Western Carriers (ind) Q4 FY25 earnings call
In brief
FY25 revenue rose 2.4% to ₹1,726 cr as domestic volumes grew 31% offsetting EXIM's 12% decline; FY26 capex planned at ₹100 cr.
- Management's tone
- Confident
- What was said
- Leaned positive
- Guidance
- None given
- Analyst pushback
- Low
- Stock, next session
- +0.45% (Nifty 50 −0.30%)
- FY25 revenue rose 2.4% YoY to ₹1,726 cr; EBITDA ₹120 cr (~7% margin), PAT ₹65 cr (3.8% margin).
- Domestic volumes surged 31% YoY to 79,840 TEUs; EXIM volumes fell 12% to 1,33,635 TEUs.
- FY26 capex planned at ~₹100 cr (vs ₹70 cr in FY25); order book includes ₹1,089 cr 4-year Vedanta contract.
- Q4 FY25 domestic volumes 19,824 TEUs vs 15,078 in Q4 FY24; EXIM Q4 35,532 vs 38,853.
- Margins expected to improve steadily in FY26; no formal revenue/EBITDA guidance given yet.
An AI read of the company's transcript · the filing
The numbers
The quarter, Q4 FY25
| This quarter | A year ago | Last quarter | Margin | |
|---|---|---|---|---|
| Revenue | ₹429 cr | — | −3.3% | |
| EBITDA (excl. other income) | ₹24.9 cr | — | +6.6% | 5.8% |
| Net profit | ₹0 cr | — | — | 0% |
| EPS (₹) | ₹1.32 | — | +18.9% |
From the company's filed results for the quarter ended 31 Mar 2025 (consolidated), not from the call. EBITDA here excludes other income, so it can differ from the figure management quotes.
What moved the numbers, as management explained it
- Domestic volume +31% YoY (60,863 to 79,840 TEUs) drove stable performance despite EXIM weakness.
- EXIM volume -12% YoY (1,51,637 to 1,33,635 TEUs) from geopolitical disruptions and transshipment delays.
- Specialized container and equipment capex of ~₹70 cr in FY25 (300 FEUs procured) to support domestic growth.
- Other income boost from IPO funds parked in FDs (~₹156 cr unutilized); not a recurring base. (one-off)
- Working capital cycle stretched as project rollouts extended to 120-150 days vs 90-120 days historically.
- Margin pressure from EXIM weakness offset by stable diesel and rail freight costs.
The numbers management led with
- Mega order — Vedanta 4-year supply chain contract: INR 1,089 crores
- FY26 planned capex: ~INR 100 crores (largest in company history, vs INR 70 cr in FY25)
- Domestic volume growth (FY25 YoY): +31% to 79,840 TEUs (vs 60,863 in FY24)
- Multimodal logistics market size (1Lattice reference): INR 1,714 bn in FY24 projected to INR 4,667 bn by FY29 — 22% CAGR
Guidance
Guidance on this call
| What | For | What management said |
|---|---|---|
| FY26 capex | FY26 | We are intending to do a capex of approximately INR100 crores in this financial |
| FY26 EBITDA margin trajectory | FY26 | we expect the margins to improve steadily through this financial year |
| FY26 PAT | FY26 | we expect overall improvement not only in EBITDA, but also in the PAT numbers |
| FY26 domestic volume growth (Domestic logistics) | FY26 | I'm very confident that we'll have a very strong growth in domestic primarily based on the utilization of specialized containers |
| FY26 EXIM volume recovery (EXIM logistics) | FY26 | I don't see EXIM numbers reducing any further... the only way up is for the EXIM numbers to improve from here |
| FY26 working capital improvement | FY26 | we expect our working capital cycle also to substantially improve in FY26 |
The business
By business
Domestic logistics
Volumes up 31% YoY at 79,840 TEUs; 300 FEUs procured for steel, aluminum, MSME; new rail services to Bengaluru, Jaipur launched.
FY25 volume 79,840 TEUs · Q4 FY25 volume 19,824 TEUs · 300 FEUs procured · Volume growth 31% YoY
Outlook: Very strong growth expected; FY26 to be a stellar year domestically.
EXIM logistics
Volumes fell 12% YoY to 1,33,635 TEUs hit by Red Sea disruptions, congestion at transshipment ports, geopolitical tensions.
FY25 volume 1,33,635 TEUs · Q4 FY25 volume 35,532 TEUs · Volume decline 12% YoY
Outlook: Volumes expected to recover as shipping routes normalize; bottom reached.
Balance sheet, capex and funding
- FY25 capex ~₹70 cr on specialized containers, reach stackers, forklifts, commercial vehicles.
- FY26 capex planned at ~₹100 cr, intended to be the largest in the company's history.
- IPO funds unutilized at ~₹156 cr (out of ~₹400 cr primary) parked as FDs; to fund part of FY26 capex.
- Working capital cycle stretched as project rollouts lengthened to 120-150 days from 90-120 days.
- No specific debt or net cash position stated on the call.
The industry, as management sees it
Management sees a clear path to recovery: India GDP rebounded to 6.2% in Q3 from 5.4% in Q2, retail inflation at a 6-year low of 3.3%, government infra/defense/power spending picking up, and the Northern Dedicated Freight Corridor expected by end-2025. Global outlook is more cautious — short volatility likely through the first two quarters of FY26 (Red Sea route reopening, US tariff actions) followed by a sustained growth phase. The rail-road multimodal market is projected to grow at 22% CAGR through FY29 per 1Lattice.
