H1 FY27 revenue rose 33% to INR1,639 crores as copper scaled; lead's FY27 volume guidance no longer held amid supply constraints.

Management's tone
Mixed
What was said
Mixed
Guidance
Guidance withdrawn
Analyst pushback
High
Stock, next session
−2.59% (Nifty 50 +0.58%)
  • H1 FY27 revenue rose 33% to INR1,639 crores and PAT was INR55.6 crores; operating cash flow turned positive while POCL remained net cash and debt-free.
  • Copper's INR200 crores cathode project, fully internally funded, spent INR60 crores; 18,000 metric tons per annum Phase I targets December 2026 commissioning.
  • Copper revenue grew about 4.5x to 47% of H1 revenue; production and sales more than tripled YoY, with EBITDA per ton at INR44,536, up 30%.
  • Lead H1 EBITDA per ton was INR18,617; Q2 was close to INR16,000 versus INR21,000 in Q1 as value-added mix fell and power, fuel and logistics costs rose.
  • FY27 lead volume guidance no longer held; management expected Q4 recovery and guided FY28 to at least 25,000 metric tons per quarter.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q2 FY27

This quarterA year agoLast quarterMargin
Revenue₹708 cr+10.6%−24.2%
EBITDA (excl. other income)₹31.9 cr−40.5%−42.9%4.5% (8.4% a year ago)
Net profit₹19.7 cr——2.8% (0% a year ago)
EPS (₹)₹2.58−77.6%−45.1%

From the company's filed results for the quarter ended 30 Sept 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • H1 revenue growth of 33% to INR1,639 crores was driven mainly by copper scale-up: copper revenue grew about 4.5x and contributed 47% of the top line.
  • Lead margins were pressured by supply disruption, lower volumes, elevated logistics and input costs, with COGS increasing faster than revenue.
  • Lead's value-added mix fell from about 85% in Q1 to 60%-65% in Q2; power, fuel, logistics and flux costs drove Q2 EBITDA per ton to close to INR16,000.
  • The prior quarter's higher copper recycling EBITDA per ton was a one-off market squeeze that lifted realizations; current guidance returned to INR35,000-INR40,000.
  • Copper volumes can shift between quarters because scrap moves through multiple processes and partially processed material can finish faster in one quarter; management expects less unevenness after cathode and melting start.

The numbers management led with

  • Copper cathode project investment and capacity: ₹200 crore total investment for 36,000 MTPA copper cathode capacity, funded from internal accruals
  • Copper cathode capex phasing: ₹60 crore spent to date; about ₹140 crore for Phase I over 2-3 months and ₹60 crore for Phase II in FY28
  • Copper cathode commissioning schedule: Phase I: 18,000 MTPA by December 2026 with Q4 FY27 trials; Phase II: 18,000 MTPA by Q3 FY28
  • FY28 lead volume target: At least 25,000 MT per quarter, or more than 100,000 MT annually

Guidance

Guidance on this call

WhatForWhat management said
Lead volume run-rateFY28Management targets at least 25,000 metric tons per quarter in FY28, or more than 1 lakh tons annually, after a Q4 FY27 turnaround.
Copper cathode capacityFY27-FY28The 36,000 tons per annum project has 18,000 metric tons per annum Phase I targeted for December 2026 and 18,000 Phase II targeted for Q3 FY28.
Copper value-added volumeFY28FY28 value-added copper volume is approximately 16,000-17,000 tons, with total copper volume in excess of 20,000 tons.
Copper cathode EBITDA per tonFY28Copper cathode EBITDA per ton is guided at about INR65,000.
Copper recycling EBITDA per ton—Copper recycling EBITDA per ton is guided at INR35,000-INR40,000 going forward.
Lead EBITDA per tonQ4 FY27Lead EBITDA per ton is expected at INR18,000-INR20,000 in Q4 FY27 as volumes improve.
Copper cathode project capexFY27-FY28Approximately INR200 crores total: about INR140 crores for Phase I over the next two to three months and INR60 crores for Phase II next FY.
Revenue and profitability CAGRFY26-FY30The 2030 roadmap targets 20% plus CAGR in revenue and profitability.
EBITDA marginFY26-FY30EBITDA margin is targeted at over 8% by 2030.
Volume growthFY26-FY30Volume growth is targeted at over 15% in the 2030 ramp-up roadmap.
ROCEFY26-FY30ROCE is targeted at exceeding 20% by 2030.
Revenue from value-added productsFY26-FY30Value-added products are targeted to contribute over 60% of revenue by 2030.
Copper recycling capacity utilizationFY27Incremental copper recycling capacity is expected to run at approximately 90% utilization during FY27.
Copper sales volumeFY27Copper sales volume is targeted at about 10,000 tons in FY27.
Lead capacity utilization—Lead capacity utilization is expected to ramp up to 70% in the coming quarters from 40% in H1 FY27.

