Solarworld Energy Sol Q4 FY26 earnings call
In brief
Q4 FY26 revenue ₹591 cr (+235% YoY), EBITDA ₹73 cr (12.1% margin), PAT ₹49 cr; guides FY27 revenue ~₹2,000 cr at 8-11% margins.
- Management's tone
- Cautious
- What was said
- Mixed
- Guidance
- Guidance held
- Analyst pushback
- Low
- Stock, next session
- −2.97% (Nifty 50 −0.49%)
- Q4 FY26 revenue ₹591 cr (+235% YoY); EBITDA ₹73 cr at 12.1% margin, PAT ₹49 cr at 8.1% net margin. FY26 EBITDA ₹187.9 cr (13.3%), PAT ₹120.4 cr.
- Order book of ~₹2,800 cr (₹1,674 cr solar EPC + ₹1,136 cr BESS) with management targeting 70-75% execution in FY27, implying ~₹1,950-2,000 cr revenue.
- FY27 BESS revenue guided at ₹800-1,000 cr (vs zero in FY26) at 14-15% PBT margin; targeting a 60-40 BESS to solar EPC revenue mix.
- 1.5 GW Roorkee module line operational; 1.2 GW cell line commercial production targeted June 2027; 3.4 GW BESS facility at trial stage.
- FY27 margins hedged at 8-11% on commodity headwinds (copper +40%, aluminum +50%, steel up) from war and a weaker rupee (85-86 to 96) hitting BESS imports.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹592 cr | — | +2.3% | |
| EBITDA (excl. other income) | ₹58.1 cr | — | −11.6% | 9.8% |
| Net profit | ₹49.1 cr | — | −0.3% | 8.3% |
| EPS (₹) | ₹5.66 | — | −0.4% |
From the company's filed results for the quarter ended 31 Mar 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
Where management's figures differ from the filing
- Q4 FY26 EBITDA: said ₹73 cr, 12.1% margin; filed ₹58.14 cr, 9.8% margin (excl other income). Management's figure includes other income of ₹15.14 cr; filed EBITDA excludes other income per its definition.
What moved the numbers, as management explained it
- Q4 revenue ₹591 cr (+235% YoY) reflects full-year scaling: FY26 revenue ₹1,416 cr vs ₹550 cr in FY25.
- Q4 EBITDA margin 12.1% compressed by raw material headwinds (copper +40%, aluminum +50%, steel up) tied to ongoing war and elevated Q4 input costs.
- Module manufacturing segment posted a slight loss in Q4 FY26: ALMM approval only received in Dec 2025, giving only 2-2.5 months of operations. (one-off)
- Other expense scaled with 2.5x revenue growth; FY25 had a ~₹140 million write-off for a private customer that was recovered in FY26 (showing in other income), making YoY comparison softer. (one-off)
- BESS imports hit by rupee depreciation from 85-86 to ~96, pressuring BESS segment margins.
The numbers management led with
- Total order book: ~INR2,800 crore (INR1,674 cr solar EPC + INR1,136 cr BESS)
- BESS ongoing projects: 582 MW AC, 1.2 GWh DC
- Module manufacturing capacity: 1.5 GW at Roorkee; ~INR146 cr capex; ALMM approval Dec 2025
- BESS manufacturing capacity: 3.4 GWh automated facility with KUKA Robotics; ~INR55–60 cr capex; trials underway
- Solar cell manufacturing capacity: 1.2 GW line at Pandhurna; commercial operations targeted June 2027
- FY27 BESS revenue target: INR800–1,000 crore vs. zero in FY26
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY27 revenue from order book execution | FY27 | 70-75% of ~₹2,800 cr order book, implying ~₹1,950-2,000 cr FY27 revenue. |
| FY27 BESS revenue | FY27 | BESS revenue ₹800-1,000 cr in FY27 versus zero in FY26. |
| FY27 overall margin band | FY27 | Overall margins to land in 8-11% range for FY27, contingent on raw material/war situation. |
| FY27 YoY revenue growth | FY27 | We expect to grow by around 40-45% in FY27 after ~200-250% growth in FY26. |
| FY27 BESS PBT margin | FY27 | BESS segment PBT margin expected at 14-15%. |
| BESS to solar EPC revenue mix | — | Targeting a 60-40 BESS to solar EPC revenue mix. |
| Solar module line utilization (going forward) | — | Module line utilization expected at 60-65% as orders build beyond current 40-45%. |
| 1.2 GW solar cell line commercial operations | FY28 | 1.2 GW solar cell line at Pandhurna to start commercial operations by June 2027. |
Guided on earlier calls, and what was filed
| What | For | Guided | Filed |
|---|---|---|---|
| FY26 revenue target | FY26 | at least ₹1,500 cr (on the Q3 FY26 call) | ₹1,376 cr, below the range |
Filed figures are summed from the company's own quarterly results for the whole period (EBITDA excludes other income); where one sits against what was guided is arithmetic, not a judgement.
