Titagarh Rail Systems Q4 FY26 earnings call
In brief
Titagarh exits Ferrovia, sets up Titagarh Naval Systems with 25% subsidy, targets 200 passenger cars in FY27 vs 63 in FY26.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- Guidance held
- Analyst pushback
- Medium
- Stock, next session
- −2.99% (Nifty 50 −0.70%)
- Passenger rail sales scaled from 12 cars in FY25 to 63 in FY26; management targets 200 cars in FY27.
- Ferrovia investment fully exited via sale to Italian State Railways; all past and potential liabilities provided for in the books.
- Order book at ₹27,540 cr on a consolidated basis including JV share, with passenger at ₹10,600 cr standalone and freight at ₹3,100 cr.
- Cash from operations ₹380 cr in FY26 vs flat or slightly negative in FY25; passenger NWC expected to normalise to ~75 days.
- Titagarh Naval Systems incorporated as wholly owned unit; ₹610 cr project cost with 25% capital subsidy, production to start at Falta yard in FY27.
An AI read of our transcription of the recording · the filing
The numbers
The quarter, Q4 FY26
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹875 cr | −12.9% | +5.2% | |
| EBITDA (excl. other income) | ₹97.2 cr | −4.4% | +5.6% | 11.1% (10.1% a year ago) |
| Net profit | ₹53.5 cr | −17.0% | +11.1% | 6.1% (6.4% a year ago) |
| EPS (₹) | ₹3.97 | −17.1% | +10.9% |
From the company's filed results for the quarter ended 31 Mar 2026 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Bangalore Metro execution with free-issue materials inflated Q4 FY26 passenger EBITDA/EBIT margin to 19% (vs 14.3% full year); not indicative of steady-state. (one-off)
- Ferrovia sold to Italian State Railways; past and potential liabilities of the Italian subsidiary provided for in the books, removing ongoing drag on consolidated results. (one-off)
- Passenger rail business scaled from 12 to 63 cars, shifting revenue mix toward higher-margin passenger; expected to become ~70% of business by FY30.
- Supply chain constraints in gas, LDO, steel, and castings led to delays and stuck/balancing inventory items, raising inventory days.
- Shipbuilding now reported as a separate segment from freight, optically improving freight segment margin to ~12% on a like-for-like basis. (accounting)
The numbers management led with
- Consolidated order book: Rs 27,540 crore (including 49% share of wheel JV)
- Passenger cars delivered FY25 to FY26: 12 cars FY25 to 63 cars FY26; target 200 cars FY27
- Naval project cost: Rs 610 crore total; 25% capital subsidy from Government of India
- Wheelset JV contract: 80,000 wheels per annum from Indian Railways for 20 years
- Cash from operations FY26: Rs 380 crore vs flat/slightly negative in FY25
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| Passenger car production (Passenger Rail Systems) | FY27 | 200 cars in FY27 (vs 63 cars in FY26) |
| Passenger segment margin (Passenger Rail Systems) | — | similar to freight margins around 12%, enhanced with own propulsion later |
| Freight segment margin (steady state) (Freight Rail Systems) | — | twelve percent on a steady state basis over 4-5 quarters |
| Vande Bharat deliveries (Passenger Rail Systems) | FY27 | two Vande Bharat trains within this financial year |
| TNSL project cost (Titagarh Naval Systems) | — | total project cost for TNSL is about six hundred and ten crores |
The business
By business
Passenger Rail Systems
Highest-ever turnover and profitability for the segment in FY26; sales scaled from 12 cars in FY25 to 63 in FY26; Pune order defect liability period cleared; repeat order for 12 trains won.
Cars delivered FY26: 63 · Cars delivered FY25: 12 · EBIT margin Q4 FY26: 19% · EBIT margin FY26: 14.3% · Outstanding order: 522 metro coaches · Outstanding order: 1,280 Vande Bharat cars
Outlook: Targeting 200 cars in FY27; confident of two Vande Bharat train deliveries in FY27; Bangalore Metro to be completed in FY27 or early FY28.
Freight Rail Systems
Steady-state 'cruising altitude' business; 1,700 wagons produced in Q4 FY26; foundry upgraded with resin-based molding, ready for 1,000 wagons/month once orders visible.
Q4 FY26 wagons produced: ~1,700 · Pending wagon orders: 6,000-6,500 · Freight standalone order book: ₹3,100 cr
Outlook: Higher run rate than FY26 expected; steady-state EBIT margin of ~12% over 4-5 quarter view; range-bound between 600 and 1,000 wagons/month.