What changed since the Wed 5 Aug 2026 call

WhatOn the Wed 5 Aug 2026 callOn this call
FY27 lead volume (not repeated)Lead volume guidance of 1.25-1.3 lakh tons for FY27 (maintained).Management said the FY27 guidance did not hold and could not commit exactly to 75,000 tons.
FY28 lead volume run-rate (new)No comparable FY28 quarterly lead-volume target was stated on the previous call.Management guided about 25,000 metric tons per quarter for FY28.
FY27 lead value-added mix (restated)Lead value-added mix was targeted at 65%-70% of annual segment revenue for FY27.H1 mix was 65% of segment revenue; Q2 was about 60%-65%.
Lead EBITDA per ton (held)Sustainable lead EBITDA was guided at INR18,000-INR20,000 per ton, with INR19,000-INR21,000 at high value-added mix.Q4 FY27 was again expected at INR18,000-INR20,000 per ton; H1 was INR18,617.
Copper recycling EBITDA per ton (cut)Recycling EBITDA guidance had been raised to above INR40,000 per ton for FY27 onwards.Management reiterated INR35,000-INR40,000 per ton going forward.
FY28 copper cathode volume (cut)FY28 copper cathode volume was targeted at over 30,000 tons.Management cited 16,000-17,000 tons of value-added product and total copper in excess of 20,000 tons.
FY27 capex framing (restated)FY27 capex was INR175 crores: INR140-150 crores growth capex and INR20-25 crores maintenance.The copper project was described as about INR200 crores total, with INR140 crores for Phase I and INR60 crores for Phase II.
2030 value-added revenue mix (new)No over-60% value-added revenue target was stated in the previous-call guidance.Management targeted over 60% of revenue from value-added products by 2030.

Guided on earlier calls, and what was filed

WhatForGuidedFiled
FY26 revenue growth (standalone and consolidated)FY2630–35% (on the Q4 FY25 call)43.8%, above the range
FY26 blended EBITDA marginFY26at least 6% (on the Q4 FY25 call)7.1%, within the range
FY26 blended EBITDA marginFY26at least 7% (on the Q1 FY26 call)7.1%, within the range
EBITDA margin sustainable at 8%+FY26at least 8% (on the Q2 FY26 call)7.1%, below the range
Consolidated EBITDA margin bandFY267–8% (on the Q3 FY26 call)7.1%, within the range

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Copper

Copper scaled rapidly in H1 FY27: revenue grew about 4.5x, production and sales more than tripled, and the 36,000 tons per annum cathode project advanced; 60%-70% internal scrap is expected to feed it.

H1 revenue growth about 4.5x · H1 revenue contribution 47% · H1 production 5,649 metric tons · H1 sales 6,040 metric tons · H1 EBITDA per ton INR44,536 · H1 EBITDA per ton growth 30% · FY27 expected revenue contribution approximately 45% · Incremental recycling capacity 6,000 metric tons per annum · Expected FY27 recycling utilization approximately 90% · Total project investment approximately INR200 crores · Project outlay incurred approximately INR60 crores · Phase I capacity 18,000 metric tons per annum · Phase II capacity 18,000 metric tons per annum · Expected cathode feed from internally generated recycled material 60%-70% · Expected domestic share of cathode raw-material sourcing approximately 20% · Expected imported share of cathode raw-material sourcing approximately 80%

Outlook: Phase I of 18,000 metric tons per annum targets December 2026 commissioning; Phase II targets Q3 FY28. Recycling should reach about 90% utilization in FY27, and copper should contribute about 45% of revenue.

