Scoda Tubes Q4 FY26 earnings call

Thu 28 May 2026SCODATUBES

In brief

Scoda Tubes guides 25% FY27 revenue growth and 14-15% EBITDA margins; welded plant due H2 FY27 after March gas disruption hit Q4.

Management's tone
Cautious
What was said
Even-handed
Guidance
First guidance issued
Analyst pushback
Medium
Stock, next session
−2.91% (Nifty 50 −1.50%)
  • FY26 revenue rose 7% YoY to ₹518.7 cr while PAT grew 22% to ₹38.8 cr, with PAT margin up 100 bps at 7.5%.
  • Management guides FY27 revenue growth of 25% with EBITDA margins of 14% to 15%, calling it 'conservative'.
  • Q4 FY26 was hit by a 15-17 day gas shutdown in March, cutting production volumes by 40% and trimming revenue to ₹123.6 cr.
  • New 8,000 MT welded facility is targeted for H2 FY27 at a ₹40 cr investment, with optimum utilization seen by FY29.
  • Order book stands at ₹175 cr for 3-4 month execution; BHEL tender now expected in July or August.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q4 FY26

This quarterA year agoLast quarterMargin
Revenue₹124 cr−0.1%−18.9%
EBITDA (excl. other income)₹16.7 cr−4.1%−27.4%13.5% (14.1% a year ago)
Net profit₹6.3 cr−7.4%−44.9%5.1% (5.5% a year ago)
EPS (₹)₹1.02−32.5%−46.6%

From the company's filed results for the quarter ended 31 Mar 2026 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • March gas disruption shut the piercing plant for 15-17 days, cutting Q4 production volumes by 40%; management said Q4 revenue could have been ~₹140 cr otherwise. (one-off)
  • EBITDA margin dipped to 13.5% in Q4 (FY25: 14.1%) and 14.7% in FY26 (FY25: 16.1%) on under-absorbed fixed costs from new capacity commissioning.
  • Stainless steel base material prices rose 25-30% on war-related scrap import inflation; cost pressure is passed through to customers with a lag.
  • Finance cost rose on borrowings for capex, solar project funding and higher working capital utilization, plus interest on delayed tax payments.

The numbers management led with

  • IPO proceeds raised: ₹220 crores
  • FY26 capex incurred: ₹110 crores
  • FY27 expected capex: ~₹100 crores (additional to FY26's ₹110 cr)
  • Welded capacity expansion investment: ₹40 crores for 8,000 MT additional welded capacity (internal accruals + term loans)
  • Solar power project capacity: 8.79 MW DC (4.99 MW seamless + 3.8 MW welded); estimated annual savings of ₹8.63 crores / 137 lakh KWH
  • Order book: ₹175 crores (3-4 months visibility)

Guidance

Guidance on this call

WhatForWhat management said
Consolidated revenue growthFY27we are expecting a 25% revenue growth with 14% to 15% EBITDA margins
EBITDA marginsFY2714% to 15% EBITDA margins
Domestic revenue growthFY2720% for domestic
Export revenue growthFY2725% for export
CapexFY27Almost INR100 CR addition would be there for the current FY27
Peak debtFY27Next year, it will increase by INR50 crores, so assuming INR250 crores
Inventory daysFY27the inventory days will go down in FY27 and it will remain in the range of 160 to 170 days for the future years
Seamless capacity utilizationFY27For FY27, for seamless we will be operating at almost 70% of the utilization
Welded capacity utilizationFY27for welded we will be doing I think this year would be around 25% out of the installed capacity
Mother hollow captive consumptionFY28intending to be fully captive by FY28
Solar electricity cost savingFY27estimated electricity cost saving of INR8.63 crores per year

Guided on earlier calls, and what was filed

WhatForGuidedFiled
EBITDA marginFY2615–16% (on the Q4 FY25 call)14.7%, below the range (standalone)

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

The business

By business

Seamless tubes

Capacity at 20,000 MTPA in FY26; FY27 utilization guided at ~70% with optimum by FY28. Q4 hit by gas shutdown; raw material inflation passed to customers.

Capacity 20,000 MTPA · FY27 utilization ~70% · Optimum utilization by FY28 · FY26 export share 34.6%

Outlook: Optimum utilization by FY28; raw material inflation passed through with a lag.

Welded tubes

New 8,000 MT line targeted H2 FY27 (₹40 cr capex); opens data center, water treatment, HVAC and construction end-uses.

