Oswal Pumps Q4 FY26 earnings call
In brief
Oswal Pumps guides FY27 revenue growth of 20-25% with back-ended profile, EBITDA margin 22-23%, as it awaits PM-KUSUM 2.0 rollout.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −3.73% (Nifty 50 +0.03%)
- FY26 revenue grew 44.3% YoY to INR2,064 cr; Q4 FY26 revenue INR510 cr (+39.8% YoY); FY26 PAT INR376 cr (+34.1%).
- Guided FY27 revenue growth of 20-25% with back-ended profile; H1 may see temporary revenue decline tied to PM-KUSUM 2.0 timing.
- Guided FY27 operating EBITDA margin of 22.0-23.0% and PAT margin of 15-16%, citing input cost and competitive pricing pressure.
- Order book stood at 19,912 pumps with an additional pipeline of 25,000+ pumps as of May 15, 2026; over 1,06,122 systems cumulatively executed.
- FY27 capex of around INR350 crores planned; pump-motor capacity and 1 GW solar module expansion targeted by Q1 FY27, remaining 0.5 GW by Q3 FY27.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹510 cr | +39.8% | +1.7% | |
| EBITDA (excl. other income) | ₹119 cr | +20.2% | −5.1% | 23.3% (27.1% a year ago) |
| Net profit | ₹0 cr | — | — | 0% (0% a year ago) |
| EPS (₹) | ₹8.55 | +35.3% | +3.5% |
From the company's filed results for the quarter ended 31 Mar 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Q4 FY26 EBITDA margin moderated sequentially to 23.2% from 25.4% in Q3 due to competitive tender pricing and geopolitical input cost pressures.
- FY26 operating income grew 44.3% on disciplined execution under PM-KUSUM and state schemes including Maharashtra Magel Tyala.
- Q4 PAT of INR93 cr was reported; the filed net profit to owners line shows INR0.00 cr, suggesting different classification (likely post-minority-interest or specific sub-line). (accounting)
- Operating cash flow for FY26 was negative INR77 cr as per books, but a INR116 cr Maharashtra government payment received on April 2, 2026 effectively turned it positive at INR39 cr. (one-off)
- Receivable days remained elevated at 155 days due to delays from Maharashtra (MSEDCL) and other state nodal agencies; cash conversion cycle improved modestly to 172 days from 177 days.
The numbers management led with
- Executable order book: 19,912 pumps as of May 15, 2026
- Rooftop/utility/C&I pipeline: ~300 MW combined pipeline across rooftop solar, utility, and C&I segments
- Solar module capacity expansion: 600 MW to 2.1 GW (2.1 GW total) — Phase 1 (1 GW) by Q1 FY27, remaining 0.5 GW by Q3 FY27
- FY27 total capex: ₹350 crore total capex in FY27 (₹90 crore IPO proceeds for pump automation + Oswal Solar expansion)
- Operating cash flow: Improved from negative ₹142 crore (FY25) to negative ₹77 crore (FY26); Q4 FY26 positive at ₹171 crore
- Non-pump revenue target: ~₹1,000 crore from rooftop solar, utility, and C&I segments in FY27
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 overall revenue growth | FY27 | Targeting overall growth of 20% to 25% over the previous year for FY27 |
| FY27 operating EBITDA margin | FY27 | FY27 operating EBITDA margin in range of 22.0% to 23.0% |
| FY27 PAT margin | FY27 | PAT margins expected to be in range of 15% to 16% for FY27 |
| Medium-term revenue CAGR | medium-term | Sustained growth momentum of 30% to 40% in the medium term beyond FY27 |
| FY27 capex | FY27 | Around INR350 crores of total capex in FY27 |
| Pump-motor capacity expansion completion (Solar Pumps) | Q3 FY27 | Entire pump-motor capex program scheduled for completion by Q3 FY27 |
