Simplex Castings Q1 FY27 earnings call

Wed 19 Aug 202616:30 IST

In brief

Q1 FY27 revenue up 35% YoY to ₹60.95 cr, PAT up 45% YoY; FY27 ₹300 cr and FY28 ₹500 cr targets reiterated.

Management's tone
Confident
What was said
Leaned positive
Guidance
Guidance held
Analyst pushback
Medium
Stock, next session
+4.53% (Nifty 50 +0.64%)
  • Q1 FY27 revenue ₹60.95 cr, up ~35% YoY from ₹45.21 cr, and 11% QoQ from ₹54.76 cr.
  • EBITDA ₹11.52 cr (up ~25% YoY), margin 18.89%; PAT ₹6.86 cr (up ~45% YoY), margin 11.25%.
  • Near-term order book expanded to ~₹150 cr+ versus historical ₹80-100 cr; FY27 ₹300 cr target reiterated as on track.
  • Capacity utilisation currently 50-60%, targeted at 80% by end of next financial year (FY28).
  • Working capital cycle targeted at 60-70 days by FY28 from current ~120 days via railway mix and RXIL/Invoice Mart discounting.

An AI read of the company's transcript · the filing

The numbers

The quarter, Q1 FY27

This quarterA year agoLast quarterMargin
Revenue₹61 cr+34.8%+11.3%
EBITDA (excl. other income)₹11.5 cr+25.8%+14.9%18.9% (20.3% a year ago)
Net profit₹6.9 cr+44.8%+10.9%11.3% (10.5% a year ago)
EPS (₹)₹1.67−75.1%−79.6%

From the company's filed results for the quarter ended 30 Jun 2026 (standalone), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

What moved the numbers, as management explained it

  • Revenue grew ~35% YoY in Q1 on higher execution across steel, railway and power order pipeline.
  • EBITDA margin at 18.89% with PAT margin 11.25% (vs 10.48%) reflecting richer mix and operating leverage on higher base.
  • Green hydrogen DRI pilot project closed due to ~30-35 cr GST issue, removing a future revenue line. (one-off)
  • Cast railway bogie orders awaited from wagon builders in Aug-Sept 2026; capex at Tedesara Unit (~30 cr CWIP) to complete in FY27.

The numbers management led with

  • Capacity utilization: 50-60% currently; targeting 80% by end of FY28
  • Capital work-in-progress: ~Rs 30 cr at Tedesara (Rajnandgaon) plant; to complete within FY27
  • Order book: Rs 150+ cr vs historical Rs 80-100 cr

Guidance

Guidance on this call

WhatForWhat management saidFiled
FY27 revenueFY27FY27 revenue targeted at 300 cr (200 existing + 50 casted railway + 50 power)—
FY28 revenueFY28FY28 target of 500 cr contingent on execution, EPC wins and an acquisition—
PAT margin minimumFY27PAT margin guidance maintained at 8-10% minimum—
FY27 capexFY27FY27 capex guided at 25 cr versus FY26 actual of ~15 cr—
Capital raise via second preferential issueFY27Second preferential issue of ~50 cr planned — 25 cr for fabricated bogie capex and 25 cr for working capital—
Working capital cycle targetFY28By FY28 we expect an operating cycle with targeting days of 60 to 70 days—
Capacity utilisation targetFY28Targeting to reach at least 80% capacity utilisation by end of next financial year—
Power sector businessFY27Another 100 crores from power sector will get added (through BHL orders via RXIL)—
Railway bogies business (Railways)FY28Next year we are targeting more than 100 crores from this (railway bogies) business only—
Defence plus shipbuilding share of revenueFY27Defence plus shipbuilding would be 10 to 15% of business in FY27 and same in FY28—
Cast railway bogies monthly capacity (Railways)FY27Capacity of 200-250 bogies/month from September 2026 onwards—
Q1 FY27 YoY revenue growthQ1 FY27Revenue from operations for Q1 FY27... registering a strong approx. 35% year on year growth34.8%, below the figure guided (standalone)
Q1 FY27 YoY PAT growthQ1 FY27PAT stood at 6.86 crores up to approximately 45% year on year from 4.74 crores44.8%, below the figure guided (standalone)
Q1 FY27 YoY EBITDA growthQ1 FY27EBITDA increased above approx. 25% year on year to 11.52 crores25.8%, above the figure guided (standalone)

Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.