Capacity addition 8,000 MT · Capex ₹40 cr · Trial runs by Q2 FY27 · FY27 utilization ~25%

Outlook: Production from H2 FY27; optimum contribution by FY29.

Mother hollow

70% captive consumption in FY26, supporting backward integration for seamless tubes; intended to be fully captive by FY28.

Captive consumption 70% · Target 100% captive by FY28

Outlook: Fully captive by FY28.

Balance sheet, capex and funding

  • FY26 capex of ₹110 cr; FY27 capex guided at ~₹100 cr.
  • Net block of fixed assets stood at ₹194.4 cr on 31 March 2026; CWIP at ₹8.8 cr.
  • IPO proceeds of ₹220 cr: ₹27 cr deployed to capex, ₹50 cr to working capital, ₹74.2 cr still in bank balance.
  • Debt to rise ~₹50 cr in FY27 to a peak of ~₹250 cr; no further equity dilution planned.
  • Inventory days at 217 in FY26, targeted to fall to 160-170 in FY27 once gas disruption normalizes.
  • Solar project of 8.79 MW DC at ₹40 cr to save ~₹8.63 cr/year in electricity cost.

The industry, as management sees it

Management described stainless-steel raw material prices as 25-30% elevated due to geopolitical disruption to scrap imports, with pass-through to customers underway. The Indian stainless-steel tube market is seeing a technology shift as end-users (BHEL, BARC) increasingly accept hot-pierced pipes in addition to hot-extruded ones. European safeguard duties have risen to 50% with quotas reduced by 50%, dampening export economics.

Risks management named

  • Geopolitical situation and war-driven scrap/stainless-steel price inflation (25-30% raw material cost increase)
  • Elevated LNG/LPG prices continuing post gas supply normalisation
  • Q4 gas disruption curtailed production by 40% for 15-17 days in March
  • BHEL tender has been delayed from November to June-July
  • Safeguard duty hike in Europe (25% to 50%) and 50% import quota reduction dimmed acquisition rationale
  • Peak debt rising to ~₹250 cr in FY27 to fund welded capex and solar project

Q&A

Q&A was dominated by capacity/capex and execution questions from institutional analysts (Samarsh Capital, Monarch Networth, Carnelian, Niveshaay), with retail and boutique investors probing on volumes and Q4 disruption. Management was forthcoming on capacity numbers, capex phasing, BHEL tender timing and the gas-driven Q4 shortfall, but repeatedly declined volume, realisation and EBITDA-per-ton data citing competitive reasons. The pushback on volume disclosures was notable — at least three analysts were deflected on the same topic. The 25% FY27 revenue guidance was defended as conservative, with management pointing to optionality from the BHEL tender and data centre demand from H2 FY27.

Not answered directly

  • Volume disclosure by product segment
  • Average realisation per ton for seamless pipe
  • EBITDA per ton for seamless and welded
  • Order book quantity-wise split between seamless and welded
  • Peer margin comparison

Asked for a number, answered without one

  • Production and sales volumes across segments: Due to competitive reason, we do not share the volumes of any products.
  • Average realization per ton for seamless pipes: We are not sharing that information due to competitive reasons.
  • Order book quantity-wise breakup between seamless and welded: Even that we cannot share because of competitive reasons; it's not possible.
  • EBITDA per ton for welded and seamless: We are bound not to share that information because of competitive reasons.
  • Pipe and tube demand per gigawatt of power capex: We don't have data for 1 gigawatt what kind of pipes and tubes or how much quantum is needed.

Every question, with its answer

  1. 1. Strategic levers and raw material pass-through

    Sucrit Patil, Eyesight Fintrade

    Question. What type of strategic levers are you prioritizing in FY26-27 to expand Scoda's stainless steel and alloy tube portfolio while managing raw material price volatility and positioning for export-led growth?

    Answer, Samarth Patel, Chairman and Whole Time Director. Clarified that Scoda is stainless-steel only, not alloy pipes. Raw material is stainless-steel round bar made from imported scrap; geopolitical situation has raised base material prices by 25-30% but pass-through is built into the order-booking model — prices taken at the time of order booking/dispatch.

    Follow-up. What type of capital allocation and risk management frameworks are being applied in FY26-27 to balance working capital, hedge against steel/forex volatility, and sustain liquidity buffers for large-scale expansion?

    Answer. Inventory days rose to 217 due to the gas-driven plant shutdown. Management plans to bring inventory days down to 160 in FY27, which will help support revenue growth through financial operations. (Ravi Patel)

  2. 2. Welded capex, funding and future expansion

    Adishwar Golchha, Samarsh Capital

    Question. After FY27, what are the expansion plans in terms of capacity and capex? How will the 13,000 MT welded capacity be funded — any equity dilution?