| Solar module 1 GW expansion completion (Solar Modules) | Q1 FY27 | First phase of 1 GW solar module expansion to be completed by Q1 FY27 |
| Solar module 0.5 GW expansion completion (Solar Modules) | Q3 FY27 | Remaining 0.5 GW solar module expansion planned by Q3 FY27 |
| Non-pump verticals FY27 business (Rooftop / Utility / C&I Solar) | FY27 | Expecting around INR1,000 crores business from rooftop and other non-pump verticals this year |
What changed since the Mon 9 Feb 2026 call
| What | On the Mon 9 Feb 2026 call | On this call |
|---|---|---|
| FY27 revenue growth guidance (restated) | FY26 revenue growth guidance maintained at ~50% YoY | FY27 revenue growth guidance of 20-25% |
| FY27 operating EBITDA margin guidance (restated) | Q4 FY26 EBITDA margin guided to 25.5-26.0% | FY27 operating EBITDA margin guided to 22.0-23.0% |
| FY27 PAT margin guidance (restated) | FY26 PAT margin 17.5-19.0% | FY27 PAT margin 15-16% |
| Medium-term revenue CAGR target (raised) | Medium-term revenue CAGR target of 30-35% reiterated | Medium-term revenue growth 30-40% |
| PM-KUSUM 2.0 status (delayed) | PM KUSUM 2.0 expected end-March / early-April 2026; finance ministry approved | PM KUSUM 2.0 still awaited; expected launch around June; first execution from November onwards |
| Order book size (cut) | Order book 24,500+ pumps | Order book 19,912 pumps; pipeline 25,000+ pumps |
| Cash conversion cycle (achieved) | Cash conversion cycle widened to 177 days | Cash conversion cycle improved to 172 days |
| Diversification verticals (achieved) | Open PM Surya Ghar, export, private solar-pump and large-rooftop EPC verticals | First PM Surya Ghar order executed; SPV incorporated for HAM rooftop projects in Rajasthan; 300 MW pipeline; solar inverter internal production planned |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| Q3 FY26 operating EBITDA margin | Q3 FY26 | 25.5–26% (on the Q2 FY26 call) | 25%, below the range |
| Operating EBITDA margin | FY26 | 27–29% (on the Q1 FY26 call) | 24.8%, below the range |
| PAT margin | FY26 | 18–20% (on the Q1 FY26 call) | 0%, below the range |
| Q4 FY26 operating EBITDA margin | Q4 FY26 | 26.25–26.75% (on the Q2 FY26 call) | 23.3%, below the range |
| FY26 PAT margin | FY26 | 17.5–19% (on the Q2 FY26 call) | 0%, below the range |
| Q4 FY26 operating EBITDA margin | Q4 FY26 | 25.5–26% (on the Q3 FY26 call) | 23.3%, below the range |
| FY26 PAT margin guidance | FY26 | 17.5–19% (on the Q3 FY26 call) | 0%, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Solar Pumps (PM-KUSUM and state schemes)
Core business driven by PM-KUSUM and state schemes like Maharashtra Magel Tyala; FY26 saw record volumes with 1,06,122 cumulative systems executed across 15 states.
FY26 operating income INR2,064 cr (+44.3% YoY) · Q4 FY26 operating income INR510 cr (+39.8% YoY) · FY26 PAT INR376 cr (+34.1% YoY) · Q4 FY26 PAT INR93 cr (+44.8% YoY) · FY26 operating EBITDA INR514 cr (+22.4% YoY, margin 24.9%) · Q4 operating EBITDA INR118 cr (margin 23.2%)
Outlook: Awaiting PM-KUSUM 2.0 rollout (expected around June); expects tender-to-execution cycle of ~5 months; FY27 growth 20-25% back-ended.
Solar Modules (Oswal Solar Energy)
Capacity being scaled from 600 MW to 2.1 GW with backward integration into aluminium extrusion and EVA; module production supports both KUSUM and new solar verticals.
Capacity scaling from 600 MW to 2.1 GW · Pipeline 300 MW across rooftop, utility, C&I
Outlook: 1 GW expansion by Q1 FY27; remaining 0.5 GW by Q3 FY27; back-ended FY27 growth dependent on KUSUM 2.0 timing.
