Neetu Yoshi Q2 FY27 earnings call

Fri 20 Nov 202613:00 IST

In brief

Management targeted FY27 revenue of ₹200 crore and 25% PAT margin, citing an approximately ₹160 crore order book.

Management's tone
Mixed
What was said
Mixed
Guidance
Guidance held
Analyst pushback
Medium
  • FY27 revenue target was ₹200 crore; the mid-September plant start cost about ₹10 crore of H1 revenue.
  • The FY27 PAT margin target was 25%, while higher input costs and delayed PVC recovery pressured H1 margins.
  • FY28 revenue was targeted at ₹350 crore, with 25% revenue growth expected in FY29.
  • Order book was approximately ₹160 crore; the new plant was running at about 20% efficiency versus a 50% FY27 target.
  • H1 revenue rose 34% YoY, but management attributed slower EBITDA growth to higher steel and chemical prices and lagged PVC recovery.

An AI read of our transcription of MarketPing's recording

The numbers

The quarter, Q2 FY27

This quarterA year agoLast quarterMargin
Revenue₹59.2 cr——
EBITDA (excl. other income)₹16.7 cr——28.3%
Net profit₹12 cr——20.3%
EPS (₹)₹3.09——

From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • H1 revenue rose 34% YoY, while EBITDA grew 6.5% because higher steel and chemical prices increased cost of goods.
  • PVC recovery lagged: railway supplementary bills for earlier R-notes were booked in the current quarter, while private rate resets lagged by one to two months.
  • The new plant started in mid-September rather than early September and ran at about 20% efficiency, reducing H1 revenue by approximately ₹10 crore.
  • H1 revenue mix was approximately 40% wagon, 40% track and 20% coach.

The numbers management led with

  • FY27 revenue target: ₹200 crore
  • FY28 revenue target: ₹350 crore
  • Order book: Approximately ₹160 crore, with execution extending to mid-September FY28
  • New-plant utilization trajectory: About 20% currently; one answer targeted approximately 50% in FY27 and 100% in FY28, while a later answer indicated FY27 at 20-25%

Guidance

Guidance on this call

WhatForWhat management said
Revenue targetFY27FY27 revenue target of ₹200 crore.
PAT margin targetFY27FY27 PAT margin target of 25%.
Revenue targetFY28FY28 revenue target of ₹350 crore.
Revenue growthFY29FY29 revenue growth expectation of 25%.
Capex (Track section)FY27FY27 capex target of ₹10 crore, directed to the track section.
New plant efficiencyFY27Approximately 50% efficiency at the new plant in FY27.
New plant efficiencyFY28100% efficiency at the new plant in FY28.
Track section revenueFY27Track-section revenue of ₹60 crore expected in FY27.
Track section capacityFY29Track-section capacity to rise from ₹50–60 crore to ₹100 crore.
Revenue-potential breakup (Wagon section)—Approximately 40% of forward revenue potential expected from wagons.
Revenue-potential breakup (Track section)—Approximately 40% of forward revenue potential expected from tracks.
Revenue-potential breakup (Coach section)—Approximately 20% of forward revenue potential expected from coaches.
ExportsFY28Exports targeted for FY28; FY27 focused on Indian Railways.
Brake support revenue start (Railway safety products)FY27Brake-support revenue expected to start in about two months.
Major product approvalsFY27Major product approvals expected by mid-January.

What changed since the Thu 4 Jun 2026 call

WhatOn the Thu 4 Jun 2026 callOn this call
FY27 revenue guidance (cut)FY27 revenue guidance of ₹210–220 crore.FY27 revenue target of ₹200 crore.
FY27 PAT margin (held)FY27 PAT margin guidance of 25%.FY27 PAT margin target of 25%.
FY27 order book (raised)FY27 order book of ₹140–150 crore.Order book of approximately ₹160 crore.
FY28 revenue guidance (held)FY28 revenue guidance of about ₹350 crore.FY28 revenue target of ₹350 crore.
New plant commissioning (delayed)New bogie plant operational in June 2026.New plant began operating from 13 September 2026.
FY27 capex allocation (restated)About ₹10 crore remained for the bogie plant.₹10 crore FY27 capex targeted for track-section expansion.
Track-section revenue outlook (restated)Track-section revenue of ₹60–70 crore targeted in FY28.₹60 crore expected in FY27; track capacity targeted to rise to ₹100 crore.
Export launch (held)Exports targeted for FY28 after meeting the precision-engineering quality bar.Exports targeted for next year; FY27 focused on Indian Railways.