Titagarh Naval Systems (TNSL)
Wholly owned subsidiary incorporated; land acquired in Falta, long-term lease on adjacent concrete jetty; approved under Shipbuilding Assistance Scheme.
Project cost: ₹610 cr · Capital subsidy: 25% · Shareholding: 100% wholly owned
Outlook: Production to start within current FY; capex balance to be funded through debt-equity mix; potential strategic/financial investor and separate listing over time.
Wheel Set JV (with Ramakrishna)
Production scheduled to start in June FY27; 80,000 wheels per annum contract with Indian Railways for 20 years.
Contract: 80,000 wheels/year for 20 years · JV stake: 49%
Outlook: Confident of meeting contractual ramp-up; supplies to railways, own needs, exports and other shipyards.
Wagon Leasing
First leasing contract signed with Bhamalori for two rakes as an extension of wagon product offering.
First contract: 2 rakes with Bhamalori
Outlook: Calibrated expansion limited to safe clients; mix will include railways, private sector, and leased wagons.
Balance sheet, capex and funding
- Cash from operations in FY26: ₹380 cr (vs flat or slightly negative in FY25).
- Ferrovia: investment exited; no further liabilities beyond provisions already taken.
- Freight net working capital: ~30 days; passenger normalises to ~75 days at scale.
- Debtors ~100 days currently (passenger skew); government payments see brief delays each year.
- TNSL capex ₹610 cr; 25% capital subsidy from Government of India; balance via debt-equity mix.
- Inventory days elevated due to ramp-up and supply-chain balancing items; expected to normalise.
The industry, as management sees it
Management is highly constructive on the Indian railway capex cycle, citing ~Rs 20 lakh crore of cumulative railway investment over 8-10 years and a stated target to grow freight volumes from 1.6 billion tons to 3 billion tons by 2030. Wagon demand is framed as cruising altitude - 600 wagons per month in weak years, 1,000 in strong years - driven by replacement (4%) plus GDP-linked incremental demand (~6%). Passenger rail infrastructure (metros, Vande Bharat, high-speed) seen as multi-year structural growth area aligned with India becoming a $5-trillion economy.
Risks management named
- Supply chain constraints for gas, LDO, steel and castings - situation improving but watched
- Elevated inventory days during passenger ramp-up phase
- West Asia geopolitical situation could impact input availability
- Passenger debtor days elevated (~100 days) until operating leverage scales by end-FY27
- Project-specific gestation risk when transitioning between passenger projects
Q&A
Q&A was dominated by execution questions on passenger rail ramp-up, Vande Bharat delivery, naval launch and the Ferrema exit. Pushback was strongest around forward revenue guidance, the large wagon tender timing and inventory/debtor normalization - all of which management treated with macro-level rationale rather than specific commitments. Surprise positives: Pune Metro 12-train repeat order, confirmation of 2 Vande Bharat trains in FY27, and aluminium-coach self-sufficiency narrative. No analyst contested the bullish India infrastructure thesis.
Not answered directly
- Large wagon tender timing (Rajgarh)
- Wagon leasing volume specifics
- FY27-29 turnover outlook
- Wheelset FY27 volume
- Inventory days sustainability
Asked for a number, answered without one
- Wagon leasing volume: First order is with Bhamalori for two rakes; will calibrate to safe clients only; numbers not disclosed for competitive reasons.
- Wheel set JV ramp-up quantity for FY27: Will supply in FY27 as per contractual terms but exact quantity not stated; to be included in presentation.
- Rajgarh wagon tender timing: Cannot confirm timing; expressed broader conviction that wagon demand will come through over time.
- Forward-looking turnover for FY27-FY29: Refused forward-looking numbers; pointed to strategic plan already on website with order book mix view.
- Vande Bharat delivery within specific quarter: Between Q3 and Q4 FY27, no further narrowing.
Every question, with its answer
1. Passenger rail margins and FY27 ramp-up
Lano Balasubramanian, Meridian Capital
Question. You delivered a 19% passenger rolling stock EBIT margin in Q4 FY26 and 14.3% for full year - close to the long-term 15% guidance. How should we think about sustained margins, and how will you execute the jump from 63 cars to 200 cars (translating to ~Rs 1,500+ crore of incremental FY27 revenue)?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Sustained passenger margin should be similar to freight (~12%) rather than the Q4 spike; Q4 was inflated by Bangalore Metro free-supply material which does not hit topline. Operating leverage is high - ~150 people in design/engineering/R&D alone - so margins will improve as volumes scale. On ramp-up, we already went from 12 to 63 in FY26 and are well on track for 200 cars in FY27.