Rooftop / Utility / C&I Solar (Diversification)
Diversification strategy launched in FY26 with first PM Surya Ghar order and 60% stake SPV (Oswal Doon Baran Bundi) for rooftop projects in Rajasthan under HAM model.
Combined pipeline ~300 MW · FY27 expected business ~INR1,000 cr from non-pump verticals
Outlook: Management guided ~INR1,000 cr business from these segments in FY27; profitability not yet quantified.
Balance sheet, capex and funding
- Net debt INR135 cr; net debt/equity 0.08x; net debt/operating EBITDA 0.26x as of March 31, 2026.
- FY26 operating cash flow negative INR77 cr as per books (vs negative INR142 cr in FY25); Q4 FY26 operating cash flow positive INR171 cr.
- INR116 cr received on April 2, 2026 from Maharashtra government effectively turned FY26 operating cash flow to positive INR39 cr.
- Cash conversion cycle 172 days (vs 177 days as of Dec 31, 2025); receivable days 155 days.
- FY27 capex plan of around INR350 crores; INR90 cr IPO proceeds to be deployed in Oswal Pumps by Q3 FY27 for automation/capacity, balance in Oswal Solar for module expansion and backward integration.
- IPO proceeds being deployed in capacity expansion, automation, backward integration and debt reduction; pre-IPO debt cost was ~8.5-9%.
The industry, as management sees it
Government is highly focused on aggressive solarization of Indian agriculture following PMO directive to urgently solarize diesel-operating farmers. Geopolitical situation is accelerating focus on distributed renewable energy as alternative to fossil fuels. PM-KUSUM 2.0 expected to be announced imminently with vendor-friendly modifications. Solar and KUSUM are expected to grow significantly — this is a transitionary phase.
Risks management named
- Geopolitical uncertainty driving raw material cost inflation — margins compressed in Q4
- H1 FY27 may see revenue decline if PM-KUSUM 2.0 is delayed beyond Q2
- Receivables elevated at 155 days — collection cycle tied to state nodal agency processes
- Competitive tender pricing pressure — input cost headwinds expected to be transitionary
- Execution challenges in new diversified segments (rooftop solar, C&I)
Q&A
Q&A was focused and substantive with analysts probing three main areas: (1) KUSUM 2.0 timing and H1 FY27 revenue risk — management provided qualitative but not quantitative H1 guidance, staying conservative; (2) margin trajectory and receivables — CFO gave detailed breakdown of the Maharashtra payment delay and receivable cycle improvement; (3) diversification execution — management acknowledged execution challenges in new segments but showed strong confidence in ₹1,000 crore non-pump revenue target. No aggressive pushback; analysts were largely seeking confirmation of strategic direction.
Asked for a number, answered without one
- Margin differential for rooftop solar vs core business: Management said first priority is execution experience, not profitability; expressed confidence in meeting overall guidance margins given backward integration, but did not quantify rooftop margin.
- Quarterly revenue run rate from non-pump segments: Management gave a rough FY27 ballpark of ~INR1,000 cr from these new verticals but declined to give a specific quarterly run rate.
- Market share target in PM-KUSUM 2.0: Management declined, saying quantum depends on how the scheme rolls out and that giving an exact figure was difficult.
- FY27 H1 specific decline percentage: Management said H1 could be similar to FY26 or see a temporary decline; declined to give a specific H1 number, citing order book visibility but conservative stance.
Every question, with its answer
1. H1 growth / KUSUM 2.0 dependency
Renu Baid, IIFL Capital Services Limited
Question. H1 FY27 decline and KUSUM 2.0 dependency: what is the expected growth/decline in H1? What percentage of 20-25% growth guidance is dependent on PM-KUSUM 2.0? Is the full-year guidance at risk if KUSUM 2.0 is further delayed?