The business
By business
Solar EPC
Largest segment; order book ₹1,674 cr with 272 MW project completing in June plus 70 MW more, taking commissioned capacity from 600 MW AC to ~1.5 GW by year-end.
Order book ₹1,674 cr · Capacity 600 MW AC end-FY26 · Target 1.5 GW AC by year-end
Outlook: 14-month execution cycle; facing copper +40%, aluminum +50%, steel headwinds in FY27.
BESS EPC & IPP
Strategic focus area; existing orders at NTPC thermal stations (Solapur, Unchahar) of 514 MWh / ₹5 bn including O&M, plus broader order book of ₹1,136 cr.
Order book ₹1,136 cr · Ongoing projects 582 MW AC, 1.2 GWh DC · NTPC orders 514 MWh, ₹5 bn including O&M
Outlook: FY27 revenue guided ₹800-1,000 cr at 14-15% PBT margin; most projects to complete by March 2027.
BESS Manufacturing
3.4 GW automated BESS facility at trials stage using KUKA Robotics; ₹55-60 cr capex already incurred; potential full-capacity output 740 containers/year at ₹4.5 cr each.
Capacity 3.4 GW · Capex ₹55-60 cr · Full-capacity output 740 containers/yr at ₹4.5 cr each
Outlook: Full capacity revenue potential ~₹3,000 cr/year; primarily supports own EPC order book.
Solar Module Manufacturing
1.5 GW Roorkee facility commenced operations in FY26 after ALMM approval in Dec 2025; makes 600-750W top-1 panels; capex ~₹146 cr.
Capacity 1.5 GW · Capex ~₹146 cr · Current NTPC REL order 600 MW
Outlook: Break-even at 30-35% utilization; current 40-45% utilization, targeted 60-65% as orders add.
Solar Cell Manufacturing (planned)
1.2 GW solar cell line at Pandhurna under development; ₹430 cr earmarked from IPO; cell line construction to start June 2026.
Capacity 1.2 GW (planned) · Funds earmarked ₹430 cr
Outlook: Commercial operations targeted June 2027; fund utilization to ramp from Q3 FY27.
Balance sheet, capex and funding
- Net worth ₹844.8 cr as of March 31, 2026
- Debt-to-equity ratio at 0.3x
- Module line capex ~₹146 cr already incurred
- 3.4 GW BESS facility capex ₹55-60 cr already incurred
- Solar cell line: ₹430 cr earmarked from IPO; no spend yet, Q3 FY27 expected to ramp once equipment ordered
- Working capital access cited as critical for bidding capacity
The industry, as management sees it
India's RE sector entering a structurally stronger phase — solar capacity projected to reach ~348.57 GW by 2031 and BESS demand from 30 GW to ~250 GW by FY32. ALCM2 implementation from June 2026 will create a 6–12 month DCR cell shortage, easing by FY27–FY28 as domestic capacity comes up. PPA cancellations and connectivity constraints are slowing tender flow in the near term; PSU tenders were ~40 GW last year. Management expects solar market to make a "very, very fast and large comeback" by end-FY27 once BESS scales and grid connectivity is resolved.