The business

By business

Wagon section

Wagon demand and order releases were picking up. The segment contributed about 40% of H1 revenue, and management expected a similar forward revenue-potential mix.

H1 revenue mix approximately 40% · Forward revenue-potential mix approximately 40%

Outlook: Management expected wagon orders to increase as market demand improved.

Track section

Track contributed about 40% of H1 revenue and was described as having the highest revenue potential in coming years; current capacity was ₹50–60 crore.

H1 revenue mix approximately 40% · Forward revenue-potential mix approximately 40% · Current capacity ₹50–60 crore

Outlook: Track-section revenue was expected at ₹60 crore in FY27, with capacity targeted to rise from ₹50–60 crore to ₹100 crore.

Coach section

Coach contributed about 20% of H1 revenue, and management said its margins were much higher than those in wagon and track.

H1 revenue mix approximately 20% · Forward revenue-potential mix approximately 20%

Balance sheet, capex and funding

  • The company was debt-free, with no working-capital loan or term loan outstanding.
  • Account balance was approximately ₹15 crore at the end of H1.
  • FY27 capex was targeted at ₹10 crore, focused on track-section machinery, sheds and the total-turnout system.
  • Future expansion was to be funded from internal accruals, with no plan for new debt or dilution.
  • H1 operating cash flow was cited at about ₹20 crore and trade receivables at down about ₹6 crore; management linked part of the strength to February-March railway-fund timing.

The industry, as management sees it

Management said the Railway wagon market was picking up and expected additional orders by February, while track and private orders continued to flow. No explicit broader macroeconomic or sector forecast was provided.

Risks management named

  • New plant started only in mid-September, costing about ₹10 crore of expected H1 revenue
  • Steel and chemical cost inflation outpaced PVC recovery, compressing reported margins
  • FY27 delivery requires a sharp H2 ramp while new-plant utilization is only about 20%
  • Railway product rejections can require material replacement and deductions from pending bills
  • New product and bogie commercialization remains dependent on approvals

Q&A

Q&A focused on management's ability to deliver FY27 revenue guidance despite H1 pressure, followed by FY28-FY29 growth, order-book execution, plant utilization, margins, capex and funding. Pushback was strongest when an analyst characterized H1 as weak, prompting management to reject that framing and defend its target with a plant-level revenue bridge. Management was specific on capacity and product approvals but less forthcoming on formal beyond-FY28 guidance, tender win rates, export economics and main-board migration timing.

Not answered directly

  • Formal revenue guidance beyond FY28
  • Export opportunity size, product mix and margins
  • Numerical tender win ratio
  • Main-board migration timing

Asked for a number, answered without one

  • Tender win ratio: Management explained that L1 position determines a tender win and that some bids use higher prices to observe market trends, but gave no win-rate percentage.
  • Export opportunity and margins: Management said FY27 is focused on Indian Railways and exports are targeted for FY28, but gave no export value, product mix or margin.
  • Operating cash-flow guidance: Management only said it expects strong cash flow and linked part of the prior strength to railway funds being exhausted in February and March.
  • H2 margin rebound: Management cited ongoing PVC negotiations and confidence in maintaining margins, but gave no separate H2 margin or rebound figure.
  • Main-board migration timing: Management said listing rules may change in January and it would see how they apply, without confirming a migration date.

Every question, with its answer

  1. 1. Product mix and PAT margin

    Sankalp Pandey, Individual investor

    Question. What was the contribution from non-wagon products in FY26 and what is expected in FY27 and thereafter? Given a lower wagon mix, why did margins decline despite PVC clauses, and is the roughly 25% PAT-margin guidance intact?

    Answer, Himanshu Loya, Managing Director and CFO. Management gave an approximate 45% contribution in FY26 and about 40% expected going forward, but did not clearly resolve whether those figures referred to wagons or non-wagons. It said wagon orders were also recovering and that the wagon business remained a developed segment for the company.

    Follow-up. Why did margins decline despite PVC clauses, and has the approximately 25% PAT-margin target been revised?