    Answer, Samarth Patel, Chairman and Whole Time Director. Welded expansion of 8,000 MT (total 21,000 MT welded, 20,000 MT seamless) funded via internal accruals and term loans; no further equity dilution planned. Capex of ₹45 cr for 13,000 MT underway; another ₹40 cr for additional 8,000 MT next year. CFO noted debt will rise by ~₹50 cr during expansion, to be pared down post-utilisation. Samarth bhai confirmed no further seamless capacity additions; any FY29-FY30 expansion would be market-driven.

  3. 3. Capex pacing, delays and Rina Marine approval

    Sahil Sanghvi, Monarch Networth Capital

    Question. How much of the planned capex is already spent and what is the FY27 capex outflow? Reasons for the delay in the high-diameter welded pipe capex (initially Q3 FY27)? Any new approvals or end-user industries in the pipeline?

    Answer, Ravi Patel / Samarth Patel, CFO / Chairman. FY26 capex was ₹110 cr; almost ₹100 cr additional outflow expected in FY27. Delay attributed to geopolitical situation — all machines are made from steel, and the project machines are being imported from China with shipping/logistics/fuel-surcharge issues; deliveries expected July-August. Rina Marine approval for the Italian marine sector is in the final stage, expected within 3-4 weeks.

  4. 4. Geographic growth split and growth optionality

    Viraj Parekh, Carnelian Asset Management

    Question. You guided 25% revenue growth for FY27 — could you break this up by geography (domestic vs export)? Is this a conservative number with optionality for upside?

    Answer, Samarth Patel, Chairman and Whole Time Director. Management is on the conservative side. Target mix of 40% export and 60% domestic, including both seamless and welded. Q4 FY26 saw strong export growth despite global trade disruptions. Will revisit growth outlook in H1 FY27 given the geopolitical environment. CFO added that potential domestic catalysts include BHEL power-sector tender (~August) and data centre capex from Adani/Reliance — domestic growth could exceed 20-25%. Inventory days expected to normalise to 160-170 from 217; peak debt projected at ~₹250 cr in FY27 (+₹50 cr).

  5. 5. Welded capex rationale, utilisation guidance and BHEL order pipeline

    Parikshit, Niveshaay Investment Advisory

    Question. Why is additional capex being done in welded pipes? What utilization are you expecting on seamless and welded in FY27 and FY28? Any recent orders from BHEL? What is the current order book?

    Answer, Samarth Patel, Chairman and Whole Time Director. Welded capex rationale: market exploration revealed demand for up to 16-inch welded pipes for data centres, HVAC, cooling and water treatment. Current capacity was only up to 8 inches, so expanded post-IPO to 16 inches with 8,000 MT additional. Welded optimum utilisation in FY29; seamless in FY28. FY27 guidance: seamless 70% utilisation, welded 25%. BHEL/NTP C are already approved; new tender postponed from November to June-July. Current order book: ₹175 cr.

  6. 6. Data centre opportunity and export sector mix

    Sachin, Trade Quest

    Question. What is the data centre revenue contribution in FY26 and outlook for FY27 via welded pipes? Any confirmed data centre order book? What sector leads export growth?

    Answer, Ravi Patel / Samarth Patel, CFO / Chairman. FY26 revenue was entirely from seamless; no welded data centre revenue yet. Welded plant production from H2 FY27, with new mills designed for cooling/condensing/HVAC data centre applications. No firm data centre order book yet but inquiries are in hand. Export mix is not sector-specific — oil and gas accounts for ~50% of exports; rest from engineering, automotive, power, cooling. Sachin requested quarterly calls and timely order disclosure; management noted for internal discussion.

  7. 7. Q4 disruption, LPG cost pass-through and withdrawn acquisition

    Jugal Parekh, Individual Investor

    Question. What went wrong in the last quarter that we couldn't meet guidance? Is the situation one-off or structural — has product demand been impacted? Why was the planned acquisition cancelled?

    Answer, Samarth Patel, Chairman and Whole Time Director. Q4 saw a PNG gas disruption in mid-March for 15-17 days due to geopolitical war; plant completely shut for 15 days. Q4 revenue would have been ~₹140 cr without the disruption. Gas availability is normalised but LPG prices remain elevated; impact is being passed through to customers with a lag. Demand is intact, only pricing was impacted. Acquisition cancelled due to cross-border remittance/regulatory challenges and Europe's safeguard duty hike from 25% to 50% with 50% quota reduction, which eroded the strategic benefit. Investor also requested results to be released alongside the call or via press release; management noted for consideration.