Risks management named
- War-driven commodity inflation (copper, aluminum, steel) pressuring solar EPC margins
- Forex headwind — USD/INR moved from 85–86 to 96, hitting imported BESS inputs
- Short-run DCR/ALCM2 solar cell shortage of 6–12 months; some project delays likely
- Connectivity/grid evacuation constraints delaying broader tender pipeline
- PPA cancellations and delays by PSUs/DISCOMs post-L1 bidding
Q&A
Q&A was friendly and clarifying in tone — analysts probed guidance achievability, margin walk, BESS economics, manufacturing ramp, and policy headwinds (ALMM/DCR) without aggressive confrontation. The most-discussed topics were FY27 revenue/margin guidance (8–11% range) and the BESS pivot with its 14–15% PBT margin profile. Management visibly pushed back on the thesis of long-tenor O&M as a strategy and on assuming current margins can be sustained given commodity and FX headwinds. No analyst escalated a governance concern; the SJVN dispute was acknowledged but treated as a work-in-progress receivables item.
Not answered directly
- Quarterly revenue ramp-up trajectory (Q3/Q4 split) — management declined to give specifics
- FY27 order inflow – management said hard to predict given reverse bidding
- Annual DCR module demand industry-wide – management said first year makes it hard to quantify
- R&D spend as a specific financial line item – not separately reported
Asked for a number, answered without one
- FY27 quarterly/H1-H2 revenue split: Said Q1, Q2 are weak and Q3, Q4 are very strong, but declined to give a specific H1/H2 split, calling it 'very difficult to predict'.
- FY27 new order inflow: Declined to give a number; most business comes via reverse bidding from PSUs, calling prediction 'very difficult'. Pointed to slide 12 trajectory.
- Annual DCR module demand in India: Declined to give a number; company does not operate in rooftop, KUSUM or solar pumps, so predicting overall yearly DCR demand is 'very difficult'.
Every question, with its answer
1. FY27 guidance & margin walk
Keshav, BHH Securities
Question. Last time, you discussed a INR1,500 cr top line with 11% PAT margin target. We are at 8–8.5% PAT margin and top line is not close. Can you comment and what is the guidance for FY27?
Answer, Kartik Teltia, Managing Director. Top line is ~INR1,376 cr (INR1,416 cr with other income). On margins, EPC business PAT margins are ~10.5%, among the best in the industry. Module business got ALMM approval only in December 2025, so 2–2.5 months of operations led to slight loss; will be covered this year. Q4 was challenging across the industry with raw material prices up significantly due to the war. Margins could have been better without them.
Follow-up. Can you give us guidance for next year? What is the broad top line and margin outlook?
Answer. Order book ~INR2,800 cr; targeting 70–75% execution in current year. If war subsides, hope to carry current margins; otherwise downside. Overall margins guided 8–11%.
2. Project commissioning cadence
Dhruvin Shah, HDFC Securities
Question. Slide 7 shows completed project capacity unchanged through the quarter, but we have recorded revenues. How should we read this?
Answer, Kartik Teltia, Managing Director. Capacity adds only after full commissioning. ~272 MW project to be completed in June 2026 plus another 70 MW also in June — adding to 348 MW will take completed capacity to ~600 MW next month; could be ~700 MW by next quarter and ~1.5 GW by year-end.
Follow-up. On SJVN dispute — we filed INR219 cr claims with DAV works and have INR52 cr as receivables on books. Is INR52 cr the amount we are actually expecting?
Answer. We can only book invoices as revenue under accounting rules. Filed for idle charges, loss of profit and interest on delayed payments with SJVN, but amounts are booked only after Dispute Resolution Board award. Recoverable amount should be materially higher than recorded.
3. Other expense spike
Deepak Poddar, Sapphire Capital
Question. Why was there a very high spike in other expense in Q4?