What changed since the Fri 29 May 2026 call

WhatOn the Fri 29 May 2026 callOn this call
FY27 capex envelope (raised)FY27 capex guided at 25 cr versus FY26 actual of ~15 crCapital work in progress is roughly around 30 crores... deployed in both working capital needs and capital expansion... at Tedesara Unit
FY27 revenue target (held)FY27 revenue targeted at 300 cr (200 existing + 50 casted railway + 50 power)We have done already 60 in Q1... 300 we are in line Sir
FY28 ₹500 cr target composition (restated)FY28 target of 500 cr contingent on execution, EPC wins and an acquisitionEPC business is not included in the 500 cr target... 500 would come through organic or inorganic growth
Order book scale (raised)Not specifically quantified at 150 cr+; near-term order book described historically at 80-100 crNear term order book has expanded to roughly 150 crores plus
Working capital target (new)Not articulated as a specific days targetTargeting days of 60 to 70 days by FY28 from current ~120 days via product mix and RXIL/Invoice Mart discounting
Green hydrogen DRI pilot (not repeated)Project awarded to Simplex as consortium leader with IIT Bhilai, 160-161 cr grantProject closed because GST (~30-35 cr) made it unviable; tender reissued but Simplex did not re-bid
PAT margin guidance band (restated)PAT margin guidance maintained at 8-10% minimum; visible improvement from Q3-Q4 FY27Q1 PAT margin at 11.25%, above the 8-10% band; management not explicitly reaffirming the band on this call
Capacity utilisation benchmark (new)Not previously stated as a targetTargeting at least 80% capacity utilisation by end of next financial year (FY28)

The business

Balance sheet, capex and funding

  • Capital work in progress ~₹30 cr, deployed in capex and working capital, located at Tedesara Unit, to be completed in FY27.
  • FY27 capex guided at ~₹25 cr (vs ₹15 cr in FY26) per prior call; current CWIP at ₹30 cr includes this and earlier deployment.
  • Working capital cycle currently ~120 days, targeted at 60-70 days by FY28 via faster-moving product mix and RXIL/Invoice Mart discounting at 5-5.5%.
  • Fundraise (second preferential issue ~₹50 cr) deemed sufficient for the FY28 ₹500 cr target with no further fundraise planned.
  • Cash flow from operations described as 'very decent'; management wants next phase of growth to be cash-efficient with disciplined working capital.
  • Capacity utilisation at 50-60% currently with target of 80% by FY28, indicating significant operating leverage runway.

The industry, as management sees it

Management views the Indian metallurgical (steel + non-ferrous) capital-goods cycle as strong for the next 4-5 years, supported by ArcelorMittal, Shyam Metalics, Rungta and aluminium players (Vedanta, Hindustan Zinc, Nalco). Railways and shipbuilding are seen as parallel structural growth drivers supported by government policy push; defence is a longer-cycle opportunity requiring partnership with ordnance factories. The combined opportunity set is described as 'significantly broader than at any time in the past.'

Risks management named

  • Capacity already at 50-60% utilization with execution bandwidth stretched
  • Green hydrogen DRI project abandoned due to GST implications on government grant
  • Bank guarantee limits cap individual EPC project size to Rs 100-150 cr
  • Liquidated damages of 5-10% on orders if delivery timelines slip

Q&A

Q&A spanned capacity utilization and capex pacing, the working-capital cycle reduction plan, railway bogies and Mazgaon Dock order wins, defence and shipbuilding strategy, the green-hydrogen DRI project failure, technology-collaboration royalties, the broader Indian steel/aluminium capex cycle, and EPC business economics. Pushback was strongest on the Rs 500 cr FY28 target (capacity feasibility) and on PAT margin trajectory as lower-complexity railway/power mix scales — both were addressed with credible detail (third-unit/inorganic plan; selective product mix in balance business). The moderator cut the last analyst's follow-up short on time constraints. No major surprises — the call broadly validated the Simplex 2.0 thesis with quantified working-capital and order-book commitments.