  8. 8. Margin gap vs peer, solar savings and data centre timeline

    Shlok, Xylem PMS

    Question. One listed peer is generating 100-200 bps better margins. What structural measures to bridge the gap? How much will the solar project help margins? When can we expect data-centre led orders?

    Answer, Ravi Patel / Samarth Patel, CFO / Chairman. EBITDA decline in FY26 was due to under-absorbed fixed costs from new capacity commissioning; CFO declined to comment on peer margins. Solar project will save ₹4.9 cr (seamless) + ₹3.8 cr (welded) annually, totalling ~₹8 cr. Data centre orders expected in the last quarter of FY27 once welded project starts; inquiries and customer talks are already in hand.

    Partly answered.

  9. 9. Power and fuel cost as % of expenses

    Shubham, Chhattisgarh Investments

    Question. What was our power cost for this quarter and for FY26? What was the increase in power cost for the current quarter?

    Answer, Ravi Patel, Chief Financial Officer. Total power and fuel cost is ~17-18% of total expenses. Gas prices increased by ~25% but will be passed on to customers eventually.

    Partly answered.

  10. 10. Volumes, plant shutdown duration, BHEL order and finance cost walk

    Kapil, Aarth Growth Fund

    Question. Can you share sales and production volumes for seamless/welded/mother hollow in FY26? How long was the plant shut? What's the execution timeline for the ₹175 cr order book, and what's the expected BHEL order size? Why did finance cost rise despite lower borrowings?

    Answer, Samarth Patel / Ravi Patel, Chairman / CFO. Volume disclosures declined for competitive reasons. Plant was shut for 15 days in March, impacting each product as all need gas for solution annealing. ₹175 cr order book is for 3-4 months; BHEL tender not yet floated, hence size unknown. Finance cost rose due to ongoing capex borrowings, solar project funding, higher working capital utilisation and interest on delayed income tax payments.

    Not answered directly.

  11. 11. Utilisation confirmation, technology positioning and EBITDA per ton

    Aryan Bhatia, InVed Research

    Question. Confirm capacity utilisation for FY27 — is 70% on 20,000 MT seamless and 25% on 13,000 MT welded? Difference between hot-extruded and hot-pierced seamless pipes — is the industry moving away from pierced? Can you provide EBITDA per ton for seamless and welded?

    Answer, Samarth Patel, Chairman and Whole Time Director. Utilisation assumptions confirmed. Pushed back on the view that the market is shifting to extruded: hot extruded pipes are too expensive, India lacks domestic capacity, and price differential is extensive. Even BHEL (historically extruded-only) and BARC have opened procurement to hot-pierced pipes. EBITDA per ton data declined for competitive reasons.

    Not answered directly.

  12. 12. Realisation and order book split

    Akshay Darji, Self-Shine Industries

    Question. What is the average realisation per ton for seamless pipe? Can you share the order book quantity-wise breakup between seamless and welded?

    Answer, Samarth Patel, Chairman and Whole Time Director. Both realisations and order book quantity breakup declined for competitive reasons.

    Not answered directly.

  13. 13. Q1 normalisation, seamless capacity ramp and order book visibility

    Sachin, Trade Quest

    Question. Can we consider Q1 as a normalised quarter? Any operational issues with the recently added seamless capacity? Does the ₹175 cr order book have any long-dated orders? Any tenders in evaluation?

    Answer, Samarth Patel, Chairman and Whole Time Director. Q1 should be normalised; all operational issues resolved and the new seamless capacity is fully integrated and running at full capacity this quarter. Order book is currently 3-4 months; long-dated visibility will come from BHEL/BARC participation once those tenders are released. No major tenders in evaluation currently. ₹175 cr has some large orders but is replenished continuously.

  14. 14. Receivables, payment terms and gas disruption scope

    Shubham, Chhattisgarh Investments

    Question. Receivables rose 36% versus only 7% revenue growth — why? Do you have a milestone-based payment system? Was the gas plant shutdown industry-wide or geography-specific?

    Answer, Ravi Patel / Samarth Patel, CFO / Chairman. Receivables rise attributed to supply-chain disruption affecting payment cycles across the industry, with logistics issues — payments linked to shipments reaching Middle East/Europe for export-fabricator projects. No milestone-based payment system; terms are mutually agreed. Gas disruption was both industry-wide and geography-specific.