Lead

Lead volumes moderated amid West Asia supply disruption; H1 EBITDA per ton was INR18,617, but Q2 value-added mix and elevated logistics and input costs pressured profitability.

Expanded capacity 72,000 metric tons per annum · H1 capacity utilization 40% · H1 volume 30,000+ tons · H1 value-added contribution 65% of segment revenue · Q1 value-added mix about 85% · Q2 value-added mix 60%-65% · H1 EBITDA per ton INR18,617 · Q1 EBITDA per ton INR21,000 · Q2 EBITDA per ton close to INR16,000 · Expected capacity utilization 70% in coming quarters · FY28 quarterly lead volume minimum 25,000 metric tons · FY28 annual lead volume in excess of 1 lakh tons

Outlook: Utilization should ramp from 40% in H1 FY27 to 70% in coming quarters. Q4 FY27 should show volume recovery and INR18,000-INR20,000 EBITDA per ton; FY28 run rate is 25,000 metric tons per quarter.

Balance sheet, capex and funding

  • Cash flow from operations turned positive during H1 FY27.
  • POCL remained at a net cash, debt-free position.
  • The copper cathode project was approximately INR200 crores and fully funded through internal accruals.
  • About INR60 crores of the copper project outlay had already been incurred.
  • Phase I spending was expected to be close to INR140 crores over the next two to three months; INR60 crores was earmarked for Phase II next FY.
  • Trade receivables were INR144 crores versus INR265 crores, which management said was a decrease.

The industry, as management sees it

Management sees lead supply-chain disruptions gradually easing, although shipping and input costs remain elevated and customer contracts are still being repriced. For copper, it expects India's significant demand-supply gap to persist over the next two to three years despite capacity additions by POCL and other recycling players.

Risks management named

  • West Asia-linked geopolitical disruption continues to delay raw-material shipments and constrain lead volumes
  • Elevated shipping, power, fuel, flux and input costs may not be recovered immediately from customers
  • FY27 lead sales may fall materially below the earlier 120,000-130,000 tonne target
  • Copper cathode feed remains predominantly import-dependent despite advance supply tie-ups
  • Lead value-added output depends on customer requirements and quarterly contract mix

Q&A

Lead procurement, volumes and EBITDA dominated the Q&A, with repeated challenges over whether POCL underperformed peers and whether higher input and shipping costs can be passed through. Copper was the more constructive area: management defended the demand case, quantified FY27 and FY28 volumes and tied up cathode feedstock. Pushback was highest on peer comparisons and an analyst's share-sale claim, while the exact FY27 lead-volume commitment remained non-committal.

Not answered directly

  • Cathode project EBIT-margin percentage
  • Exact FY27 lead sales volume
  • Management share-sale transaction details

Asked for a number, answered without one

  • FY27 lead sales volume: Management said it could not commit exactly, but could be closer and could probably try to reach that number; the prior FY27 volume guidance no longer held.
  • Copper cathode EBIT margin: Management said it was not guiding on percentage and reiterated absolute EBITDA of about INR65,000 per ton for cathode and INR35,000-INR40,000 for recycling.
  • Lead capacity utilization: CFO said H1 volume was 30,000+ tons and FY28 run rate 25,000 tons per quarter, but did not provide utilization percentages.
  • Trade receivable credit period: Management confirmed receivables fell to INR144 crores from INR265 crores, but did not state the normal credit period.
  • Copper expansion returns: Management did not quantify returns and said it did not see a significant margin risk because sourcing and sales were well covered.

