Millworks Technologies Q2 FY27 earnings call
In brief
H1 FY27 revenue from operations was INR17.37 crores as order recognition shifted to H2; management expects FY27 revenue above INR200 crores.
- Management's tone
- Mixed
- What was said
- Mixed
- Guidance
- Guidance held
- Analyst pushback
- High
- Stock, next session
- +6.32% (Nifty 50 +1.14%)
- Revenue from operations was INR17.37 crores in H1 FY27, with gross margin at about 37%.
- About INR30 crores of orders executed in September had revenue recognition shifted into the second half under applicable accounting standards.
- The order book was INR230 crores, including a new INR111 crores export defense order described as the largest single order in its history.
- EBITDA was INR1.81 crores and net loss was INR1.83 crores as full fixed costs were set against deferred revenue.
- Management retained an FY27 revenue target above INR200 crores, citing the order backlog.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q2 FY27
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹17.4 cr | — | — | |
| EPS (₹) | ₹-1.24 | — | — |
From the company's filed results for the quarter ended 30 Sept 2026 (standalone), not from the call.
What moved the numbers, as management explained it
- About INR30 crores of September-executed orders were recognized in October, shifting revenue from H1 into H2; H1 revenue from operations was INR17.37 crores. (accounting)
- Other first-half orders, including an Indian defense order, moved into H2 because customer and regulatory approvals took longer than expected.
- About 70% of revenue from operations came in H2 last year, showing that customer programmes and billing make the second half seasonally larger.
- Gross margin was about 37% versus around 38% in H2 last year; higher raw-material prices linked to geopolitical disruption compressed it modestly.
- Fixed costs ran in full despite deferred revenue: employee cost was INR4.46 crores, finance cost around INR1.81 crores and depreciation INR1.46 crores.
- Skilled machinists and engineers were hired ahead of new capacity, adding employee cost before higher revenue arrived.
The numbers management led with
- Order book: INR230 crores, equal to 1.5x last year's revenue
- New export defense order: INR111 crores; the largest single order in company history
- Machinery IPO proceeds deployed: INR28.73 crores spent of INR61.03 crores earmarked; more than 17 new machines installed at Unit 4
- Quick Pay receivable: INR86.88 crores outstanding for more than six to eight months
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Revenue target | FY27 | FY27 revenue target: more than INR200 crores and towards that number. |
| Year-on-year growth | FY28 | FY28 year-on-year revenue growth of 60% to 70%. |
| November top line | Q3 FY27 | November top line of at least INR30 crores. |
| December top line | Q3 FY27 | December top line of at least INR40 crores. |
| Second half | H2 FY27 | A significantly stronger second half. |
| Margins | H2 FY27 | Margins to improve as deferred revenue is recognized and new capacity is utilized. |
| Receivables | Q3 FY27 | All receivables expected to close in the first week of December. |
| Build-to-print and build-to-spec mix | — | Build-to-print/build-to-spec mix to change to 50% to 50%. |
| Build-to-spec | FY29 | Build-to-spec to move towards 70%, with more build-to-spec than build-to-print in two years. |
| Entire order execution (Defense) | Q4 FY28 | INR111 crores export order completion in 12-14 months. |
| Trial orders (Aerospace) | Q3 FY27 | Aerospace trial orders in February 2027. |
| Dedicated cleanroom facility (Semiconductor machinery parts) | Q4 FY27 | Dedicated cleanroom ready in January or February 2027; semicon opportunities in Q4 FY27. |
| Anodizing facility (Aerospace and defense) | Q3 FY27 | Unit 4 anodizing facility operational in January 2027. |
| IRIS certification (Rail) | Q1 FY28 | IRIS certification planned for May 2027. |
| NADCAP certification (Aerospace and defense) | FY28 | NADCAP certification expected in July or August 2027. |
The business
By business
Defense
Certain first-half orders, including an Indian defense order, moved into H2 after customer and regulatory approvals ran late; management said no shifted order was cancelled.
INR30 crores of orders executed in September · INR86.88 crores outstanding from Quick Pay · 70% of the money stuck in the Indian defense order · INR111 crores new export defense order
Outlook: Management expects the Quick Pay receivable in December, will emphasize export defense for faster cash and targets the INR111 crores export order for 12-14-month completion.
Rail
No rail revenue was disclosed for H1; management cited Eurotunnel FAI parts and customers across 12 countries, with FAI projects expected to enter production next year.