Answer, Kartik Teltia, Managing Director. Other expense moved from INR74 mn to INR83 mn — not a high spike. Last year had ~INR140 mn write-off on a private customer which has been recovered this year (shown in other income). Sequentially the expense is actually lower.
Follow-up. What is the capex involved for the 3.4 GWh BESS capacity and what is its revenue potential and margin profile?
Answer. BESS capex ~INR55–60 cr — already spent; line under trial. At full capacity, ~740 containers/year at ~INR4.5 cr each = ~INR3,000 cr revenue potential. BESS margins typically 14–15% PBT — better than solar.
4. Module line utilisation & break-even
Pahal Sharma, DD Capital
Question. With the 1.5 GW module facility operational, how should we think about utilisation ramp-up over next few quarters and medium term? What utilisation for break-even?
Answer, Kartik Teltia, Managing Director. Module line installed capacity 1.5 GW; break-even at ~30–35% utilisation — appears low but capex on line was only ~INR146 cr vs. higher for competitors. Currently have 600 MW order from NTPC Limited / NTPC REL giving ~40–45% utilisation; targeting 60–65% as order book expands.
Follow-up. How much of the existing EPC order book can be serviced through in-house modules?
Answer. 100%. The 600 MW current order will come entirely from the module line. Last year, ALMM approval only in December 2025 forced us to buy panels externally; this year that issue is gone — line running to supply existing customers.
5. ALMM/ALCM2 industry capacity gap
Karan Sanwal, Niveshaay
Question. With ALMM notification out, does the country have adequate cell and module capacity? What's the gap?
Answer, Kartik Teltia, Managing Director. ALCM2 applicable from June 2026; projects bid after August 31, 2025 must use ALCM cells. 90–95% of projects will need to shift to DCR cells. Short-run 6–12 months could see cell shortage; capacity coming up; FY27–FY28 constraints will reduce. Some may get delayed, but not stark. Solarworld's current order book has no ALCM2 orders — headway of ~1 year; own cell line should be up by then.
Follow-up. When do we expect utility-scale DCR-compliant orders to start flowing? Does BESS increase module demand per project?
Answer. Post-Aug 2025 PPA bidders have 14–24 months to execute; end of FY26 / early FY27 demand likely. Module deployment per project varies — some FDRE tenders use more panels, some less; overall solar panel deployment in country should increase with BESS enabling grid stability.
6. O&M strategy
Darshan Shah, M&S Associate
Question. EPC projects are typically bundled with long-term O&M — stable, high-return. What's management's view on O&M as a long-term revenue vertical?
Answer, Kartik Teltia, Managing Director. View is actually opposite. O&M contracts only 3 years post-installation; tenders do not require long-term O&M. EPC margins are better than O&M margins. Example: 100 MW project = INR250–300 cr EPC revenue; O&M over 3 years only INR7–8 cr with similar manpower. Strategy: Solarworld does not actively bid for O&M contracts.
Follow-up. How do you see the landscape changing under ALMM/DCR/PLI? Are input costs going to spike, and how does that affect you?
Answer. Not difficult for Solarworld — already invested in ALMM module line; raised capital for ALMM2 cell line (June 2027). Currently no DCR orders. Will have full in-house capacity when DCR orders come — uniquely positioned as India's only backward-integrated EPC. DCR is pass-through to developer in new bids; for me, margin protection comes from bidding at current elevated prices.
7. Module manufacturing in revenue build
Tejas Khandelwal, Prudent Equity
Question. FY27 INR1,950 cr execution from order book — will we add anything from BESS and module on this top line?
Answer, Kartik Teltia, Managing Director. Whatever is manufactured in solar panel factory is used for in-house EPC. When you look at console numbers, there is an elimination — does not add to top line but adds to margin.
Follow-up. We have not spent anything from IPO funds for solar cell. What's the reason? Any ballpark for FY27 order inflow? Internal target for revenue/profit in 2–3 years?
Answer. Solar cell funds are dedicated; being used for utilities and machines. Civil construction starting in June; funds will be utilised once 1–1.5 months into construction. Order inflow hard to predict given PSU reverse bidding mechanism. Internally, vision to be India's biggest EPC with state-of-the-art backward manufacturing — expect 40–45% growth this year and hope to sustain margins.