Every question, with its answer

  1. 1. Lead procurement volumes

    Dheeraj Ram, 360 ONE Capital

    Question. As POCL ramps lead capacity utilization, what procurement and sales volumes are targeted for FY27, and is a recovery expected before Q4 FY27?

    Answer, Ashish Bansal, Chairman and Managing Director. Procurement has shifted toward South America, Southeast Asia and domestic sources. Ashish Bansal said POCL is looking at a minimum of 25,000 metric tons of lead procurement per quarter in the next financial year and expects a Q4 FY27 turnaround in lead volumes.

    Follow-up. Why did copper volumes decline sequentially and does copper EBITDA/kg guidance need revision; could volumes remain volatile through Q1/Q3?

    Answer. Copper EBITDA/kg remains within guided levels and volumes should increase in the current quarter. Process overlap can create quarter-to-quarter variability until the cathode and melting facilities start, so some Q3/Q4 volatility may persist even at available capacity.

  2. 2. Lead mix and margins

    Sagar Shah, Spark

    Question. What drove the sequential fall in lead value-added mix and EBITDA per tonne, and when will the 25,000 tonne-per-quarter volume target be achieved?

    Answer, Vijay Balakrishnan, Chief Financial Officer. Vijay Balakrishnan said Q1 value-added mix was about 85%, versus 60%-65% in Q2. Power, fuel, logistics and fluxes reduced EBITDA by about ₹2.5/kg. With volumes recovering, management expects ₹18,000-₹20,000 per tonne from Q4; Q4 should show an increment, while 25,000 metric tons per quarter is the FY28 target.

    Follow-up. How much Andhra output will feed the cathode project, and what EBIT margin should investors expect for cathodes versus recycling?

    Answer. About 60% of Andhra output will feed cathodes and 40% will remain saleable product. Management declined to guide an EBIT-margin percentage, retaining absolute EBITDA guidance of about ₹65,000/tonne for cathodes and ₹35,000-₹40,000/tonne for recycling.

    Not answered directly.

  3. 3. Overseas procurement infrastructure

    Yash Sonthalia, Edelweiss Public

    Question. Does POCL plan to establish warehouses or collection points outside India for raw-material procurement, and when could such a model become financially viable?

    Answer, Ashish Bansal, Chairman and Managing Director. Management said an overseas collection point for a single metal would not make financial sense because of aggregation, shipping, inventory and route-risk costs. POCL instead prefers exclusive tie-ups with larger overseas yards and is strengthening domestic supply chains; management declined to comment on peers' warehouse strategies.

    Follow-up. Could a warehouse become viable over a longer horizon, particularly if peers are adopting similar models?

    Answer. Management reiterated that selecting only one metal from mixed scrap collections would disrupt supply and increase shipping and holding costs. It prefers capital-light yard relationships that do not spread the company across multiple vulnerable locations.

  4. 4. Lead peer comparison and volumes

    Shashank Kanodia, ICICI Securities

    Question. Peers reported weaker lead volumes and EBITDA than POCL; what specifically hurt POCL's procurement and performance, and are FY27/FY28 lead and copper volume targets achievable?

    Answer, Ashish Bansal, Chairman and Managing Director. Ashish rejected the premise that POCL alone was muted, said the industry had also reported lower volumes, and asked the analyst to recheck peer EBITDA. He attributed part of peer growth to acquisitions rather than organic expansion, while attributing POCL's weakness to international supply disruption and location-specific procurement decisions being realigned.

    Follow-up. Can FY27 lead sales reach 75,000 tonnes, and what are the FY27 copper, FY28 copper and cathode EBITDA targets?

    Answer. Management could not commit to 75,000 tonnes of FY27 lead sales but said it could be closer. It confirmed FY28 lead volumes of 100,000+ tonnes, FY27 copper around 10,000 tonnes, FY28 copper above 20,000 tonnes, and cathode EBITDA above ₹50,000/tonne.

    Not answered directly.