Answer, Vivek Gupta, Chairman and Managing Director. Company is waiting for PM-KUSUM 2.0 announcement, expected imminently per Ministry signals. Currently has orders for Magel Tyala T5 tender about to be allotted. Strong order book for Q1 and Q2 as of today. Management is conservative on execution challenges in new diversified lines but order book is strong. Management believes it can at least match or exceed last year's H1 revenue from current order book, but is staying conservative given execution uncertainty in new segments.
Follow-up. Can you quantify the H1 decline?
Answer. H1 order book can easily cover last year's revenue and potentially exceed it. Management is being conservative due to execution challenges in new diversified lines — will take more aggressive call as experience builds.
Partly answered.
2. Rooftop solar margins
Renu Baid, IIFL Capital Services Limited
Question. Rooftop solar profitability: what are expected margins in rooftop projects given Oswal is new in the segment? What is the margin differential versus core solar pump business?
Answer, Vivek Gupta, Chairman and Managing Director. Oswal has full backward integration (structures, solar modules, BOS, and inverter production coming). Focus in first phase is on execution and learning operational challenges, not on profitability. May spend more initially for experience. With backward integration infrastructure and market network already in place, management is confident of achieving guided margins in the future.
Partly answered.
3. FY27 capex
Nitin Kaushik, Ascend Capital Private Limited
Question. Expected capex for FY27 and primary areas of investment?
Answer, Vivek Gupta, Chairman and Managing Director. Capex on track per IPO guidelines. Two areas: (1) Oswal Pumps parent — full IPO proceeds of ~₹90 crore for automation and capacity enhancement by Q3 FY27; (2) Oswal Solar — capacity expansion from 600 MW to 2.1 GW with backward integration (aluminium extrusion, EVA, etc.) by Q3 FY27. Total FY27 capex expected ~₹350 crore.
4. PV module profitability
Nitin Kaushik, Ascend Capital Private Limited
Question. PV module share increasing in revenue — is margin reduction due to PV modules gaining share or due to PM-KUSUM segment pressures?
Answer, Vivek Gupta, Chairman and Managing Director. Solar module expansion was originally planned to support PM-KUSUM via backward integration. Strategy now diversified to rooftop and other systems. PV module manufacturing will help in multiple areas: PM-KUSUM 2.0 when announced, and other rooftop/C&I systems. Profitability impact is due to multiple factors including geopolitical issues driving raw material prices high. Management is confident of regaining healthy profitability once market stabilizes.
5. Scheme diversification
Nitin Kaushik, Ascend Capital Private Limited
Question. If PM-KUSUM 2.0 is announced, will PV module share as percentage of revenue decline?
Answer, Vivek Gupta, Chairman and Managing Director. Company has taken a strategic call not to be dependent on one scheme. Will focus on multiple schemes so that any government scheme delay does not have major impact on overall revenue or profitability. Diversification is a permanent strategic direction.
6. Receivables and cash flow
Puneet J, Zaveri and Co.
Question. Cash flow and receivables: receivables increased despite prior guidance of improvement. What are the specific reasons? Is the issue concentrated in certain states (Maharashtra, Uttar Pradesh)?
Answer, Vivek Gupta, Chairman and Managing Director. FY25 cash flow was negative ₹152 crore; by December 2025 it was negative ₹247 crore. By Q4 end, cash flow was negative ₹70 crore. Maharashtra government payment of ~₹116 crore was received March 31 but reflected in books April 2 — without this, Q4 cash flow would have been positive ₹286 crore. Major FY26 business was with Maharashtra government and Haryana. Maharashtra delays were due to state elections and MSEDCL's engagement with a Guinness World Records project for 2-3 months, plus AIIB Bank third-party funding. Overall receivable improved from 157 days last year to 152 days this year. Standard tender cycle: 90% payment in 120 days, 10% in next 120 days, making 150-160 days routine for this business. PM-KUSUM 2.0 expected to reduce receivable cycle by 30-40 days.
Follow-up. With 19,900 current order book (~20% of last year's 87,000 pumps supplied), will current order book be exhausted in Q1? Can you maintain at least last year's H1 revenue by end of Q2?