Not answered directly

  • Data-centre crankshaft opportunity (ruled out at the component level)
  • AS9100 certification for defence (not directly addressed — strategy pivoted to ordnance-factory partnership)
  • Detailed Simplex Group historical shareholding structure (cut short by moderator)

Asked for a number, answered without one

  • Defence revenue quantum FY27: Management said 5-10% for defence plus shipbuilding combined, i.e., 10-15%, and would remain 10-15% in the next financial year; did not give a rupee number.
  • Capacity expansion investment range for next leg: Ketan Shah said it would be financed entirely through internal accruals; no further capex or fundraise planned; no specific number given.
  • EPC order timing and pipeline value: Management said 'maybe sooner' and is working on 3 fronts (railway, power, EPC) but provided no committed order value or timeline.
  • Acquisition/JV target for FY28 ₹500 cr: Ketan Shah said 'we already have certain things in pipeline and we are already working on it'; no name, size or valuation disclosed.

Every question, with its answer

  1. 1. Capacity utilization & capex

    Dhaval Pandya, Unknown

    Question. Congrats on the numbers. What is current capacity utilization and where do you expect to be by year-end? What is the current CWIP status, where is the capex happening and when will it complete? Separately, are you looking at the data-centre crankshaft opportunity for DG sets?

    Answer, Avinash Hariharno, Director (Finance). Capacity utilization is currently 50-60% and will start ramping gradually — targeting 80% by end of FY28. CWIP is ~Rs 30 cr deployed in both working-capital needs and capex; the capex is happening at the Tedesara (Rajnandgaon) unit and will be completed this financial year. On crankshafts — Ketan Shah added that crankshafts are a very specialized item requiring intricate machining that we don't do today, so they're not on the radar. However, smaller castings for data-centre applications are being looked at.

    Follow-up. Same analyst — any timeline for the data-centre crankshaft question (already covered).

  2. 2. Railway bogies, Mazgaon Dock & FY27 guidance

    Mithun Maity, Unknown

    Question. We are planning to cast ~200 bogies from September 2026. Are we on track? Are we doing job work for Mazgaon Dock? What is the order size and can we expect bigger orders? And are we on track for the Rs 300 cr FY27 revenue guidance?

    Answer, Ketan Shah, Chairman & Executive Director. On bogies: consistent 200/month capacity will only kick in once wagon orders flow from Indian Railways to wagon makers — minor wear-and-tear tenders quoted for September but major volume depends on railway wagon orders. On Mazgaon Dock: first 3 sets of the 5-set order already cast, first set offered for inspection; order value ~Rs 4.5 cr for the 5 sets with another ~Rs 8 cr order in the pipeline. Bigger orders expected across Mazgaon, Goa Shipyard, Hindustan Shipyard and Cochin — Simplex is one of few foundries certified by both ABS and Indian Register of Shipping. On guidance: Q1 already at Rs 60 cr; Rs 150 cr order book plus pipeline orders need to be executed by March — Rs 300 cr target remains in line.

  3. 3. Working capital cycle reduction

    Praneet, Unknown

    Question. Avinash mentioned working capital coming down to 60-70 days, but we are almost double that today. How do we get there? Can you split the working-capital reduction between invoice discounting (RXIL) vs fast-incremental railway business? What is the margin cost of these payment platforms?