  5. 5. Lead supply chain and cost pass-through

    Digant Haria, GreenEdge Wealth

    Question. Is the lead-volume problem primarily a supply-chain and shipping-cost issue, or does it threaten the underlying business model if freight costs remain elevated?

    Answer, Ashish Bansal, Chairman and Managing Director. Management said shipping cost is embedded in raw-material cost and can make volumes non-viable, but availability need not disappear if costs are passed through. Contracts are being renegotiated with flexible or variable terms; customers have shown willingness to reprice, with second rounds due before January and February renewals.

    Follow-up. What determines lead value-added mix, how are customer negotiations progressing, and has copper hedging or weaker copper EBITDA changed guidance?

    Answer. Value-add mix is driven by customer and contract requirements despite ample plant capability. International cost negotiations have begun. Copper hedging generated no loss; recycling EBITDA guidance remains ₹35,000-₹40,000/tonne and cathode about ₹65,000/tonne. Prior ₹45,000-₹48,000/tonne copper recycling outcomes were attributed to a one-off market squeeze.

  6. 6. Lead volume scenario and copper feedstock

    Vinit Mehta, Ashika Group

    Question. Does the 25,000 tonne-per-quarter FY28 lead plan assume a status quo or worst-case West Asia scenario, and how much external scrap will the Phase I cathode facility require?

    Answer, Ashish Bansal, Chairman and Managing Director. Management said the FY28 lead plan assumes West Asia conditions remain at status quo and described this as the worst-case scenario. It expects Q3 sourcing to be somewhat better than Q2 and a full turnaround from Q4 FY27.

    Follow-up. How much cathode feedstock will come from internal recycling versus external procurement, and what FY28 value-add volumes are projected?

    Answer. Phase I needs roughly 19,000-20,000 MT of scrap: about 6,000 MT from internal generation and 13,000-13,500 MT externally procured, with material already arriving for trials. FY28 value-add cathode volume is targeted at 16,000-17,000 MT and total copper volume above 20,000 MT.

  7. 7. Management share sale

    Shubham, 3A Financial Services

    Question. Did management sell approximately ₹200 crore of shares to ICICI or in the open market in June 2026?

    Answer, Ashish Bansal, Chairman and Managing Director. Ashish Bansal denied that management sold shares worth ₹200 crore, said the analyst should email the query, and called the detail non-disclosable.

    Follow-up. What is the margin differential between value-added and commodity lead, and has sourcing improved in Q3?

    Answer. The average value-added lead margin differential is 0.75%-1.25%, sometimes reaching 1.5%-1.75%. Q3 sourcing looks better than Q2, with full turnaround expected in Q4; domestic material is slightly more expensive than international sourcing.

    Not answered directly.

  8. 8. Receivables and lead capacity utilization

    Gaurav Shukla, Finvestors Research

    Question. Did trade receivables increase from roughly ₹144 crore to ₹265 crore, and what is current utilization of the 204,000 MTPA lead capacity?

    Answer, Vijay Balakrishnan, Chief Financial Officer. Vijay Balakrishnan corrected the premise: receivables fell from about ₹265 crore to ₹144 crore, versus above ₹200 crore a year earlier. H1 lead volume was 30,000+ MT; FY28 is targeted at 25,000 MT per quarter, or above 100,000 MT annually.

    Follow-up. What was copper-recycling utilization and actual H1 production, and how does the FY28 copper volume split between recycling and value-add products?

    Answer. Copper recycling ran at 100% in H1, using 6,000 MT against 12,000 MT annual capacity. Management confirmed FY28 copper above 20,000 MT, including 16,000-17,000 MT of value-add products, with 3,000-4,000 MT from recycling.

  9. 9. Lead EBITDA decline

    Naysar Parikh, Native Invest

    Question. Why has POCL's lead EBITDA per tonne fallen significantly against its own prior periods and competitors despite higher realizations?