2. Wheelset JV ramp-up
Lano Balasubramanian, Meridian Capital
Question. Update on the wheelset JV - your partner mentioned production starting by end of May or June. Where do we stand and what is the FY27 ramp-up look like?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Position remains exactly as Ramakrishna stated. Production to start in June FY27 and the ramp-up plan will be fully achieved. We have an 80,000-wheels-per-annum contract with Indian Railways for 20 years, plus our own captive requirement and export/shipyard opportunities.
3. Supply chain disruption specifics
Lano Balasubramanian, Meridian Capital
Question. On supply chain disruptions, which specific materials or inputs (e.g., gas) have you faced and how is the situation now?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Standard industry-wide constraints - gas, LDO and supplier-side delays in steel and castings. Government of India has negotiated international deals that have improved the situation substantially. We remain watchful but do not expect material impact on FY27. Also hoping the West Asia situation resolves.
4. Wagon leasing order and strategy
Raj Jain, Individual Investor
Question. Color on the wagon leasing order you won - how many wagons, who is the customer, and how do you see this business scaling over 2-3 years?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Won first contract for 2 rakes from Bhamalori. Wagon leasing will only be offered to Titagarh-built wagons (no third-party leasing), and only to very safe clients to avoid credit risk. Not giving exact numbers for now due to competitive reasons - will be a calibrated offering.
Not answered directly.
5. Large wagon tender timing
Raj Jain, Individual Investor
Question. Color on the large Rajgarh wagon tender - recent newspaper reports, timing, and confidence on orders in next 3-6 months?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Cannot comment on newspaper reports. India story is intact - ~Rs 20 lakh crore of railway investment over 8-10 years must generate traffic growth. Freight target to scale from 1.6 bn tons to 3 bn tons by 2030 will drive sustained wagon demand. There can be dips; freight is a cruising altitude business (600 in bad months, 1,000 in good).
Not answered directly.
6. Passenger coach order execution updates
Parvez Qazi, Nuwama Group
Question. Update on the five major passenger coach orders - Vande Bharat, Gujarat Metro, Mumbai Metro, Pune Metro and Bangalore Metro.
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Pune: 34 trains delivered; defect liability period cleared; repeat order for 12 trains received (delivery in 2 years). Gujarat Metro: first train supplied; 34 trains/102 cars to complete in FY27. Mumbai: line 5/6 - first car body production in Q2 FY27, first train delivery Q3-Q4 FY27. Vande Bharat: 10 car bodies already made, entering outfitting; first train delivery in FY27. Bangalore: covered separately.
7. Bangalore Metro completion timeline
Parvez Qazi, Nuwama Group
Question. When will the Bangalore Metro order be completed?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Contractual delivery within FY27 if free-supply materials arrive on time, but we are considering 1-2 quarter spillover given third-party supply chain. Capacity is fungible across other metros to optimise production.
8. Pending wagon order book composition
Sandeep Mukherjee, SDB Securities
Question. How many wagons are pending in the order book and what is the private sector percentage?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Total pending ~6,000-6,500 wagons. We do not give the private vs government breakup. Aggressively pursuing bookings across private, government and leasing channels.
Partly answered.
9. Q4 wagon production
Sandeep Mukherjee, SDB Securities
Question. How many wagons were produced in Q4 FY26?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Approximately 1,700 wagons in Q4 FY26. Will be detailed in the presentation.
10. Ferrema restatement - cash impact
Amex Arda, Purnata Investment Advisors
Question. On the Ferrema restatement - is there any further cash outflow expected on this?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Ferrema is discontinued; sold to Ferrovie dello Stato. Beyond what is already invested/provided, there is no further cash outflow or losses. The FY25 Italian operating losses caused the equity investment to be impaired; that is notional, not a Titagarh cash flow item.
11. Freight margin sustainability
Amex Arda, Purnata Investment Advisors
Question. Are the improved freight margins (~12% now vs 11% previously) sustainable, given that shipbuilding has been reported as a separate segment?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Freight margins will continue in the 11-12% range on a steady-state basis. Quarter-to-quarter variations of half to one percentage point will happen based on private/public mix, price variation clauses and commodity prices. Look at it on a 4-5 quarter rolling basis.
12. Passenger ramp-up curve after prototype
Amex Arda, Purnata Investment Advisors
Question. After the first prototype of a new metro/passenger train is delivered, how long does it take to ramp up to 2-3 trains per month?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Each project has different criticality, but generally gestation is heavier in design/prototype. After prototype, there is a 2-3 month learning curve and then production ramps up. We balance production across projects to minimise disruption.
13. DHC wagon opportunity and competition
Kushnaha, Electron DMS
Question. Elaborate on the DHC (Dedicated Freight Corridor) special wagon manufacturing opportunity - target market and competitive landscape.