    Answer. Management said margin compression reflected delayed PVC recovery. For Railways, supplementary bills can be raised only after the relevant R-note is generated, while private-customer price resets typically lag input-cost increases by one or two months. It maintained the FY27 PAT-margin target at approximately 25%.

    Partly answered.

  2. 2. FY27 revenue target and plant bridge

    Javed Pinjari, Infinity Invest

    Question. Could future results and conference calls be announced together? Is the FY27 revenue target of approximately ₹200 crore still intact, and what is the plant-level revenue bridge behind it?

    Answer, Himanshu Loya, Managing Director and CFO. Management agreed to consider announcing future results and calls together and reiterated the FY27 revenue target of ₹200 crore. It described an old plant with approximately ₹100 crore of annual capacity, an upgraded old facility capable of approximately ₹50-60 crore, and a new plant with approximately ₹200 crore of annual capacity. It said the upgraded and new plants' H2 contributions would complete the ₹200-crore target.

  3. 3. FY28 guidance and order book

    Preet Shah, Blue Star Capital

    Question. What is management's revenue guidance for FY28, and what is the current order pipeline from bids and open tenders?

    Answer, Himanshu Loya, Managing Director and CFO. Management said the FY27 target was ₹200 crore and the FY28 target was ₹350 crore. It declined to provide formal guidance beyond FY28 because outcomes would depend on three ongoing projects, but said revenue would grow. The current order book was approximately ₹160 crore, supplemented by continuing private orders and regular Railway tender flow.

  4. 4. H2 delivery confidence

    Achut Sabat, Tukan Capital

    Question. Given the weak H1 and the need to deliver roughly ₹140 crore in H2, what gives management confidence in maintaining FY27 revenue guidance of ₹200 crore, and can the approximately ₹150-160 crore order book be fully executed this year?

    Answer, Himanshu Loya, Managing Director and CFO. Management rejected the characterization of H1 as weak and said the old plant had generated about ₹50 crore in H1 and was expected to repeat roughly that amount in H2. The extension facility had contributed approximately ₹11 crore and was expected to rise to about ₹30-35 crore. The new plant began on September 13, causing an estimated ₹10 crore revenue loss versus an earlier commissioning expectation, but management said the order book was already in hand.

    Follow-up. What is peak capacity after expansion, can margins recover in H2, and by when will the ₹160 crore order book be executed?

    Answer. Management placed total peak capacity at roughly ₹260-350 crore. It attributed margin pressure to higher steel and chemical costs and the lag in PVC pass-through. The order book was expected to be delivered through mid-September of the following year.

    Partly answered.

  5. 5. Capex and capacity expansion

    Rajesh Singla, BTG Capital

    Question. Is management planning major FY28 capex to support FY29 revenue, and what capex is planned over the next six months for the track section?

    Answer, Himanshu Loya, Managing Director and CFO. Management said the exhausted track-section capacity would be expanded with additional machinery, sheds and land. The FY27 capex target was approximately ₹10 crore, focused on track-section and turnout-system investments. It indicated that further capex would also be undertaken in FY28 as the existing capacity filled.

    Follow-up. Can investors assume 30-40% revenue growth in FY29 over FY28?

    Answer. Management indicated that investors could expect approximately 25% growth in FY29.

  6. 6. FY29 products and pipeline

    Anil Shenoy, Individual investor

    Question. For FY29 and beyond, will growth continue through existing products or will new product lines be added, including the utility vehicles and rubber products discussed previously?

    Answer, Himanshu Loya, Managing Director and CFO. Management identified multiple potential contributors, including utility vehicles and rubber sections, but said FY29 and beyond revenue would depend on the progress of two or three ongoing projects. It maintained that this was not formal guidance.

    Follow-up. What is the latest update on the previously discussed migration of the company to the main board?

    Answer. Management said the company had completed about one year since listing, that the prevailing guideline referred to three years, and that guidelines might change in January. It did not commit to a migration date.

    Not answered directly.

  7. 7. Plant utilization and disclosure

    Amit Karawat, Global Financial Services

    Question. What is current-month capacity utilization at the old and new plants, and will the company provide quarterly results going forward?