    Partly answered.

What was said

Topic by topic, in the order it was spoken

FY26 Headline Performance and Strategic Context · Samarth Patel (Chairman)

  • Year of transition and investment, with focus on scaling both seamless and welded segments.
  • FY26 revenue growth of 7% to ₹518 cr, moderation attributed to March gas-driven piercing plant shutdown.
  • Gross margins expanded despite the disruption, providing a strong foundation for the new capacity ramp.

Capacity Expansion: Seamless and Welded Build-out · Samarth Patel (Chairman)

  • Seamless capacity raised to 20,000 MTPA, with total production capacity at 21,000 MTPA in FY26.
  • New welded facility (8,000 MT) at an investment of ~₹40 cr via internal accruals and term loans; equipment delivery expected July-August, trial runs by end Q2 FY27.
  • Total welded capacity to reach 21,150 MTPA by H1 FY28, with optimum contribution by FY29.

Backwards Integration: Mother Hollow Mill · Samarth Patel (Chairman)

  • Mother hollow mill supports backwards integration for seamless tubes.
  • Captive consumption moved to 70%, with target of 100% by FY28.

Solar Power Project · Samarth Patel (Chairman)

  • Total 8.79 MW DC of solar capacity: 4.99 MW for seamless, 3.8 MW for upcoming welded plant.
  • Expected to generate 137 lakh KWH annually, saving ~₹8.63 cr in yearly electricity cost and buffering utility price spikes.

IPO Proceeds and Capital Allocation · Samarth Patel (Chairman)

  • Successful IPO raised ₹220 cr, with listing on NSE and BSE.
  • As of H2 FY26: ₹27 cr deployed to capex, ₹50 cr to working capital, ₹74.2 cr remaining in bank.

FY26 Financial Performance Walkthrough · Ravi Patel (CFO)

  • FY26 revenue ₹518.7 cr (+7%); Q4 revenue ₹123.6 cr broadly flat YoY.
  • EBITDA ₹76.2 cr at 14.7% margin (vs 16.1% in FY25); Q4 EBITDA ₹16.7 cr at 13.5% margin (vs 14.1%).
  • PAT grew 22% YoY to ₹38.8 cr at 7.5% margin; Q4 PAT declined 7% YoY to ₹6.3 cr at 5.1% margin.
  • FY26 capex of ₹110 cr; net block ₹194.4 cr and CWIP ₹8.8 cr as of March 31.

Geographic and Export Mix · Ravi Patel (CFO)

  • FY26 export share 34.6% of total revenue; Q4 FY26 export share rose to 44.8%.
  • Geographic split: India ₹339 cr, Europe ₹137.8 cr, Americas ₹30.7 cr, Others ₹8.9 cr.

In their words

Coming to FY27, we are expecting a 25% revenue growth with 14% to 15% EBITDA margins.
Samarth Patel (Chairman and Whole Time Director, Scoda Tubes Limited)
The welded capacity expansion adds 8,000 metric ton per annum of our new capacity at an investment of approximately INR40 crores through internal accruals and term loans. The total welded capacity post-expansion will be 21,150 metric tons per annum by the H1 FY28 and expecting optimum contribution by FY29.
Samarth Patel (Chairman and Whole Time Director, Scoda Tubes Limited)
In the absence of gas supply disruption, revenue could have been approximately INR140 crores for the quarter. But the gas cut in late March was a single largest revenue headwind, curtailing production at a critical period.
Samarth Patel (Chairman and Whole Time Director, Scoda Tubes Limited)

To check next time

What management committed to on this call, or the dates they gave.

  • H2 FY27 commissioning of the new 8,000 MT welded plant (trial runs from Q2 FY27).
  • BHEL tender participation expected in July or August for power sector orders.
  • Rina Marine approval for Italian marine market in 3-4 weeks.
  • Inventory days normalization to 160-170 from current 217 in FY27.
  • Solar 8.79 MW DC installation commissioning and electricity cost savings.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Fri 29 May 2026₹121.84−2.91%−1.50%
5 sessions Thu 4 Jun 2026₹122.87−2.09%−2.05%
20 sessions Thu 25 Jun 2026₹144.05+14.79%+0.62%

From the close of Wed 27 May 2026, ₹125.49: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Scoda Tubes's other calls

  • Q2 FY27Fri 13 Nov 2026Tone: Mixed
  • Q2 FY26Fri 14 Nov 2025Tone: Confident
  • Q4 FY25Wed 25 Jun 2025Tone: Confident