Answer. Company is working aggressively to avoid any revenue decline in H1. Conservative side: H1 might be affected or might not be — not definite decline but possible. Even if H1 is affected, management is confident of covering it in Q3 and Q4. Team is fully engaged and aggressive. Sanjeev Sancheti added: firm order 19,912 plus pipeline of 25,000 pumps expected to convert in 3-4 months — 19,912 is largely for Q1 but pipeline covers part of Q2 as well.
7. KUSUM 2.0 realization/pricing
Karan Kamdar, Choice Institutional Equities
Question. Realizations in Magel Tyala are low — what are expectations in KUSUM 2.0? Will realizations improve going forward?
Answer, Vivek Gupta, Chairman and Managing Director. MSEDCL in Maharashtra is now on track — made very healthy payments in Q4. No major delay in MSEDCL payments expected going forward. PM-KUSUM 2.0 expected to be vendor-friendly with modifications. Government wants more solarization in India, planning schemes to be win-win. Industry expects better terms in terms of receivables and policy in PM-KUSUM 2.0. On pricing: input costs have increased; industry expects fair-value tender pricing in PM-KUSUM 2.0. However, new entrants may bid aggressively, making price outcomes uncertain.
Follow-up. Will tender prices increase in line with increased costs?
Answer. Input costs have increased, challenges are bigger, expenses increasing. Industry expectation is strong that tenders will come at fair value. However, new entrants taking aggressive calls could depress prices — not fully in company's control.
8. H1 growth clarification
Karan Kamdar, Choice Institutional Equities
Question. H1 guidance clarification: does H1 mean H1 of FY27 vs H1 of FY26, or H1 vs H2 of FY26?
Answer, Vivek Gupta, Chairman and Managing Director. H1 FY27 can be similar to or decline from FY26 levels. Annual FY27 target of minimum 20-25% growth is based on diversified business visibility. Management will provide more year-on-year visibility as the year progresses. Taking conservative stance on H1 to give realistic guidance.
Follow-up. Is the IPO capex on track? Any delays expected?
Answer. All capex is 100% on track. Minor 2-4 month delays sometimes in practical infrastructure implementation, but otherwise everything is on track.
9. Surya Ghar pipeline and margins
Prakhar Tibrewala, Choice Institutional Equities
Question. Solar panel/module Surya Ghar pipeline and margins: how much bidding pipeline in Surya Ghar? Are margins equal to, more than, or less than KUSUM pumps?
Answer, Vivek Gupta, Chairman and Managing Director. Pipeline of ~300 MW across activities team is working on with good visibility. First motto is not profitability but gaining execution experience across multiple projects. With substantial backward integration available, management is not very worried about profitability. Will reach final conclusion on which projects to prioritize after gaining practical experience in the field.
Partly answered.
10. KUSUM 2.0 timeline
Darshil Jhaveri, Crown Capital
Question. Q2 revenue impact if KUSUM 2.0 not announced until after Q1 — what is the timeline from KUSUM 2.0 announcement to order receipt and revenue start?
Answer, Vivek Gupta, Chairman and Managing Director. PM-KUSUM 2.0 expected to be announced in June 2026. Tenders called in June, award by August. LOIs expected by end of September. Internal preparation needed — on safe side, execution expected from November onwards. Q3 and Q4 will see good execution numbers. On analyst's hypothesis of further delay: PM's speech clearly prioritizes reducing diesel/petrol consumption and solarizing diesel-operating farmers. PMO has directed urgency on this. Government is more aggressive on renewable energy given geopolitical situation. Very aggressive indications received in last 6-7 days. Management very confident KUSUM 2.0 will come in a very aggressive manner.
11. Debt cost
Nitin Gandhi, Inoquest Advisors Private Limited
Question. Cost of debt that was repaid (₹311 crore from IPO proceeds)?
Answer, Vivek Gupta, Chairman and Managing Director. Debt was repaid at approximately 8.5-9% cost.
Follow-up. How much of the ₹200 crore general corporate purpose IPO proceeds was used in working capital?
Answer. Entire ₹200 crore was used in working capital.