    Answer, Ashish Bansal, Chairman and Managing Director. Ashish said H1 EBITDA was about ₹18,000/tonne, Q2 close to ₹16,000/tonne and Q1 about ₹21,000/tonne. He attributed Q2 to higher fuel, flux, shipping and other costs, maintained the ₹18,000/tonne guide, and denied pressure to sell at lower prices or margins.

    Follow-up. Will the cost pressure continue in Q3 FY27, and when should the lead-margin trajectory improve?

    Answer. Management said Q3 would still carry some pressure but POCL had begun renegotiating customer contracts and introducing variable clauses. The full turnaround was expected from Q4 FY27.

    Partly answered.

  10. 10. Copper demand and competition

    Pawan Kumar, Global Consilient Research

    Question. What is driving copper-recycling expansion across the industry, can Indian demand absorb the capacity, and does management see medium-term margin or competition risk?

    Answer, Ashish Bansal, Chairman and Managing Director. Ashish attributed expansion to a significant Indian copper demand-supply gap, with imports and international players meeting the shortfall. He expects demand to rise over the next two to three years and remain robust despite expansion by POCL and peers, with no significant margin risk because sourcing and sales are well covered.

    Follow-up. Does the lithium-ion battery black-mass export ban create an opportunity, and does POCL plan to invest in lithium-ion battery recycling?

    Answer. Management said the black-mass ban currently has no POCL impact and that the company remains outside lithium-ion battery recycling because volumes do not justify investment. Technology uncertainty, including alternative sodium-ion chemistries, adds to the limited near-term feasibility.

  11. 11. EU scrap ban and import exposure

    Jigar Jani, Individual Investor

    Question. What is POCL's exposure to the proposed EU scrap-export ban, and what percentage of copper and lead raw materials is currently imported from Europe?

    Answer, Ashish Bansal, Chairman and Managing Director. Management said the debated ban mainly concerns aluminium and country-specific import negotiations, with no specific copper or lead rule confirmed. It estimated European copper imports at only about 5%-8%, but did not separately quantify lead imports.

    Follow-up. Which regions now supply lead and copper, is the FY28 cathode-feed requirement secured, and how will domestic versus imported sourcing evolve?

    Answer. Sourcing spans the UK, US, South America, Australia/New Zealand, Southeast Asia and domestic India; Middle East has fallen to 5%-8%. FY28 cathode volume of 16,000-17,000 MT was accepted. Feed remains 80% imported, with domestic supply targeted at 20% over one to two years; supply is tied up and hedging remains in place.

    Partly answered.

  12. 12. Lead realization versus profitability

    Abhijit Mitra, Aionios Alpha Investment Management

    Question. Why did lead EBITDA per tonne decline despite high realizations and a high value-add product mix, and is the issue primarily sourcing-mix inflation?

    Answer, Vijay Balakrishnan, Chief Financial Officer. The CFO said average realization was about ₹260/kg and POCL sells diverse alloys, but power, fuel, fluxes and other costs had inflated. The value-added mix fell from about 85% to 65%, and H1 EBITDA was about ₹18,000/tonne, explaining lower profitability despite high realizations.

    Follow-up. Does a higher realization necessarily imply higher EBITDA, where do fluxes sit in the margin structure, and will pass-through occur in phases?

    Answer. Higher realization does not necessarily imply higher EBITDA because input costs also rise with premium products. Fluxes sit in gross margin, and management confirmed that cost pass-through negotiations will proceed in phases.

  13. 13. LME registration and hedging

    Sagar Shah, Spark

    Question. If LME brand registration takes at least 12 months, can POCL hedge cathode deliveries during the first year of operations?

    Answer, Ashish Bansal, Chairman and Managing Director. Ashish said hedging and LME brand registration are separate: anyone can hedge, while registration enables delivery against LME warrants. POCL already fully hedges recycled copper and will hedge cathode output from launch, so the registration timetable does not create a first-year hedging gap.

    Follow-up. What additional benefit does LME registration provide, and will the registration delay affect cathode sales volumes?

    Answer. LME registration adds deliverability, liquidity and customer reassurance about product quality, but is not required for direct OEM or end-user sales. Management noted that POCL registered as an LME lead brand in 2019 after already selling for 14 years.