12 countries · 6 or 7 years of customer relationships
Outlook: Eurotunnel FAI parts were expected to enter production in FY28, while IRIS certification was planned for May 2027 to open European and US orders.
Aerospace
During H1, management made Vidwan Aeronautics a subsidiary, installed nine metal 3D printers, pursued Tier 1 audits and began three R&D projects.
nine metal 3D printers · 4 weeks for prototypes · 3 months to 6 months for build-to-spec gestation · 17 new machines installed at Unit 4
Outlook: An audit was scheduled for February 2027, with clearance from at least one large European aerospace customer and trial orders sought in February.
Semiconductor machinery parts
Management said approvals for two large customers were complete and the company was doing a small value of components, but no dedicated Class 10,000 cleanroom existed yet.
Class 10,000 cleanroom
Outlook: A dedicated cleanroom was expected in January or February 2027, with semicon opportunities to be worked in Q4 FY27.
Balance sheet, capex and funding
- IPO proceeds earmarked for working capital were INR81.50 crores; INR61.94 crores had been utilized.
- Inventory rose from INR11.47 crores in March to INR28.34 crores at September, with the entire increase in finished goods and work-in-progress.
- Trade receivables fell by around INR27.5 crores in the half as the company paid suppliers despite delayed customer collections.
- Machinery spending was INR28.73 crores against INR61.03 crores earmarked.
- INR59.03 crores of the balance of IPO proceeds was held in fixed deposits and bank accounts for offer-document uses.
- Net worth was INR232.79 crores and debt-to-equity was 0.15x, with cash greater than debt.
The industry, as management sees it
Management expects defense to remain supported by Indian indigenization and global demand for precision components, with export defense offering faster collections than domestic defense cycles. It also sees rail, aerospace and semiconductor machinery as growth avenues, although semiconductor entry depends on cleanroom readiness.
Risks management named
- Indian defense approvals, inspections and payment release can take 8–12 months
- INR86.88 crore due from Quick Pay for 6–8 months, plus INR10.59 crore advanced
- The auditor cited defense-order completion uncertainty and receivables beyond 180 days
- Some export receivables were alleged to exceed the RBI's 181-day collection requirement
- Semiconductor expansion requires a dedicated Class 10,000 cleanroom not yet operational
- Build-to-spec projects carry 3–6 month or longer gestation and approval risk
Q&A
Receivables and audit quality dominated: multiple analysts pressed on the INR86.88 crore Quick Pay balance, receivables beyond 180 days, the qualified opinion and the apparent FY27 target change. Management defended the defense approval process and maintained revenue above INR200 crore, while pledging December collections and stronger export terms, but did not provide exact R&D spending, a segment revenue split or a satisfactory explanation for missing written confirmations. Pushback was concentrated on audit evidence and cash conversion rather than the order-book narrative.
Not answered directly
- Exact FY27 R&D expenditure and revenue contribution
- Written confirmation from Quick Pay and the auditor's unresolved basis for qualification
- Quantified segment revenue mix
- Specific examples of 3D-printed prototypes converting into production orders
- A firm recovery date beyond December for the Quick Pay receivable
Asked for a number, answered without one
- Sustainable receivable days: No overall days target was given; Indian defense cash depends on staged approvals, while exports now carry advances and 30-45-day invoicing terms.
- R&D expenditure and revenue contribution: No exact spend or revenue percentage was given; three projects are underway, the German customer's project is customer-funded and two others are company-funded.
Every question, with its answer
1. Revenue deferral, receivables and business mix
Yogesh Patil, Parami Financial
Question. Did the roughly INR30 crore of September-executed orders move into October or H2 revenue? How will lumpy defense receivables be controlled? Is semiconductor machinery attractive, and how will the build-to-print/build-to-spec mix shift to improve pricing and cash conversion?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Management confirmed the orders moved into October and H2 revenue and said no orders were cancelled. Domestic defense approvals can take 8–12 months and are difficult to expedite, while export defense has clearer collection; management will increase focus on exports and decide an appropriate domestic-defense mix. Semiconductor has potential with two large customers but requires a dedicated Class 10,000 cleanroom. The near-term mix may move toward 50/50, with build-to-spec reaching 70% in about two years.
Partly answered.