    Answer, Avinash Hariharno, Director (Finance). Working-capital reduction has three legs: (1) product mix shift — railway bogies have ~30-45 day cycle and wagon builders pay upfront, (2) RXIL/Invoice Mart platform already registered giving 30-35 day post-dispatch payment, (3) BHL/power-sector orders via RXIL. Currently zero railway revenue, but FY28 target is >Rs 100 cr from railways plus ~Rs 100 cr from power — together that should bring the cycle from 100-120 to 60-70 days. On margin cost: discounting rate is 5-5.5% annualised, which is a fair trade-off for early payments. Rough math: at Rs 300 cr revenue and 60-day cycle, working capital need is ~Rs 50 cr.

    Follow-up. PAT margin outlook — if railways and power are tender-based with lower complexity, shouldn't PAT margin compress?

    Answer. Ketan clarified: power and railway margins will be similar to current levels (tender business, not higher); however the company is selectively choosing more complex/niche products for the balance business, which should lift PAT margins. The strategy is to be 'more choosy' in non-railway/power categories. On the Rs 500 cr FY28 target — the capacity for that is not in the two current units; expansion has to come from organic or inorganic growth (already in pipeline).

  4. 4. Working-capital mix shift & bogie customer mix

    Aditya Mutha, Unknown

    Question. On the working-capital transition — current products are very capital-intensive (e.g. torpedo ladle cars take 7-8 months). Can you throw light on the shift? Also on bogies — do you take orders directly from Indian Railways or from OEMs/wagon builders?

    Answer, Ketan Shah, Chairman & Executive Director. On working-capital shift: existing equipment business (torpedo ladle cars, slag ladle cars, transfer cars) inherently has a 7-8 month cycle due to gearboxes, motors, hydraulics, fabrication, machining, assembly and testing — that mix will remain similar. The compression comes from adding Rs 100 cr each of CASNUB (railway bogies) and BHL/L&T power fabrication, both of which have shorter cycles. On bogie customer mix: historically 20% came directly from Indian Railways (for various wagon repair shops) and 80% from wagon builders — same pattern expected going forward.

  5. 5. Long-term opportunity beyond FY28

    Parth Soda, Trinitra Asset Managers

    Question. Beyond the Rs 500 cr FY28 milestone, what is the long-term opportunity for Simplex and what could the business look like in terms of revenue mix and margins over the next 3-5 years?

    Answer, Ketan Shah, Chairman & Executive Director. Looking at machine-tool castings, defence in a big way, and various other verticals. The strength is the existing setup — 1,200 workers, 100+ machine tools, 30 acres of land, 60-year skill base — which is hard to replicate and would need significant capital today. The intent is to either buy a technology company or set up a JV with one, leveraging the existing platform to manufacture anything. EPC division has historically done complete steel plants, pellet plants, blast furnaces — so the Rs 500 cr ceiling is not the limit, only a milestone.

    Partly answered.

  6. 6. Fundraise, defence, shipbuilding and bogie capacity

    Manav, Unknown

    Question. On the fundraise — is it sufficient to fund the FY28 trajectory too, or will there be another raise? On defence — you said 10-15% mix, but does that need AS9100 certification? On shipbuilding — J-curve growth, are you looking at solutions beyond castings (e.g. steering systems)? And on bogies — 200/month capacity confirmed?

    Answer, Ketan Shah, Chairman & Executive Director. On fundraise: Avinash confirmed no further fundraiser is required — the existing raise is sufficient for the Rs 500 cr projection. On defence: 10-15% is deliberately conservative; strategy is to partner with ordnance factories (working with Gadkari Factory, Khamaria, Jabalpur) where Simplex's flexible machines can support their 1.5-2X volume expansion need. Defence + shipbuilding combined will be 10-15% in FY27 and stay at 10-15% in FY28 — not targeting 20-30%. On shipbuilding: beyond A/B brackets and rudder stock, exploring complete sub-systems (e.g. steering systems), in discussions with companies for technology. On bogies: 200/month is an understated conservative number; actual capability is higher. On precision engineering: currently limited to grey iron/steel; 5/7-axis precision machining not in scope today but flagged as future value-chain option.

