessions Wed 13 Aug 2025 | ₹433.25 | −6.39% | +0.18% |
| 20 sessions Fri 5 Sept 2025 | ₹418.85 | −9.50% | +0.68% |
From the close of Wed 6 Aug 2025, ₹462.80: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.