    Answer, Himanshu Loya, Managing Director and CFO. Management said the old plant was operating at full efficiency while the newer plant was at approximately 20% utilization. It said the company was working toward greater quarterly-result disclosure for individual investors but did not give a firm implementation date.

    Partly answered.

  8. 8. Segment mix and margin ranking

    Sankalp Pandey, Individual investor

    Question. What is the product-wise split of the approximately ₹360 crore peak revenue potential across wagons, coaches and railway tracks, which segment has the highest margins, and what was the approximate H1 contribution from each?

    Answer, Himanshu Loya, Managing Director and CFO. Management estimated the revenue mix at approximately 40% wagons, 40% tracks and 20% coaches. It said the coach segment carried the highest margins, while the track segment offered the highest revenue potential. The H1 segment mix was described as broadly similar to the long-term mix.

  9. 9. New-facility ramp and revenue potential

    Aman Shekhawat, Family Office

    Question. How has the newly commissioned facility ramped up, what operational challenges remain, what utilization is targeted for FY27 and FY28, and what revenue potential does the expanded manufacturing infrastructure offer at normalized utilization?

    Answer, Himanshu Loya, Managing Director and CFO. Management treated the question as referring to the newly commissioned facility and said it was operating at approximately 20%, with orders in hand and ramp-up as the immediate focus. It targeted approximately 50% utilization in FY27 and 100% in FY28. It reiterated combined revenue potential of approximately ₹350 crore from the three facilities.

    Partly answered.

  10. 10. Margin pressure and FY27-FY28 outlook

    Manish Gupta, Mavi Capital

    Question. Why did revenue grow much faster than EBITDA, what caused the increase in cost of goods, and what broad revenue, margin, capacity-utilization and profitability milestones should investors track for FY27 and FY28?

    Answer, Himanshu Loya, Managing Director and CFO. Management said cost of goods sold was the reason EBITDA grew much more slowly than revenue, with steel and chemical prices increasing. It reiterated the ₹200 crore FY27 and ₹350 crore FY28 revenue targets. The key operating milestones were maintaining full efficiency at the old plant and progressively improving the new plant's utilization.

  11. 11. Order allocation and geographic mix

    Mahesh Jain, Venture X Alpha AIS

    Question. How much of the approximately ₹160 crore order book is specific to the new facility, and why did West Bengal's revenue contribution decline while Uttar Pradesh increased?

    Answer, Himanshu Loya, Managing Director and CFO. Management said the order book was combined across facilities. Approximately ₹45-50 crore was specific to the new unit, while the remainder could be produced at either facility. It attributed the geographic shift to the broader customer mix: the company now serves wagon, track and coach customers, with a large proportion of track customers based in Uttar Pradesh.

    Follow-up. What was track revenue in H1, what new-plant utilization is expected in FY27 and FY28, are any debt or equity raises planned, and what is included in the private-customer revenue segment?

    Answer. Management reiterated an approximately 40% track, 40% wagon and 20% coach mix. In one response, it indicated FY27 new-plant utilization of 20-25% and full utilization in FY28. It said the company was debt-free, had no working-capital or term loans, held approximately ₹15 crore of cash and planned to fund expansion through internal accruals. Private revenue included private railway companies and certain heavy-engineering products.

  12. 12. Product rejection and liability

    Jagdeep Singh, JSDS Equities

    Question. Have any supplied parts been rejected by customers, and what financial or operational consequences follow if a rejection or part failure occurs?

    Answer, Himanshu Loya, Managing Director and CFO. Management said rejections were uncommon in direct Railway supplies but did occur. Rejected material was recovered and replaced, and the corresponding amount could be deducted from pending bills. It acknowledged a higher failure risk while private-customer products were still in the development stage, but said rejections were not an issue once a product had settled.

    Partly answered.

  13. 13. Exports and bogie commercialization

    Ajay Pabbat, Jyoti Capital

    Question. How large is the export opportunity, which products would be exported and at what margins, and what is the status and manufacturing capacity of the proposed bogie product?

    Answer, Himanshu Loya, Managing Director and CFO. Management said exports were not a FY27 priority because the company was fully focused on Railways and current product development. It aimed to target export opportunities in the following year but did not quantify the opportunity, products or margins. It said bogies had already been manufactured at the plant, approval work was ongoing, demonstrations were prepared, and manufacturing capacity was 500 bogies per month.