    Follow-up. Foundry vs precision engineering distinction — what is the technical difference and could Simplex move to auto-ancillary?

    Answer. Precision engineered castings are within scope; the gap is exotic metals (nickel alloys) and 5/7/9-axis machining for tool/die/turbine blade applications. Not required for current product mix. Auto ancillary not a target — heavy casting/machining for MNCs already has significant headroom for expansion.

  7. 7. Green hydrogen project, tech royalties, ArcelorMittal & aluminium traction

    Srikanth Reddy, Unknown

    Question. On the green-hydrogen DRI project with IIT Bhilai — what is the current status? On technology collaborations — what is the royalty structure? On ArcelorMittal's Vizag capex — what is the order enquiry traction? And on aluminium capex — can Simplex supply capital goods to those players?

    Answer, Ketan Shah, Chairman & Executive Director. On green-hydrogen DRI project: the project was abandoned. Total project ~Rs 300 cr with Rs 160-161 cr government grant. The tender required IP and asset transfer in proportion to grant — GST Council ruled it as commercial activity attracting ~Rs 30-35 cr GST. After consultations between Simplex, Ministry of Steel and advisors, the tender was reissued with new conditions (must be operating a DRI plant, which Simplex was not) — so we did not participate. On technology collaborations: all historical tech transfers are completed; no royalty payments owed for years. On ArcelorMittal Vizag: indirect traction via the broader Indian steel capex cycle — ArcelorMittal expanding in 2 locations in Odisha and 1 in Andhra; Simplex's steel-sector credentials are unmatched in Bhilai and that drives enquiry flow. On aluminium: clarified that Simplex traditionally serves the entire 'metallurgical sector' (ferrous + non-ferrous); ~20% of current order book is non-ferrous — Balco, Vedanta, Hindustan Zinc, Nalco, Aditya Birla have been long-standing customers.

  8. 8. Fabrication & foundry capacity, steel capex cycle, order book discipline

    Darshil Pandya, Unknown

    Question. On the fabrication capacity expansion to 15,000 tons — what is the incremental capacity being added? On foundry — is anything being added? And on the broader steel/power capex cycle (ArcelorMittal, Shyam Metalics, Rungta, etc.) — how well-positioned is Simplex to capitalize? And what is the current pipeline vs the Rs 150 cr order book?

    Answer, Ketan Shah, Chairman & Executive Director. On fabrication capacity: planned capacity is 1,500 tons/month (~18,000 tons/year); currently at 6,000 tons, targeting to add 6,000-8,000 tons via debottlenecking. On foundry: limited debottlenecking — Rs 4-5 cr for one CNC machine, conveyors, cranes; no large machine-molding plant at present (on drawing board only). On the steel/power capex cycle: Bhilai has very few large players other than Simplex, so capital goods for any ferrous/non-ferrous plant tend to be sourced from Bhilai — Simplex is the preferred supplier. On pipeline: there are orders in pipeline for the current quarter but management deliberately does not want to exceed Rs 100-150 cr order book given liquidated damages risk (typically 5%, can go up to 10%).

  9. 9. EPC business, defence legacy, Simplex Group structure

    Praneet, Unknown

    Question. Follow-up — on the new facility/acquisition, what is the investment range and will it be funded through internal accruals (no further borrowing)? On EPC — is it through Simplex itself or another entity? Historical peak EPC revenue? Order sizes? Margins? Working-capital needs? On defence at the Gun Carriage Factory — what's the status? On Simplex Group — what's the relationship with Simplex Infrastructure?