2. Build-to-spec economics and certifications
Atharva Kolvankar, Spangle Advisors LLP
Question. What is the margin differential between build-to-print and build-to-spec, which customers may move from print to spec, what certifications are planned, and how will revenue mix evolve across segments?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Build-to-spec earns about 5 percentage points more than build-to-print, but carries a three-to-six-month or longer gestation, customer approval and specification-change risk. Two Israel and one Germany customers that had worked on print for three to five years were transitioning to spec. Nine metal 3D printers can now deliver prototypes within four weeks. All four plants hold AS9100D Revision D certification through May 2027; management was pursuing IRIS, EN welding and NADCAP certifications.
Follow-up. Management had not directly quantified the segment mix; which segments would lead over the next couple of years?
Answer. Defense remains the first segment, followed by rail, aerospace and semiconductor machinery. Management wants aerospace to move ahead of rail and was investing in cleanroom and process systems for qualification by major European aerospace companies.
3. R&D expenditure and project pipeline
Shivam Virmani, Asset Management Private Limited
Question. What R&D expenditure is expected in FY27, what revenue contribution is anticipated from R&D, and what are the specific projects under development?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Management described three projects: a German customer's complete assembly, for which design and prototype work was complete and field trials were planned within three months; and longer-duration IC-engine and jet-engine projects developed for existing customers. The German customer would fund the full R&D cost of the first project, while Millworks would fund the other two. Management declined to give an exact R&D budget and said the company-funded projects would have a revenue implication in about two years.
Follow-up. What was the nature of Millworks' investment in Quick Pay Private Limited, and is further investment contemplated?
Answer. Millworks acquired an approximately 8% stake when Quick Pay had an order for around 960 loitering-munition drones and began supplying it components for backward integration. Management said no further investment had been decided and would be considered only after receivables were recovered; the company remained exposed to the already-executed project.
Partly answered.
4. Concentration of defense receivables
Ashok Agarwal, Technip Limited
Question. Are the significant receivables concentrated in international or Indian customers, and is there any execution hurdle to their collection?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Management said a major Indian customer in which Millworks had an investment accounted for the stuck money, with roughly 70% of the relevant amount tied to that defense order. Collection was expected in the first or second week of December. Domestic defense projects typically require 8–12 months and the delivered order had involved about 17 inspections, but management denied any substantive hurdle beyond Army validation and payment processes.
Follow-up. What is management's FY27 revenue expectation and expected growth in FY28?
Answer. Management maintained FY27 revenue above INR200 crore and said October revenue had exceeded INR50 crore, with at least INR30 crore and INR40 crore targeted for November and December. It targeted 60–70% year-on-year revenue growth in FY28, citing first-article-sample conversions, export projects and a higher build-to-spec mix.
5. Quick Pay receivable and procurement advance
Niraj Chhajer, Pransh Business Ventures Private Limited
Question. Management's results carried a qualified opinion, yet Quick Pay owed INR86.88 crore for six to eight months and had received an INR10.59 crore advance. Why was the advance given, what did Millworks supply, and why does Millworks carry the credit and profit risk?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Millworks supplies components and assemblies to Quick Pay under a defense contract. The advance was for GPS and other electronic items that Quick Pay had to procure under its own defense licence and could not be bought in Millworks' name. Management acknowledged the arrangement left Millworks exposed and expected the outstanding amount to be recovered in December.
Follow-up. With total receivables of INR142 crore, how could INR38.11 crore due for over six months comply with the RBI's 181-day export collection rule, and had the FY27 revenue target really fallen from INR247 crore to INR200 crore?
Answer. Management said substantial collections occurred in October and the first week of November and expected all balances to close by the first week of December. Relevant European export terms were changed to a 30% advance and 30–45 days from invoice rather than delivery. Management denied reducing the revenue target, saying it remained above INR200 crore and was supported by the order backlog.
6. Export order execution timeline
Abhinav, Steel Impacts AIS
Question. What execution timeline is expected for the recently received INR111 crore order, including development, first-article inspection and production completion?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Development was expected to take six months, the first-article inspection about three months, and full execution 12–14 months. The order includes component, sheet-metal, machined, bought-out, assembly and sub-assembly work, with production orders beginning after the first-article inspection.
Follow-up. Would the order therefore be completed by the final quarter of FY28?
Answer. Management confirmed that the total execution period of 14 months would place completion in the final quarter of FY28.