8. Capacity expansion & PPA cancellations
Harshit Sachdeva, Columbus Capital
Question. If you want to expand module and cell lines 2–3 years later, what timeline and cost? Also, do you see any PPA cancellations by PSUs?
Answer, Kartik Teltia, Managing Director. Strategy: set up lines only when visibility for 75–80% captive consumption in 1–2 years. No current intention to expand module or cell capacity. On PPAs — yes, PSUs/DISCOMs rescinding after L1; issues are BESS scaling for power absorption and lack of connectivity. Govt has pushed substations; should resolve in 12 months; by end FY27 solar market should make a big comeback.
Follow-up. If you had to expand from 1.5 GW to 2.5–3 GW with civil already done, how long and cost? What's the R&D spend?
Answer. Module line took 6–8 months originally (Nov 2024 start); IEC change delayed ALMM. Expect to replicate faster now — maybe 6 months. Cell line — first time, will share post-experience. R&D not shown separately in financials; technical team continuous; target shift from 620/625W to 700W panels.
9. Order book conversion & quarterly ramp
Deepak Patil, Equintis Wealth Advisory
Question. What proportion of total order book will convert to revenue in FY27? BESS is faster — quarterly revenue ramp-up trajectory?
Answer, Kartik Teltia, Managing Director. Order book ~INR2,800 cr; targeting at least 70% execution = ~INR2,000 cr. BESS execution 11–12 months; solar EPC 14 months (extensions if land handover delayed). BESS revenue FY26 was zero; FY27 target INR800–1,000 cr. Solar EPC ~INR1,250 cr FY26, fairly constant. Q1, Q2 weak; Q3, Q4 very strong — pattern should sustain. Quarterly ramp hard to predict specifically.
Partly answered.
10. EPC pipeline, ROW & labour
Anuj Upadhyay, Investec
Question. How is the EPC pipeline framed this year given volatile markets? ROW for transmission lines — has it been sorted? Labor issues?
Answer, Kartik Teltia, Managing Director. Tendering market slower than last year due to connectivity lag. But order book quite full. PSU tenders ~40 GW last year; we execute 1–1.5 GW/year — limited effect on our intake. ROW compensation now at market rates — speeds up process; earlier was circle rates not frequently updated. Not the biggest hurdle. Biggest hurdle is BESS scaling for grid stability, and connectivity taking 10–12 months. No major labor issues observed.
11. Margin outlook with backward integration
Dhruvin Shah, HDFC Securities
Question. With our module line going and BESS margin guided 14–15%, won't margins improve because of in-house module coming in?
Answer, Kartik Teltia, Managing Director. BESS margins will improve. On EPC, copper up ~40% from Oct 2025, aluminum up ~50%, steel prices also up — headwinds in metals. Hoping to sustain margins; could improve if West Asia normalises, could decline if prices keep rising. Range 8–11%. Most BESS raw material imported; USD/INR from 85–86 to ~96 also impacts margins.