  14. 14. Copper project capex and execution

    Harsh Maru, Vinamra Capital

    Question. How will the roughly ₹160 crore H2 capex outlay be deployed across the cathode project, and are there equipment-delivery or supply-chain execution risks?

    Answer, Ashish Bansal, Chairman and Managing Director. About ₹60 crore had been spent. Phase I spending will reach about ₹140 crore over the next two to three months; the balance ₹60 crore is Phase II in FY28. Management saw no equipment delays: most imported equipment had shipped, domestic equipment was progressing, and installation starts in the first week of December.

    Follow-up. Has POCL changed its sourcing strategy or entered long-term contracts in response to current supply-chain conditions?

    Answer. Management said sourcing locations and shipping routes have changed and that POCL has tied up exclusively with selected yards rather than building its own overseas collection facilities. Those arrangements were already in place.

  15. 15. Lead guidance reset and product mix

    Yash Joglekar, Aranca

    Question. Why did lead value-added mix decline, did customers previously sourcing pure lead return, and is FY27 lead-sales guidance of 120,000-130,000 tonnes still valid?

    Answer, Ashish Bansal, Chairman and Managing Director. Customers did not return for value-added alloys; in Q2 they required higher pure-lead volumes, reducing value-added mix. Management explicitly said the earlier FY27 lead-sales guidance of 120,000-130,000 tonnes did not hold after supply-chain deterioration. The long-term target of over 15% volume growth remains intact.

    Follow-up. Do the long-term volume-growth and profitability targets remain intact despite the FY27 reset?

    Answer. Management confirmed that the long-term targets and plans remain intact and described them as robust, while maintaining that FY28 volumes would recover materially.

  16. 16. BESS-linked copper products

    Rahul Majethia, Individual Investor

    Question. Can POCL use its expanded copper capacity and value-added products to enter the BESS supply chain, and would it earn a premium conversion spread?

    Answer, Ashish Bansal, Chairman and Managing Director. Ashish said copper naturally links to energy storage and POCL is evaluating niche, higher-margin products for BESS, with a couple of products under development. He said these products should command much higher conversion spreads than standard LME cathode spreads.

    Follow-up. Are international lead-alloy export orders structurally shifting from lead-acid batteries to lithium-ion BESS?

    Answer. Management saw no material international shift yet and said Korean and Japanese battery makers indicated that no such shift is expected during the coming year.

What was said

Topic by topic, in the order it was spoken

H1 FY27 Performance and Balance Sheet · Ashish Bansal (Chairman and Managing Director)

  • H1 FY27 revenue increased 33% YoY to ₹1,639 crore, primarily because the copper business scaled by about 4.5x.
  • Copper contributed approximately 47% of H1 revenue, demonstrating the company's transition toward a more copper-weighted portfolio.
  • PAT for H1 was ₹55.6 crore despite supply-chain disruption and elevated input costs.
  • Cash flow from operations turned positive, while the company maintained a net cash and debt-free position.

Supply-Chain Disruption and Sourcing · Ashish Bansal (Chairman and Managing Director)

  • Geopolitical developments in West Asia disrupted shipping routes, raw-material availability and shipment schedules across the industry.
  • Management was seeing gradual easing of supply-chain disruption while strengthening alternative sourcing geographies and procurement channels.
  • The operating priorities remained maximizing raw-material value, improving product mix and scaling manufacturing capabilities.

Copper Cathode Expansion Project · Ashish Bansal (Chairman and Managing Director)

  • POCL is establishing 36,000 MTPA of LME-grade copper cathode capacity at Thervoy Kandigai for about ₹200 crore, fully funded through internal accruals.
  • About ₹60 crore had already been spent, with major equipment deliveries and construction activity underway.
  • Phase I of 18,000 MTPA is targeted for commissioning in December 2026 and trial runs in Q4 FY27; Phase II is targeted for Q3 FY28.
  • The facility will use pyro-refining and electro-refining, with 60%-70% of feed expected from internally generated recycled copper.

