Usha Martin Q3 FY25 earnings call

Thu 30 Jan 2025USHAMART

In brief

Management's tone
Mixed
What was said
Mixed
Guidance
First guidance issued
Analyst pushback
Medium
Stock, next session
+2.79% (Nifty 50 +0.37%)
  • Q3 FY25 EBITDA margin compressed to 16.6% from 19.7% YoY on European pricing pressure; CEO calls this the cycle bottom
  • FY26 volume growth targeted at ~12% on ~1,90,000-ton FY25 base — first explicit quantitative guidance
  • 'One Usha Martin' global integration program targets September 2025 completion for cost optimisation
  • Brunton Shaw UK model reset — finished ropes now shipped direct from India instead of via UK rope-making
  • Parvat Mala CE Certification secured; Usha Martin claims sole Indian manufacturer with ropeway capability and certification

An AI read of the company's transcript · the filing

The numbers

The quarter, Q3 FY25

This quarterA year agoLast quarterMargin
Revenue₹861 cr+8.0%−3.4%
EBITDA (excl. other income)₹143 cr−9.1%−11.3%16.6% (19.7% a year ago)
Net profit₹92.6 cr−13.9%−15.6%10.8% (13.5% a year ago)
EPS (₹)₹3.04−13.9%−15.3%

From the company's filed results for the quarter ended 31 Dec 2024 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.

The numbers management led with

  • Wire rope domestic volumes (9M): ~34,000 tons in 9M FY25 vs ~28,000 tons in 9M FY24
  • India market share growth: India market share rose ~18% YoY
  • FY25 volume base: ~1,90,000 tons total volume expected in FY25
  • FY26 volume growth target: At least 12% overall volume growth in FY26

Guidance

Guidance on this call

WhatForWhat management said
Total volume growthFY26Aimed to grow by at least 12% overall in FY26, on a base of ~190,000 tons expected in FY25
EBITDA marginFY26Base of ~18% maintained; Q3 FY25 margin of 16.6% called the bottom; improvement expected phased through Q4 FY25 to Q2 FY26 (held)
LRPC capexFY26 onwardNo capex planned for LRPC going forward
Working capital cycleFY26Expected to reduce significantly as direct shipments from India replace UK rope-making step in Brunton Shaw model

The business

The industry, as management sees it

Management sees broad-based weakness in international wire rope demand driven by recession in Germany and the UK, with Saudi rig count down by ~50 units year-on-year reducing replacement demand. The Indian outlook is mixed — strong medium-term potential from infrastructure, ropeways (Parvat Mala), bridges and high-speed rail, but short-term project execution is slower than expected. Pricing pressure expected to persist until Western economies restart infrastructure spending.

Risks management named

  • International demand slowdown — Europe, Germany and UK recession dragging replacement demand
  • Aggressive pricing from Korean, European and Southeast Asian wire rope competitors as plants run below optimum
  • LRPC segment oversupply and very thin Rs 4,000-4,500/ton contribution margins
  • Delay between Parvat Mala project announcement and actual rope offtake — 3-4 year gestation
  • Project execution slowdown in Indian infrastructure, ropeway, bridges and high-speed rail impacting offtake

Q&A

Discussion centred on three interlocking themes: (1) European wire rope pricing pressure from Korean, European and Southeast Asian competitors, (2) the 'One Usha Martin' integration programme and the Brunton Shaw UK model reset as the principal levers to defend margins, and (3) volume growth targets anchored to India market share gains, the Parvat Mala ropeway CE Certification and the Galfan and synthetic slings start-ups. Pushback was strongest on margin guidance — multiple analysts (Girik, B&K, Edelweiss, Share India) pressed on whether 18% was achievable and on the quantum of margin lift from One Usha Martin — but management held the line that Q3 FY25 was the cycle bottom and declined to commit above the 18% base. The guidance novelty was Shreya Jhawar's first quantitative 12% FY26 volume growth target on a ~1,90,000-ton FY25 base.