    Answer, Ketan Shah, Chairman & Executive Director. On new facility: investment range limited to internal accruals — no further capex or borrowing planned. On EPC: only Simplex Castings (no separate entity); historically ~Rs 100 cr/year EPC revenue at peak; normal project tenure 3-4 years; current focus is on packages sized Rs 100-150 cr due to bank-guarantee limits; looking at minimum 15-20% margin; no further fundraise needed for EPC. On working capital for EPC: typically 5% PBG upfront, 10% advance against BG, then milestone-based billing with 10% retention at commissioning — projects largely self-financing with ~Rs 10-15 cr occasional need. On defence: Simplex is a long-standing defence supplier — turrets for T-72 tanks, missile test bench beds (Chandipur, Balasore, Itarsi), HVF Medak road wheels for the Sarthak APC — the new 10-15% push is incremental, not greenfield. On Simplex Group: Simplex Infrastructure (Mundura family, Kolkata) is NOT part of the Simplex group; the original Simplex Engineering and Foundry Works (Jabalpur, 1941) split in 1970 into Simplex Castings (listed, 1992) and a privately-held engineering entity owned by cousins — both in Bhilai.

    Follow-up. Same analyst — was EPC originally carved out of Simplex?

    Answer. Ketan explained: the EPC division was disbanded in 2020 (during a steel-industry downturn) to remove overheads but all credentials remain with Simplex Castings. EPC will be executed through Simplex Castings only. Note that the Rs 500 cr FY28 target does NOT include EPC — it's a separate, opportunistic pillar capped at ~Rs 100 cr/year.

What was said

Topic by topic, in the order it was spoken

Simplex 2.0 Strategy & Growth Vision · Ketan Shah (Chairman & Executive Director)

  • Management entered FY27 with 'significantly greater confidence' than a year ago, articulating the 'Simplex 2.0' thesis of scaling six decades of heavy engineering, fabrication, machining and EPC capabilities.
  • Strategic intent is to move from preservation of legacy to active scale-up across existing verticals (steel, power, mining) and new verticals (railways, defence, oil & gas, shipbuilding).
  • Railways explicitly positioned as an important new growth vertical; defence, oil & gas and shipbuilding identified as the active expansion roadmap beyond steel/power.
  • Manufacturing platform (~1,200 workers, 100+ machine tools, 30 acres of land bank at Bhilai) seen as the foundation for participating in 'substantially larger opportunities' than historically addressed.
  • Stated philosophy: participate in larger projects, manufacture more complex/higher-value products, diversify revenue base and extract greater productivity from the existing manufacturing platform.

Q1 FY27 Financial Performance · Avinash Hariharno (Director, Finance)

  • Revenue from operations Rs 60.95 cr in Q1 FY27, up ~35% YoY from Rs 45.21 cr in Q1 FY26; sequentially up ~11% from Rs 54.76 cr in Q4 FY26.
  • EBITDA Rs 11.62 cr in Q1 FY27 (margin 18.89%), up ~25% YoY from Rs 9.15 cr in Q1 FY26 — strong operating leverage on the volume growth.
  • PAT Rs 6.86 cr in Q1 FY27 (margin 11.25%), up ~45% YoY from Rs 4.74 cr in Q1 FY26 (margin 10.48%) — margin expansion visible despite product-mix shift.
  • Order book expanded to ~Rs 150 cr+ vs the historical range of Rs 80-100 cr — described as a step-change in both scale and quality of pipeline.

Working Capital Strategy · Avinash Hariharno (Director, Finance)

  • Working capital framed as the company's most important financial priority; FY27 designated as a transition year for the working-capital cycle improvement.
  • Strategy: shift product mix at Unit 1 toward faster-moving, shorter-execution products; same approach to be progressively implemented at Unit 3.
  • FY28 target: operating cycle of 60-70 days vs the current ~120 days — driven by railway bogies (~30-45 day cycle), RXIL/Invoice Mart platform (30-35 day post-dispatch payment), and faster-moving BHL/L&T power-sector orders.
  • Acknowledged the change is gradual because it spans order selection, production planning, capacity allocation and customer mix — improvements will be progressive, not immediate.
  • Already generating 'decent' operating cash flow; reducing working-capital intensity is the lever to convert more of operating cash into free cash flow.