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. DHC should be seen as part of the extended wagon network, not a separate vertical. From time to time there will be special-purpose wagons (e.g., maintenance/inspection types). Competitive landscape does not change much across wagon types. DHC will boost overall wagon demand by removing network bottlenecks.
14. Passenger rail peak year
Kushnaha, Electron DMS
Question. Given passenger rail capacity additions in FY27, which year will we see the full potential of PRS based on current order book?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. FY27 is important, FY28 will be the year when Vande Bharat and metros are in full production simultaneously. Continuous ramp-up expected up to FY30 targets outlined in the strategic plan.
15. Order book includes wheel JV
Rajesh Patnaik, Koda Engineers
Question. Does the Rs 27,544 crore order book include the wheel order?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Yes - it includes 49% of the wheel JV order book, which is how the consolidated figure is built up.
16. Forward turnover outlook
Rajesh Patnaik, Koda Engineers
Question. Revenue was Rs 3,122 crore in FY25 and Rs 3,190 crore in FY26 - what should we expect for FY27, FY28 and FY29?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Cannot give forward-looking reactions. Passenger business was <10% of revenue in FY25, ~17% in FY26, and will continue rising to match order book mix (~70-80% passenger) over 4-5 years / by FY30. Freight stays range-bound.
Not answered directly.
17. Naval production start
Rajesh Patnaik, Koda Engineers
Question. When will naval production actually start and will turnover multiply in 2-3 years?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. New naval yard production to start within this financial year (FY27). We hope turnover multiplies in 2-3 years.
18. Project-wise wagon dispatch and outstanding
Anupur Singh, 361 Capital
Question. Can you share a breakdown of wagons dispatched out of the ~6,500 by project? And outstanding coaches/Vande Bharat order?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Do not give project-wise dispatch breakup. Outstanding passenger deliveries: 522 metro coaches and 1,280 Vande Bharat cars. Presentation will be uploaded today.
Not answered directly.
19. Vande Bharat delivery commitment
Akash Agarwal, Individual Investor
Question. Vande Bharat has been getting delayed quarter on quarter. Is next quarter the firm date for the prototype?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. No delays on our side - the initial delay was when they revised 16 vs 24 coaches specification. We have always said delivery in Q3 or beginning of Q4 of FY27. No LD or damages imposed.
20. Vande Bharat revenue recognition
Akash Agarwal, Individual Investor
Question. Once the prototype is delivered, will revenue be recognised in this financial year?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. After the prototype, we start delivering balance trains. Total 80 trains of 16 cars each, with a delivery schedule per the strategic plan presentation.
21. Vande Bharat FY27 delivery count
Kondineni Magada, Jefferies India
Question. Confirming you will deliver 2 Vande Bharat trains this year - is that fair or has the plan changed?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Absolutely fair - 2 Vande Bharat trains within this financial year.
22. Naval capex and funding
Kondineni Magada, Jefferies India
Question. Color on naval expansion - type of ships, capex and funding plan for the Falta yard?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Total TNSL project cost ~Rs 610 crore with 25% capital subsidy. Balance funded via debt + equity in TNSL. Looking at strategic/financial investors so parent outflow is limited. May look at separate listing of TNSL once stabilised. Land acquired, jetty secured, construction starting.
23. Inventory days explanation
Kondineni Magada, Jefferies India
Question. Inventory days have risen as a percentage of sales - what drove this and is it temporary?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Supply chain constraints caused balancing items inventory pile in Q1/Q2 FY26 - temporary. For passenger, we are in ramp-up mode and not actively monitoring inventory in first two quarters; will normalise once output ramps up.
24. Debtor days and cash flow
Kondineni Magada, Jefferies India
Question. Debtor days look close to 100 - what is a sustainable number? And confirm cash from operations was Rs 380 crore?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Cash from operations was Rs 380 crore in FY26 vs flat/slightly negative in FY25. On debtors: freight normalised at ~30 days; passenger will normalise at ~75 days once operating leverage scales - expected by end of FY27. Some year-end payment delays from PSU customers are routine.
25. Ferrema contingent liabilities
Kondineni Magada, Jefferies India
Question. Confirm - no further cash outflow or contingent liabilities from Ferrema?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Beyond what is already provided and taken as a hit in our books, there is no further liability or cash outflow expected from Ferrema.
26. Large tender timing and leasing customer
Virat J, Individual Investor
Question. Confidence on the large wagon tender coming in 3-6 months? And will Indian Railways be a wagon leasing customer?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Cannot answer with specific information, but provided macro reasoning: ~4 lakh wagon stock, ~4% replenishment + ~6% GDP-linked incremental = 10% annual demand. India story is intact, government committed; wagon demand must sustain.