What was said
Topic by topic, in the order it was spoken
Industry Context & Market Opportunity · Kartik Teltia (MD)
- India RE sector in structurally stronger phase over past 12–18 months — moving from capacity-led to reliability, grid stability, integrated solutions
- India solar capacity projected to reach 348.57 GW by 2031; global solar capacity expected to exceed 7 TW by decade-end
- BESS demand expected to grow from 30 GW to 250 GW by FY32 — significant shift from standalone solar to solar + storage
- FY26 union budget raised solar allocation by ~32%; PM Surya Ghar, PM KUSUM, National Green Hydrogen Mission support adoption
- CERC-GNA framework amendments improving transmission access for storage-backed renewable projects
FY26 Strategic Milestones · Kartik Teltia (MD)
- FY26 a defining year — sector moving toward solar generation + storage + execution + domestic manufacturing
- Energy storage as key strategic priority; targeting 60:40 BESS-to-solar EPC revenue mix
- Ongoing BESS projects aggregate 582 MW AC, 1.2 GWh DC — meaningful progress in fastest-growing RE segment
- Key BESS EPC orders at NTPC thermal stations (Solapur, Unchahar) — 514 MWh aggregate, ~INR5 bn including O&M
- NTPC REL BOS package secured for 260 MW DC Bikaner project — ~INR2 bn including O&M; marquee PSU win
Order Book Composition · Kartik Teltia (MD)
- Total order book ~INR2,800 cr — provides healthy revenue visibility over coming quarters
- INR1,600 cr from solar EPC and O&M projects; INR1,100 cr from BESS, EPC and IPP-related projects
- Well-balanced mix across solar EPC, O&M, and battery storage — diversified business portfolio
- Order of June 2017 for 600 MW from NTPC Limited / NTPC REL to supply from in-house module line
Manufacturing & Backward Integration · Kartik Teltia (MD)
- 1.5 GW Roorkee solar module facility operational; spread across 7.5 acres; ATW and Horad automated; 600W–750W panels across M10R, G12R, G12 configs
- 3.4 GWh fully-automated BESS manufacturing facility ready with KUKA Robotics — trials underway; capex ~INR55–60 cr
- 5 GW junction box manufacturing JV — site ready for trials
- 1.2 GW solar cell facility at Pandhurna — under development; commercial operations targeted June 2027
- Backward integration will improve margins, reduce supply-chain risk, mitigate ALMM-linked volatility
R&D, Innovation & Strategic Direction · Kartik Teltia (MD)
- R&D focus on higher-efficiency solar modules and advanced technologies
- Strategy: shift from 620/625W panels to 700W panels — few competitors at this scale
- Strategic partnerships as growth pillar — access to advanced tech, distribution, cost efficiency
- Customer base expansion across PSU and private segments to reduce client concentration
- Vision to be India's biggest EPC company with state-of-the-art backward manufacturing
Q4 FY26 Financial Performance · Mukut Goyal (CFO)
- Q4 FY26 revenue INR591 cr (+235% YoY); EBITDA INR73 cr at 12.1% margin; PAT INR49 cr at 8.1% net margin
- Better supply-chain optimisation and favourable input cost management supported margins
- FY26 revenue INR1,416 cr (+157% YoY); EBITDA INR187.9 cr at 13.3%; PAT INR120.4 cr at 8.5% net margin
- FY26 EPS profitability reflects execution strength across solar EPC, manufacturing, energy storage
Balance Sheet & Capital Strategy · Mukut Goyal (CFO)
- Net worth INR844.8 cr as of March 31, 2026; total debt-to-equity at 0.3x
- Financial strategy emphasizes capital efficiency, cash-flow generation, capacity-addition visibility
- Strong revenue momentum and expanding profitability targeted in coming quarters
- Approach guided by product, financial management, operational excellence, long-term shareholder value
In their words
If the war situation subsides, we are hoping to maybe carry on our current margins to the current year.
We went from INR550 crores to about INR1400 crores this year.
We expect to grow by around 40%-45% this year as well. And we hope to maintain it.
To check next time
What management committed to on this call, or the dates they gave.
- FY27 order book execution progress toward 70-75% (~₹1,950-2,000 cr) target
- BESS revenue ramp to ₹800-1,000 cr from zero last year
- Module line utilization rising from current 40-45% toward 60-65% target
- 1.2 GW solar cell line construction progress (commercial ops targeted June 2027)
- Raw material cost trajectory as war situation evolves; copper, aluminum, steel
- Q1 FY27 margin performance given the 8-11% full-year band
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Tue 26 May 2026 | ₹216.30 | −2.97% | −0.49% |
| 5 sessions Tue 2 Jun 2026 | ₹204.02 | −8.48% | −2.28% |
| 20 sessions Tue 23 Jun 2026 | ₹184.97 | −17.03% | −0.86% |
From the close of Mon 25 May 2026, ₹222.93: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.