Not answered directly

  • Exact ballpark margin improvement from the 'One Usha Martin' programme
  • Quarterly volume guidance breakdown for FY26
  • Future capex plans for LRPC (effectively stated as zero, but framed as a non-answer)

Every question, with its answer

  1. 1. Volume growth and margin recovery in sluggish demand

    Aman Kumar Sonthalia, AK Securities

    Question. Both the Indian market and the European market are having very sluggish demand scenario. We have expanded our capacities and at the same time we are seeing margin pressure. So in this sluggish demand scenario, how will we increase our volume and at the same time improve our margins?

    Answer, Shreya Jhawar, Strategy and Growth Team. In two parts: India wire rope volumes rose from about 28,000 to about 34,000 tons in 9M FY25 driven by dealer network strength; infrastructure and ropeway demand is expected but project execution has been slower. In Europe, the slowdown is driving pricing/margin pressure, and the goal is to make the European setup leaner and more efficient to retain and gain market share.

    Follow-up. Followed up asking whether Usha Martin should shift focus away from LRPC into more profitable haulage ropes for Coal India and mining given LRPC oversupply and weak infrastructure spending.

    Answer. Jhawar agreed on LRPC demand softness; said focus is on upgrading the LRPC facility toward plasticated and galvanized LRPC for both domestic and export orders. Confirmed the company has started bidding for Coal India haulage ropes and aims to grow share at every India market opportunity.

    Partly answered.

  2. 2. Galfan (Gal Star) and UK synthetic slings project status

    Aman Kumar Sonthalia, AK Securities

    Question. What is the update of the Galfan Wire plant and the synthetic sling plant?

    Answer, Rajeev Jhawar, Managing Director. Synthetic slings plant (UK) is fully ready including the 2,000-ton through-flow testing machine; small orders have been received via De Ruiter and EMM subsidiaries; commercial production targeted Q4 FY25 with end-user approvals in the next financial year. Galfan ('Gal Star') zinc-aluminium line has been commissioned and is under trial production; stabilisation expected this quarter with full benefits from Q1 FY26.

    Follow-up. Asked about the Saudi market setup and order pipeline.

    Answer. Jhawar confirmed the team, approvals, rigging facility and distribution facility are in place; customers are happy with on-ground presence and orders have started flowing. Expects a significant increase in volume from Saudi Arabia next year.

  3. 3. European slowdown by segment + US/Australia progress + volume guidance

    Dhaval Shah, Girik Capital

    Question. European slowdown — which segments (fishing, rigs, wind) are weak? US mining material shipments — what's the progress? Australia material shipments — how is the segment performing? And given the shortfall, what volume guidance is being maintained for the year and going forward?

    Answer, Rajeev Jhawar, Managing Director. India market share rose ~18% YoY via dealer network — well prepared for domestic uptick. European elevator market is fairly stable — customers convinced to accept direct India shipments, starting this month. Fishing market strong via BS UK; 90-95% of customers ready to buy direct from India, transition targeted by September. Oil & offshore is the weak spot — Korean, European and Southeast Asian players competing aggressively on price. US and Australian mining — quality established, supplies continuing, volumes being scaled gradually.

    Follow-up. Pressed on whether competition is from South Korea and China specifically.

    Answer. Jhawar said Chinese players are not present in this market; South Korean is a key player alongside European manufacturers and Southeast Asian players.

  4. 4. Margin bottom and trajectory to 18%+

    Rajesh Majumdar, B&K Securities

    Question. How should we read the 16.6% margin? With UK restructuring and India direct shipments, employee costs should reduce — are we seeing more short-term margin pressure before returning to 18%-plus, or is this the bottom?

    Answer, Rajeev Jhawar, Managing Director. 'To be straight to you, I think this is the bottom of the margin.' One Usha Martin cost rationalisation, BS UK finished-rope model and back-office shifting to India should all help improve margins from here. September 2025 is the target completion for most initiatives.

    Follow-up. Asked about Bharat Mala (Parvat Mala) project CE Certification update.

    Answer. Jhawar said CE Certification was secured about two months ago; now in touch with various projects under tendering. Noted a big time-lag between announcement and rope offtake.

  5. 5. Transformation from metal converter to global engineering Company

    Zaki Nasar, Individual Investor

    Question. General question — your efforts are clearly aimed at transforming Usha Martin from a metal converter to a global engineering Company, with sourcing, certifications and the new logo. Thoughts on this transformation journey?