12. Peak capacity/turnover
Nitin Gandhi, Inoquest Advisors Private Limited
Question. Peak turnover potential from current capacity expansion — when capacity is fully operational, what maximum revenue can be achieved (e.g., by FY29)?
Answer, Vivek Gupta, Chairman and Managing Director. With 2.1 GW solar module capacity and pump capacity increasing 2.25x, peak turnover of ₹6,000-6,500 crore is achievable without further capacity expansion. Management is targeting 30-40% CAGR in coming years. FY27 is challenging due to KUSUM 2.0 delay but diversified business makes growth achievable easily, possibly more than 30-40%.
Follow-up. Can you share market share percentage target in KUSUM 2.0?
Answer. Market share depends on quantum of KUSUM 2.0. Rumors suggest multiples. Exact figure is difficult to state precisely. Management is confident of achieving growth targets given infrastructure, network, and execution capability at the grassroots level.
Partly answered.
13. Margin floor risk
Nitin Gandhi, Inoquest Advisors Private Limited
Question. Risk of margins going below 22% given supply chain disruptions and price escalation — would anyone work below that given 5 months of working capital is used?
Answer, Vivek Gupta, Chairman and Managing Director. Current geopolitical situation was unexpected by anyone. If situation stabilizes, management is very sure margins will increase rather than decrease — backward integration aligned, capacity increasing, value engineering being done aggressively. External factors beyond control will impact entire industry, not just Oswal. Sanjeev Sancheti added: most of the margin impact is transitionary — may see impact for a quarter or two but not permanent.
14. Inverter manufacturing
Hardik, HPMG
Question. Entering solar inverter space — is it end-to-end production or assembly? Given cut-throat competition from Chinese players, will this drag margins?
Answer, Vivek Gupta. Inverter is part of backward integration, not a standalone sale model. Will be used within own projects — consistent with all prior backward integrations which were never made revenue models. Goal is supply chain control, quality control, and profit enhancement. End-to-end internal production expected in 6-7 months alongside current assembly. Inverters will improve quality control, data management, and R&D capability, positioning the company favorably.
Follow-up. When will inverter revenue start? What quarterly revenue run rate from PM Surya Ghar, solar panels, and inverters combined (excluding pumps)?
Answer. Ballpark: management is expecting ~₹1,000 crore business from rooftop solar, utility, and C&I segments combined in FY27. This is clear visibility. Practical experience will determine which segments to prioritize more aggressively.
What was said
Topic by topic, in the order it was spoken
FY26 Business Performance · Vivek Gupta (CMD, Oswal Pumps)
- FY26 operating income ₹2,064 cr — highest in company history, +44.3% YoY
- Q4 FY26 operating income ₹510 cr, +39.8% YoY, driven by PM-KUSUM and state government scheme execution
- Q4 operating EBITDA ₹118 cr (margin 23.2%); full-year operating EBITDA ₹514 cr (margin 24.9%)
- FY26 PAT ₹376 cr (+34.1% YoY), record high; Q4 PAT ₹93 cr (+44.8% YoY), PAT margin 17.9% for Q4 and 18.0% for full year
- Sequential Q4 margin moderation attributed to competitive tender pricing and geopolitical input cost pressures
Order Book and Market Position · Vivek Gupta (CMD, Oswal Pumps)
- Executable order book: 19,912 pumps as of May 15, 2026
- Near-term pipeline: 25,000+ pumps expected to convert to orders in next 3-4 months
- Cumulative execution: 1,06,122 solar pumping systems under PM-KUSUM and state schemes across 15 states
- Company positioned as one of the largest suppliers of turnkey solar pumping systems in India
- PM-KUSUM 2.0 expected to scale meaningfully in FY27 — major incremental opportunity
Financial Position and Cash Flows · Subodh Kumar (CFO, Oswal Pumps)
- Net debt ₹135 cr; net debt/equity 0.08x; net debt/EBITDA 0.26x — strong balance sheet