7. Basis for qualified audit opinion
Chitresh, Ninedot Holdings
Question. Why did the auditor issue a qualified opinion, had the relevant components actually been supplied, and had Quick Pay recorded the related revenue after the delivery and assembly process?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Management said the qualification principally reflected uncertainty over completion of the defense order and receivables that had exceeded 180 days. Auditors had visited Quick Pay's facility and observed the inventory, but required documentary delivery receipts from the Indian Army that had not been received. Management said it had supplied the components, Quick Pay had assembled and tested them, and expected collection in December, but could not fully explain the auditor's conclusion.
Follow-up. Why had Quick Pay not provided a written confirmation that it received Millworks' materials when it had already prepared test reports and booked the relevant revenue?
Answer. Management repeated that the parts had been supplied by the end of March and that auditors had seen them at Quick Pay's facility. It could not explain why written confirmation was absent, attributing the decision to individual perceptions, and repeated that the priority was recovering the money.
Not answered directly.
8. Quick Pay recovery certainty
Vishal Mehta, V M Investments
Question. Should investors assume the amount due from Quick Pay will be received consistently by March 2027?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Management did not commit to a March 2027 collection date and said only that there would be good news in December. It described the Quick Pay recovery as an active priority but offered no additional documentary evidence or firm timetable.
Follow-up. What is the French project management referenced, and how confident is management in achieving FY27 revenue of INR200–240 crore?
Answer. Millworks was working on projects for a French tooling company, with current development expected to convert into 2027 orders and a larger contribution from aero-tooling assemblies and sub-assemblies. Management expressed confidence in FY27 revenue above INR200 crore because other, mostly export, projects were advanced, but did not endorse the analyst's INR220–240 crore range.
Not answered directly.
9. Export advances and cash conversion
Mayur Parekh, V-Vac Capital
Question. What has been the international-customer response to 30% advances on new export orders, and how are the revised terms improving working capital and cash flow?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Management said raw materials represent roughly 40–45% of product cost, so a 30% customer advance broadly matched the immediate material requirement. The relevant European customer had been cooperative. Rail customers across almost 12 countries, with relationships of six to seven years, generally paid on time and did not provide advances; management instead changed payment to invoicing rather than delivery and offered customer choice of logistics.
Partly answered.
10. 3D printing and prototype commercialization
Vidhi Purohit, Phoenix Capital
Question. How is the in-house 3D-printing capability helping Millworks engage customers at product-development stage, and are there examples where prototype development has translated into production enquiries or orders?
Answer, Mr. Sridhar Acharya, Promoter and Managing Director. Millworks now performs prototypes in-house. For build-to-spec work it designs in CATIA or SolidWorks, obtains customer design approval and makes metal, carbon-fiber or SLS-plastic prototypes, billing the prototype separately. Management said production normally follows within three to six months, but did not identify a specific customer where a 3D-printed prototype had already converted into a production order.
Partly answered.
What was said
Topic by topic, in the order it was spoken
IPO Listing and Shareholder Accountability · Sridhar Acharya (Promoter and Managing Director)
- This was Millworks' first earnings call as a listed company following its July IPO.
- The IPO issue was subscribed 219.54 times, and management emphasized the resulting accountability to shareholders.
- Management framed the prepared discussion around H1 revenue, deployment of IPO proceeds and the current business outlook.
- The company said it would report material developments through the stock exchange before providing selective updates.
H1 Revenue Timing and Defense Approvals · Sridhar Acharya (Promoter and Managing Director)
- About INR30 crore of orders executed in September were recognized in October because the transfer of risks and rewards occurred after September-end.
- Other planned orders, including an Indian defense order, moved into H2 because customer and regulatory approvals took longer than expected.
- Management said none of the shifted orders had been cancelled and that work continued on all of them.
- Management noted that about 70% of revenue from operations arrived in H2 last year, although the shift was larger this year.
Inventory Build and Supplier Payments · Sridhar Acharya (Promoter and Managing Director)
- Inventory increased from INR11.47 crore in March to INR28.34 crore at September-end.
- Management said the entire increase consisted of finished goods and work-in-progress carried at cost and awaiting billing.
- It argued that the effort and cost of first-half production were already recognized, with corresponding revenue expected to follow.
- Millworks reduced trade receivables by around INR27.5 crore and paid suppliers rather than making them wait for delayed defense-customer approvals.