Railways, Defence & Shipbuilding Opportunity Set · Ketan Shah (Chairman & Executive Director)

  • Railway strategy: participate as a casting + machined bogie supplier; ~200 bogies/month capacity already established; first material railway revenue expected FY28 onward as wagon builders receive orders.
  • Defence strategy: deliberately capped at 10-15% of revenue (for both FY27 and FY28) — focused on a single ordnance factory initially (Gadkari Factory, Khamaria, Jabalpur) before expanding; no aggressive 20-30% growth push planned.
  • Shipbuilding: already executing Mazgaon Dock order (first 3 sets cast; first set offered for inspection; total 5 sets worth ~Rs 4.5 cr plus Rs 8 cr in pipeline); certifying agency approval (ABS + Indian Register of Shipping) cited as a moat.
  • Long-term intent: move up the value chain from pure castings to sub-assemblies, sub-components and complete systems in both defence and shipbuilding (e.g. steering systems).
  • Exotic materials (nickel alloys, 5/7-axis precision machining) flagged as a future value-chain opportunity but explicitly 'not on the cards' at present — heavy casting/machining is the priority.

Capex, Capacity & Future Growth Path · Ketan Shah (Chairman & Executive Director)

  • Current capacity utilization 50-60%; targeting 80% by end of FY28 — managed gradual ramp, not aggressive.
  • Capital work-in-progress ~Rs 30 cr at Tedesara (Rajnandgaon) plant, to be completed within FY27 — covers both working capital needs and fabrication capacity expansion.
  • Foundry expansion limited to debottlenecking (~Rs 4-5 cr for one CNC machine, conveyors, cranes); no large machine-molding plant capex currently planned.
  • Fabrication capacity: 6,000 tons/year currently; target to add 6,000-8,000 tons via Rs 15+ cr earlier capex — primarily for railway casted bogies and fabricated locomotive bogies.
  • Rs 500 cr FY28 target acknowledged to require a third unit or inorganic move (acquisition/JV with a technology company); current two units in Bhilai 'more or less' sized for Rs 300-350 cr.
  • Management explicitly stated no further equity fundraising planned — the recent raise is sufficient for the Rs 500 cr path, with further expansion funded through accruals.

In their words

Today the opportunity landscape for Simplex is significantly broader than it has all any time in the past. Across thermal and power, railways, defence, oil and gas, shipbuilding, multiple opportunities have opened for the company at the same time.
Ketan Shah (Chairman & Executive Director, Simplex Castings)
By FY28, we expect an operating cycle with the much more controlled and disciplined working capital structure, with a targeting days of 60 to 70 days.
Avinash Hariharno (Director, Finance, Simplex Castings)
Simplest Casting has 500 crores and beyond is also not a challenge because anybody who is looking at Indian market and wants to collaborate, the obvious choice would be Simplex Castings.
Ketan Shah (Chairman & Executive Director, Simplex Castings)

To check next time

What management committed to on this call, or the dates they gave.

  • Cast railway bogie order flow from wagon builders expected Aug-Sept 2026 and ramp to 200 bogies/month.
  • Tedesara Unit capex completion in FY27 and capacity ramp toward 80% utilisation by FY28.
  • Working capital days movement toward 60-70 day target with RXIL/Invoice Mart discounting.
  • Power sector order conversion (BHEL, L&T) targeting ~₹100 cr through RXIL route.
  • Any progress on inorganic move or technology tie-up to enable FY28 ₹500 cr target.
  • EPC project announcement from steel/power sector using Simplex's credentials, capped at ₹100-150 cr order sizes.

Transcript

We have not transcribed this call's recording. Read the company's transcript (PDF).

The stock after the call

After the callCloseStockNifty 50
Next session Thu 20 Aug 2026₹116.60+4.53%+0.64%
5 sessions Wed 26 Aug 2026₹112.90+1.21%+0.54%
20 sessions Thu 17 Sept 2026₹114.85+2.96%−3.35%

From the close of Wed 19 Aug 2026, ₹111.55: the call began at 16:30 IST, after the market closed, so that day's close is the base. Adjusted daily closes; the move includes everything else that happened in those sessions.

Simplex Castings's other calls