- Operating cash flow improved from negative ₹142 cr (FY25) to negative ₹77 cr (FY26)
- ₹116 cr collections received April 2, 2026 from Maharashtra government — would have made full-year OCF positive ₹39 cr
- Q4 FY26 operating cash flow positive at ₹171 cr
- Cash conversion cycle 172 days (improved from 177 days in Q3); receivables 155 days — entirely from government counterparties, fully secure
- Early signs of collection normalization observed with continuous engagement with state authorities
Diversification Strategy · Vivek Gupta (CMD, Oswal Pumps)
- Entry into rooftop solar via PM Surya Ghar Muft Bijli Yojana — first order received
- Wholly-owned subsidiary Oswal Solar Energy incorporated SPV Oswal Doon Baran Bundi Solar Projects (60% stake with Doon Infrapower) for rooftop solar HAM projects in Rajasthan
- Combined pipeline of ~300 MW across rooftop solar, utility, and C&I segments
- Strategic intent: reduce single-scheme dependency; broaden addressable market beyond government-driven solar irrigation
- Focus on exports and private network enhancement alongside government schemes
IPO Fund Utilization and Capex · Vivek Gupta (CMD, Oswal Pumps)
- ₹90 crore IPO proceeds for pump/motor capacity expansion and automation — infusion by Q3 FY27
- Solar module capacity expanding from 600 MW to 2.1 GW; backward integration including aluminium extrusion, EVA, and inverter production
- Total FY27 capex expected ~₹350 crore across parent and subsidiary
- First phase of solar module expansion (1 GW) expected by Q1 FY27; remaining 0.5 GW by Q3 FY27
- Debt repayment of ₹311 crore from IPO proceeds at ~8.5-9% cost; ₹200 crore general corporate purpose fully deployed in working capital
FY27 Guidance and Outlook · Subodh Kumar (CFO, Oswal Pumps)
- FY27 revenue growth guidance: 20-25% YoY — distinctly back-ended profile
- H1 FY27 expected to see moderate temporary revenue decline due to timing of project awards; execution momentum building from H2
- FY27 operating EBITDA margin guidance: 22-23% (vs 24.9% in FY26) — impact of elevated input costs and competitive pricing expected to be transitionary
- FY27 PAT margin guidance: 15-16% — broadly in line with operating margin trajectory
- Medium-term growth target: 30-40% as PM-KUSUM 2.0 and diversified segments scale
- Margin improvement expected beyond FY27 as operating leverage strengthens and market conditions normalize
In their words
We are going to cover it very effectively in Q3 and Q4. We are very sure about that. So, we are thinking a bit conservatively here, but we are working very hard, our team is fully engaged and aggressive on how to avoid a decline in revenue.
The company has taken a strategic call that the company will no longer be dependent on one scheme. So the company is focusing on multiple schemes and will move forward with that same agenda and focus so that if any government scheme is delayed for any reason, it doesn't have a major impact on our overall revenue or overall profitability.
Most of it is transitionary, so you may see impact for a quarter or two, but I don't think some of these are really permanent. Most of these are transitionary.
To check next time
What management committed to on this call, or the dates they gave.
- Announcement and detailed guidelines of PM-KUSUM 2.0, expected around June 2026.
- Actual H1 FY27 revenue trajectory versus FY26 base to gauge whether back-ended guidance holds.
- Completion timeline of INR350 cr FY27 capex, particularly 1 GW solar module capacity by Q1 FY27.
- Further reduction in receivable days (currently 155) and cash conversion cycle (currently 172 days).
- Progress on rooftop/utility/C&I pipeline conversion; first revenue from Oswal Doon Baran Bundi SPV.
- Progress on solar inverter internal production and start of assembly/production.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 18 May 2026 | ₹370.70 | −3.73% | +0.03% |
| 5 sessions Fri 22 May 2026 | ₹358.30 | −6.95% | +0.32% |
| 20 sessions Mon 15 Jun 2026 | ₹422.55 | +9.74% | +0.89% |
From the close of Fri 15 May 2026, ₹385.05: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.