- Advances to suppliers supported materials for H2 orders and the corresponding inventory build.
IPO Proceeds, Capacity and Balance Sheet · Sridhar Acharya (Promoter and Managing Director)
- Millworks had utilized INR61.94 crore of the INR81.50 crore earmarked for working capital.
- Machinery expenditure reached INR28.73 crore against INR61.03 crore earmarked, with new machines being installed and commissioned in stages at Unit 4.
- More than 17 new machines had already been installed at Unit 4, which management expects to increase machining capacity and enable complex, high-precision work.
- INR59.03 crore of IPO proceeds remained in fixed deposits and bank accounts for deployment according to the offer document.
- Management reported INR232.79 crore of net worth and 0.15x debt-to-equity, with cash exceeding debt.
- Management continued to expect the relevant receivables to be realized during Q3 as approvals came through.
Order Book and Export Defense · Sridhar Acharya (Promoter and Managing Director)
- The order book stood at INR230 crore, equal to 1.5x the prior year's revenue.
- A new INR111 crore export defense order was the largest single order in the company's history.
- Exports had contributed more than one-quarter of revenue in the prior year, and the new order was expected to reinforce that business.
- Management viewed Indian indigenization and global demand for precision components as favorable to its defense strategy.
- The company intended to build both domestic and international defense positions while improving cash-collection discipline.
New Capabilities and Aerospace Qualification · Sridhar Acharya (Promoter and Managing Director)
- All four manufacturing units were operational, with Unit 4 undergoing staged machine installation and commissioning.
- Millworks made Vidwan Aeronautics a subsidiary to strengthen its aero-engine component capabilities.
- A 3D-printing centre of excellence was established with Markforged, USA for faster prototypes, fixtures and tooling.
- The company signed an MoU with TridenTech to co-develop UAV engines.
- Process audits by major aerospace companies were under way as part of Millworks' effort to move from Tier 2 to Tier 1 supplier status.
H1 Margin and Operating Leverage · Sridhar Acharya (Promoter and Managing Director)
- H1 revenue from operations was INR17.37 crore, with gross margin of about 37% versus approximately 38% in H2 last year.
- Management attributed the modest margin compression to higher raw-material prices linked to geopolitical disruption and global supply chains.
- The loss reflected full-period fixed costs, including INR4.46 crore of employee expense, approximately INR1.81 crore of finance cost and INR1.46 crore of depreciation.
- Millworks had added skilled machinists and engineers ahead of new capacity even though much of the associated revenue moved to H2.
- H1 EBITDA was INR1.81 crore and net loss was INR1.83 crore.
- Management expected deferred revenue and higher utilization of new capacity to improve operating leverage and margins.
H2 Recovery and Disclosure Discipline · Sridhar Acharya (Promoter and Managing Director)
- Management expected deferred revenue recognition and the ramp-up of Unit 4 to produce a significantly stronger H2.
- The order book, strengthened balance sheet and new capacity were presented as the foundation for better operating leverage.
- Management reiterated that all material information would be released through the exchange first.
- Management committed not to provide figures it could not substantiate and described its ambition as disciplined, sustainable long-term growth.
In their words
I want to be very clear on one point no order has been cancelled. Every one of these orders remains with us and work on them is progressing.
My commitment to you is very simple. Anything material will reach you through the exchange first. We will not give you numbers we cannot stand behind.
I have not revised the revenue target. It will be, I use this word, it will be more than 200 and it will be towards that number.
To check next time
What management committed to on this call, or the dates they gave.
- December collection of the INR86.88 crores Quick Pay receivable and other defense receivables, with an exchange disclosure.
- November and December revenue against the stated minimums of INR30 crores and INR40 crores, respectively.
- FY27 revenue against the target above INR200 crores and the promised stronger H2.
- Unit 4 machine commissioning and conversion of INR28.34 crores of inventory into billed revenue.
- Readiness of the semicon cleanroom in January-February 2027 and conversion of Q4 opportunities into orders.
- February 2027 aerospace audit, customer clearance and trial orders.
Transcript
Read along with the recording
The whole call, 255 lines from 7 speakers over 1:03:07. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Thu 19 Nov 2026 | ₹783.95 | +6.32% | +1.14% |
From the close of Wed 18 Nov 2026, ₹737.35: the call began at 16:00 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.