    Not answered directly.

  14. 14. Product flexibility and R&D

    Rajesh Sinha, BZ Capital

    Question. How easily can the company switch among its approved product lines, what is the status of specialty rubber-product development, how large is the R&D team, does the company own the relevant designs, and is any external technology transfer involved?

    Answer, Himanshu Loya, Managing Director and CFO. Management said the plants were adaptable and production could be adjusted according to demand and pricing across sectors. It planned to bring rubber and spring components used in bogie assemblies in-house. The company works from Railway specifications and drawings and contributes to product design development. Its new-product-development team had approximately 12-15 people; no external technology-transfer requirement was indicated.

  15. 15. PVC cost pass-through

    Aditya Bagaria, Shree Sishankar Investments

    Question. Are raw-material cost increases recovered through the PVC mechanism for both Railway and private customers, and can management pass through higher steel or chemical costs without affecting margins?

    Answer, Himanshu Loya, Managing Director and CFO. Management said Railway supplementary bills cover the eligible PVC amount after the relevant material documentation is completed. For private customers, recovery occurs through commercial negotiations and price revisions. Because the original material had already been supplied, management said the supplementary recovery should not directly reduce profit, although timing can affect reported margins.

    Follow-up. Is the company pursuing new tenders, how many tenders are filed, and what is the tender win ratio?

    Answer. Management said the company filed more than 15-20 tenders every day. It explained that orders are generally awarded when the company is L1 for a product, but did not disclose a numerical win ratio.

    Partly answered.

  16. 16. Cash-flow sustainability

    Anil Shenoy, Individual investor

    Question. Is the strong operating cash flow expected to continue, and was it driven by any one-off working-capital movement or a temporary collection cycle?

    Answer, Himanshu Loya, Managing Director and CFO. Management expected strong cash flow to continue and attributed the unusually strong prior-period flow to seasonality. It said Railway funds are exhausted toward the end of February and March, followed by debtor collections in April, making March and the following month appear unusually strong. It expected cash flow to grow over time.

  17. 17. New product approvals and orders

    Avishay Malhotra, Individual investor

    Question. What orders and revenue are expected from the newly approved CCSB product, what is the status of the friction wedge and brake support, and when are the more than 25 RDSO product approvals expected?

    Answer, Himanshu Loya, Managing Director and CFO. Management said it had approximately ₹11-12 crore of CCSB orders and that the product was already operational with orders continuing. Revenue from the approved friction wedge had started, while the brake support was in final prototype and development work and was expected in about two months. More than 25-30 product applications were in development, with major approvals targeted by mid-January.

What was said

Topic by topic, in the order it was spoken

Opening and Transition to Q&A · Himanshu Loya (Managing Director and CFO)

  • The H1 FY27 results had already been released and were available to investors.
  • Management did not provide a separate prepared financial or operating update.
  • The CEO invited questions on current performance, future plans and business execution before the Q&A began.

In their words

So our target stays at maintaining PAT margins at twenty-five percent, and we are working on that, that direction.
Himanshu Loya (Managing Director and CFO, Neetu Yoshi Limited)
So we right now, order book we have is approximately one hundred and sixty crores in hand, so which is suitable for the whole year of planning what, what we have, and we are continuing.
Himanshu Loya (Managing Director and CFO, Neetu Yoshi Limited)
Twenty-five percent you can expect, sir.
Himanshu Loya (Managing Director and CFO, Neetu Yoshi Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • New-plant efficiency against the FY27 50% target, from about 20% on the call.
  • Revenue progress toward ₹200 crore in FY27 after the mid-September plant start.
  • PAT margin delivery against the 25% FY27 target as PVC recovery catches up.
  • Execution of the approximately ₹160 crore order book through mid-September FY28.
  • FY27 capex deployment of ₹10 crore in track-section capacity.
  • Brake-support revenue within two months and major product approvals by mid-January.

Transcript

Read along with the recording

The whole call, 248 lines from 15 speakers over 49:14. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.

Sign up freeLog in

The stock after the call

No session has closed since the call yet.

From the close of Thu 19 Nov 2026, ₹174.10: the last close before the call, which began at 13:00 IST. Adjusted daily closes; the move includes everything else that happened in those sessions.