Lead Capacity and Operating Performance · Ashish Bansal (Chairman and Managing Director)

  • The incremental 6,000 MTPA copper-recycling capacity commissioned in Q4 FY26 was ramping toward approximately 90% utilization during FY27.
  • The expanded 72,000 MTPA lead capacity at Thervoy Kandigai operated at 40% utilization in H1 FY27 and was expected to reach 70% in coming quarters.
  • Lead production and sales were constrained by supply disruption, but lead EBITDA per tonne remained ₹18,617 in H1 FY27.
  • Value-added products represented 65% of lead-segment revenue as the company prioritized higher-margin products.

Copper Performance and Revenue Mix · Ashish Bansal (Chairman and Managing Director)

  • Copper production and sales increased more than threefold to 5,649 MT and 6,040 MT in H1 FY27.
  • Copper EBITDA per tonne reached ₹44,536, up 30% YoY, supported by the ramp-up of added recycling capacity.
  • Copper contributed 47% of H1 revenue and was expected to represent approximately 45% of FY27 revenue.
  • Domestic and export markets contributed 54% and 46% of revenue; exports represented 55% of lead and 39% of copper.

Margin Pressure and 2030 Roadmap · Ashish Bansal (Chairman and Managing Director)

  • Lead profitability remained under pressure as COGS, logistics and input costs rose faster than revenue and lead volumes were lower.
  • Management expected a stronger growth trajectory as supply constraints eased and raw-material availability improved.
  • The 2030 roadmap targets over 15% volume growth, more than 20% revenue and profitability CAGR, EBITDA margin above 8% and ROCE above 20%.
  • Over 60% of revenue from value-added products is targeted, supported by lead and copper expansion, forward integration and operational excellence.

In their words

You are right, we did give that guidance earlier, but the situation drastically eroded, and there were a lot of changes in terms of supply chain and everything, which we explained some back. Definitely, that guidance does not hold intact for this financial year.
Ashish Bansal (Chairman and Managing Director)
We have already tied up for much in excess of the quantity required for our raw material for the copper cathode plant.
Ashish Bansal (Chairman and Managing Director)
Even after the expansion of us or few other players who might be increasing their capacity in copper, there will still significantly be a gap, and the demand will still remain robust on copper side.
Ashish Bansal (Chairman and Managing Director)

To check next time

What management committed to on this call, or the dates they gave.

  • Q4 FY27 lead volume should recover after Q3 sourcing was described as slightly better than Q2.
  • Q4 FY27 lead EBITDA per ton should return to INR18,000-INR20,000 as volumes and cost pass-through improve.
  • Copper cathode Phase I of 18,000 metric tons per annum should commission in December 2026 and run trials in Q4 FY27.
  • The remaining 18,000 metric tons per annum of copper cathode Phase II should be commissioned by Q3 FY28.
  • Phase I copper capex should reach about INR140 crores over the next two to three months, with equipment installation from early December.
  • FY28 copper volume should exceed 20,000 tons, including 16,000-17,000 tons of value-added product.

Transcript

Read along with the recording

The whole call, 261 lines from 8 speakers over 1:06:17. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.

Sign up freeLog in

The stock after the call

After the callCloseStockNifty 50
Next session Mon 16 Nov 2026₹368.70−2.59%+0.58%

From the close of Fri 13 Nov 2026, ₹378.50: the call began at 15:30 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.

Pondy Oxides & Chem's other calls

  • Q1 FY27Wed 5 Aug 2026Tone: Mixed
  • Q4 FY26Wed 27 May 2026Tone: Confident
  • Q3 FY26Thu 29 Jan 2026Tone: Confident
  • Q2 FY26Fri 17 Oct 2025Tone: Confident
  • Q1 FY26Fri 25 Jul 2025Tone: Confident
  • Q4 FY25Mon 19 May 2025Tone: Confident
  • Q3 FY25Mon 27 Jan 2025Tone: Mixed