    Answer, Rajeev Jhawar, Managing Director. Described the One Usha Martin approach — integrating India and Thailand manufacturing with global distribution, rigging and service subsidiaries as 100% entities, with management-level integration to optimise total costs. Global design centre working with plants on better-designed products; strong machinery division in Ranchi helping engineering capability and plant upgrades. Confident big improvements will show up in the next 12 months.

  6. 6. Reversal of European energy-cost tailwind on margins

    Prolin B. Nandu, Edelweiss Public Alternatives

    Question. On competition — a large part of margin gains from FY21-FY24 came from subsidiaries benefiting from European manufacturers going off-stream due to energy costs. With European energy costs stabilised and competitor numbers improving, are we seeing a reversal of those trends? Will competition sustain even if demand turns?

    Answer, Rajeev Jhawar, Managing Director. Acknowledged this is the reality of the business — when demand is weak, all players want their plants running and prices come under pressure. Usha Martin is optimising costs via One Usha Martin, CAPEX programmes and a more competitive cost structure. By September all initiatives will be in place; cost advantage will continue to deliver decent margins if market improves.

    Follow-up. Asked whether the 18% EBITDA margin guidance still holds given the cost-cutting, or whether the bar should shift to 18-20% post-September.

    Answer. Shreya Jhawar said 9M FY25 is still at 17.7% margin, near 18%. Q3 is the bottom; improvement expected in phases up to Q2 FY26. 18% guidance still holds.

  7. 7. Capacity utilisation across segments

    Shraddha Kapadia, Share India

    Question. Could you share capacity utilisation for the different segments and facilities?

    Answer, Shreya Jhawar, Strategy and Growth Team. Ropes (Ranchi and overall) — 80-85% utilised. Wires — about 50% as Usha Martin has moved out of low-end wires after the steel divestment. LRPC — 70-75%, with more capacity shifting toward plasticated LRPC. Offered to take facility-level breakdown offline.

    Follow-up. Asked if Usha Martin is the only company with Parvat Mala ropeway certification in India and the potential size.

    Answer. Jhawar said Usha Martin is the only Indian company with manufacturing capability for these ropes and, to the best of knowledge, only Indian company with CE Certification. Demand is medium-to-long term given 3-4 year gestation from project announcement to first rope supply.

    Not answered directly.

  8. 8. Rupee depreciation benefit on exports

    Ishika Bajaj, Helios Capital Asset Management

    Question. Are you getting any rupee depreciation benefits in the current quarter from exports?

    Answer, Abhijit Paul, Chief Financial Officer. In the standalone financials there was some impact due to the GBP-INR exchange rate. But overall on a consolidated basis there was no impact; there was actually a slight gain in the CFS books.

  9. 9. LRPC margin profile and end-use

    Dikshi Jain, Invest Savy PMS

    Question. On LRPC margin profile and asset turn — LRPC volume is around 25-30%. Also is LRPC a replacement for TMT saria in infrastructure?

    Answer, Rajeev Jhawar, Managing Director. LRPC realisation is close to Rs 12,000-13,000/ton with direct production cost around Rs 7,500/ton and contribution of Rs 4,000-4,500/ton — 'very-very thin margins'. LRPC is NOT a replacement for TMT saria — used for post-tensioning in high-rise buildings, large bridges, high-speed rail and nuclear projects, designed by consultants.

    Follow-up. Asked what indicators management is watching for demand improvement in Europe, Korea and India.

    Answer. Jhawar said infrastructure investment in India is the key — but seeing slowdown in new orders and project execution. Internationally, recession in Germany and UK is hitting demand; needs Government spending pickup to drive infra projects.