Not answered directly.
27. Wheelset FY27 volume
Virat J, Individual Investor
Question. For the 80,000 wheelset railway contract in FY27, can we plan 30,000-40,000 wheel supply?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. As per contract terms - do not have exact FY27 number to hand but will start supply in FY27. Will try to incorporate detail in presentation.
Not answered directly.
28. Aluminium coach capabilities
Rajesh Banari, Nakoda Engineers
Question. Are you also planning aluminium-bodied metro coaches?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. Yes - Pune coaches and the repeat order of 12 trains are both aluminium. Makes us the only company in India with both stainless steel and aluminium capabilities. We have imported machines to make flat packs domestically (previously from Kirama Italy); by FY28 will be fully atmanirbhar. This also opens the high-speed train opportunity globally.
29. Coach/car unit economics
Rajesh Banari, Nakoda Engineers
Question. Confirm one coach/car = approximately Rs 10 crore?
Answer, Umesh Chaudhary, Vice Chairman and Managing Director. That is right - coach and car are the same thing.
What was said
Topic by topic, in the order it was spoken
Ferrema/Italian Subsidiary Exit · Umesh Chaudhary (Vice Chairman and MD)
- Ferrema investment fully exited via sale to Italian State Railways (Ferrovie dello Stato)
- All past and potential liabilities pertaining to Ferrovia have been provided for in the balance sheet
- No further losses or cash outflows expected on this account
- Removes a long-standing drag on consolidated balance sheet and cash flow
Titagarh Naval Systems (Shipbuilding) Launch · Umesh Chaudhary (Vice Chairman and MD)
- Carved out as wholly-owned subsidiary - Titagarh Naval Systems Limited (TNSL)
- Land acquired at Falta (South 24 Parganas, West Bengal); long-term lease taken on adjacent concrete jetty
- Approved under Government of India Shipbuilding Assistance Scheme with 25% capital subsidy sanctioned
- Production targeted to start at Falta yard within the current financial year (FY27)
- Total project cost of ~Rs 610 crore; balance to be funded via mix of debt and equity, exploring strategic investors
Passenger Rail FY26 Record Performance and Order Book · Umesh Chaudhary (Vice Chairman and MD)
- FY26 marked highest-ever turnover and profitability for passenger rail business
- Cars scaled from 12 (FY25) to 63 (FY26); FY27 target of 200 cars reaffirmed
- Standalone passenger rail order book at Rs 10,600 crore vs freight order book at Rs 3,100 crore
- Consolidated order book of Rs 27,540 crore including 49% share of wheel JV and subsidiary
Wagon Leasing, Foundry Enhancement and DFCC Wagon Execution · Umesh Chaudhary (Vice Chairman and MD)
- Wagon leasing license secured; first private-sector contract signed with Bhamalori for 2 rakes
- Three-channel strategy for wagons: railways, private, leasing - all calibrated for credit risk
- Foundry capacity enhanced with resin-based molding in both plants - ready to scale to 1,000 wagons per month castings
- Executed specialized DFCC wagons through Mitsui Japan (hydraulic/pneumatic bulk discharge) - entry into higher-tech segment
In their words
we are extremely confident of being able to get to two hundred cars in FY27
This makes us the only company in the country who has both the capabilities of stainless steel and aluminium coaches
we are very bullish of both these stories continuing in a very healthy manner, in a very forward-looking manner, and we look forward to playing our own role in the infrastructure growth
To check next time
What management committed to on this call, or the dates they gave.
- Vande Bharat prototype delivery between Q3 and Q4 FY27 (2 trains targeted for FY27).
- Wheel set JV first production in June FY27; ramp-up quarterly update.
- Titagarh Naval Systems production start at Falta yard within FY27; capex funding mix.
- Passenger car count progress toward 200 cars in FY27 vs 63 in FY26.
- Bangalore Metro order completion (possible 1-2 quarter spillover).
- Pune Metro repeat order (12 trains) execution progress.
Transcript
Read along with the recording
The whole call, 210 lines from 14 speakers over 56:53. Click any line to hear it, jump to the Q&A, or find a word. Free with an account.
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 1 Jun 2026 | ₹801.45 | −2.99% | −0.70% |
| 5 sessions Fri 5 Jun 2026 | ₹837.90 | +1.42% | −0.77% |
| 20 sessions Mon 29 Jun 2026 | ₹878.35 | +6.32% | +1.69% |
From the close of Fri 29 May 2026, ₹826.15: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.