What was said

Topic by topic, in the order it was spoken

Q3 FY25 Operating Performance Overview · Rajeev Jhawar (MD)

  • Consolidated revenue grew 8% YoY in Q3 despite a challenging global environment
  • Wire rope division contributed 73% of total consolidated revenue and grew 9.8% YoY
  • Wire segment grew 17.6% YoY — best-performing segment
  • LRPC segment declined 1.4% YoY on softer demand
  • Value-added products were 71% of wire rope revenue in 9M FY25 (corrected from 70%)
  • International markets were 55% of total revenue in 9M FY25; elevator sector was an encouraging contributor

Margin Pressure and International Headwinds · Rajeev Jhawar (MD)

  • EBITDA margin compressed to 16.6% in Q3 FY25 vs 19.7% in Q3 FY24
  • Pricing softness and margin pressures in international geographies drove the decline
  • Focus on value-added segments maintained steady contribution from core sectors
  • Management positioned the quarter for recovery in the next fiscal despite the softness

Capacity Expansion — Ranchi, Thailand, UK, Saudi · Rajeev Jhawar (MD)

  • Ranchi plant expansion on track with expected volume ramp-up
  • Thailand plant expansion progressing with volume ramp-up expected
  • UK synthetic slings capex progressing; commercial operations targeted for Q4 FY25
  • Digitalisation and automation investments continuing across plants
  • Saudi Arabia rigging and distribution facility established; orders beginning to flow

Post-Steel Divestment Turnaround Recap · Rajeev Jhawar (MD)

  • Steel business divestment reduced debt and laid the turnaround foundation
  • Refocused on specialty wire rope — capacity, product mix and international market share all improved
  • Steps enabled steady growth and operational improvements visible today
  • Set up the 'next phase' via the One Usha Martin programme

'One Usha Martin' Global Integration Programme · Rajeev Jhawar (MD)

  • Programme to operate as one cohesive Company rather than separate regional businesses
  • Centralising procurement across geographies for economies of scale and standardised input quality
  • Streamlining logistics with centralised negotiation and global supply-chain rate agreements
  • Shifting back-office support functions from high-cost subsidiaries to India
  • Aimed at future-proofing, competitive advantage, margins and operating leverage

Brunton Shaw UK Model Reset · Rajeev Jhawar (MD)

  • Existing model — India-made wire and strand shipped to UK for rope production — established trust with premium customers
  • Next step: for selected product categories, finished ropes will be supplied directly from India
  • UK will remain critical for specialised large-diameter crane ropes used in oil & offshore
  • Implementation has started; target completion September 2025
  • Expected benefits: cost efficiency, reduced working capital, faster deliveries

CFO Financial Recap — Q3 and 9M FY25 · Abhijit Paul (CFO)

  • Q3 consolidated net revenue Rs 860.5 cr, +8% YoY from Rs 797.1 cr
  • Q3 operating EBITDA Rs 142.7 cr vs Rs 157.1 cr; margin 16.6% vs 19.7% YoY
  • Q3 PAT Rs 92.3 cr vs Rs 107.5 cr
  • 9M FY25 revenue Rs 2,578.1 cr, +7.6% YoY; PAT Rs 305.4 cr vs Rs 317.8 cr
  • Net debt Rs 168 cr at 31 Dec 2024 — 28% of annualised operating EBITDA
  • Capex on Ranchi, Thailand and UK progressing within manageable debt levels

In their words

To be straight to you, I think this is the bottom of the margin. And with the various initiatives of 'One Usha Martin' where we are looking at rationalizing our cost across all our subsidiaries, all this should only help us get better from here.
Rajeev Jhawar (Managing Director, Usha Martin)
Over the next year as well with support from these core segments as well as some of these other initiatives we talked about that hopefully will reduce our cost base and make us more competitive, we do aim to grow by at least 12% overall.
Shreya Jhawar (Strategy and Growth, Usha Martin)
I don't see the LRPC as a commodity. Our whole objective is to convert as much as possible into plasticated and galvanized LRPC, which provides much higher value addition. … we don't see the Company focusing on this as an area for growth in the future.
Rajeev Jhawar (Managing Director, Usha Martin)

Transcript

No transcript is filed yet. Companies usually file one within a week of the call.

The stock after the call

After the callCloseStockNifty 50
Next session Thu 30 Jan 2025₹350.45+2.79%+0.37%
5 sessions Tue 4 Feb 2025₹319.80−6.20%+2.49%
20 sessions Tue 25 Feb 2025₹292.40−14.24%−2.66%

From the close of Wed 29 Jan 2025, ₹340.95: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.

Usha Martin's other calls