Risks management named
- EXIM recovery timing dependent on volatile Red Sea/Middle East situation and US tariff actions
- Project launch timelines stretched to 120-150 days vs historical 90-130 days
- Vizag port congestion affecting operations
- Working capital cycle elongation tied to new project ramp-ups
Q&A
Q&A covered seven analysts across ~12 exchanges. Discussion was light on pushback and broadly informational. Key dynamics: management withheld formal FY26 revenue/EBITDA guidance citing geopolitical uncertainty but signalled a 'stellar' year and steady margin recovery; the Vedanta INR 1,089 cr mega-order and raised FY26 capex to ~INR 100 cr were the standout disclosures. AI tools, CARE rating migration to CRISIL, IPO proceeds deployment (INR 156 cr still in FDs) and EXIM bottoming out at 1,33,635 TEUs were the other notable threads.
Not answered directly
- FY26 formal revenue/EBITDA guidance (deferred to next quarter)
- AI tool pilot timeline (no firm date given)
- Quarterly volume break-up for prior year (data not available)
Asked for a number, answered without one
- FY26 revenue/EBITDA guidance: It would be very foolhardy of me to come up with strong guidance... Maybe if the situation is far more predictable, maybe in the next quarter I would like to give a guidance.
- AI tools go-live timeline: I don't have currently an exact timeline in which we will be able to pilot these AI projects, but it's something which is in our visibility.
- Q1 FY26 EBITDA/PAT margin recovery: We expect margins to improve steadily in this financial year... we expect overall improvement not only in EBITDA, but also in the PAT numbers.
Every question, with its answer
1. Technology / TMS rollout
Vivek Gupta, Star Investments
Question. What is the progress on the rollout of your transport management system and what benefits have been seen?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. We are continuously updating our software and working on new TMS initiatives. Two or three data launches have been done; modules being piloted and most expected to come to fruition next quarter, with full go-live by Q3. Benefits expected: faster payrolls, quicker billing cycles and a large data bank providing visibility for the company and its customers.
Follow-up. How many B2B clients are active on your platform and how is engagement trending?
Answer. Our software piggybacks on client systems — we don't run a unilateral platform. We customise MIS/reports (daily/weekly/monthly) to each customer's spec through dedicated account managers. Our motto is 'Delivering Trust' and reports are flexible and customer-defined.
2. AI / capacity planning
Vivek Gupta, Star Investments
Question. Are you piloting any AI-based tools for capacity planning or ETA forecasting? When can we expect them to go live?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. We are working on a couple of AI modules but candidly have not had great success yet. Areas of hope: predictive models for warehousing, supply chain management and re-logistics. Internal teams continue to explore customised solutions; no firm timeline for pilot yet.
Not answered directly.
3. Network utilisation / freight corridors
Isha Murti, IM Capital
Question. Could you provide insights into trends in network utilisation over the last two quarters — how have major freight corridors performed on load volumes, route efficiency and capacity utilisation?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Mixed year. Challenge: Vizag Port congestion due to increased volumes. Positive: Eastern Freight Corridor live and showing good transit reduction; Northern Dedicated Freight Corridor ~75-80% done, with Varnama-Baroda section working and Baroda-JNPT work in full swing — expected completion Dec 2025 or Mar 2026. Will benefit North Indian EXIM customers.
Follow-up. What specific steps are being taken to reduce empty-mile running and improve back-haul efficiency?
Answer. Given large volumes, we use triangulation to minimise empty hauls — internal tracker links rake arrivals to repositioning near discharge points. Lower cycle time = lower empty hauls. Continuous optimisation lever for returns.
4. FY26 guidance
Rahil S, Crown Capital
Question. What is your guidance or outlook in terms of revenue growth and EBITDA margins for FY26?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. It would be foolhardy to give strong FY26 guidance given ongoing geopolitical uncertainty and recent de-escalation of hostilities. Maybe in the next quarter once the situation is more predictable. But we expect a stellar year on strong domestic demand and green shoots in EXIM; FY26 could return to EXIM numbers of earlier years.
Follow-up. If not exact numbers, is there any scope for margin improvement given promising demand?
Answer. Yes — we expect margins to show stability in FY26 and to slowly improve back toward the earlier delivered numbers that were supported by EXIM. Steady improvement expected through the year.
Not answered directly.
5. Credit ratings
Gunit Singh, Counter PMS
Question. CARE Ratings had marked the issue as non-cooperating for short-term and long-term borrowing facilities — what is the reason?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. We have already withdrawn the CARE ratings. We had two agencies — CARE and CRISIL. CRISIL continues with us and our rating is a strong A-minus. The CARE matter has already been resolved and we are far from them.
Follow-up. EXIM TEUs dropped YoY in FY25. Do we expect them to drop further given higher tariffs and trade wars, and what visibility do we have?
Answer. EXIM retracted ~12% from ~1,51,000 to ~1,34,000 TEUs due to tough geopolitics. We are a derived industry. Prospective return of ships through Red Sea (instead of Cape of Good Hope) would lower TUE per mile ~6% and dramatically improve EXIM. Wait and watch on Middle East, but confident short-to-medium term will improve; we have likely reached the bottom.
6. Domestic growth outlook
Gunit Singh, Counter PMS
Question. Given 30% jump in domestic numbers and better visibility, can we expect similar growth in FY26?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Cannot promise the same 31% growth — that was a stellar year (60,800 to ~80,000 containers). But we are very confident of strong domestic growth driven by utilization of specialized containers and several large projects in the space. Few headwinds seen here.
Follow-up. What were the top 2-3 drivers of growth in the domestic business?
Answer. Primary driver: utilization of specialized containers — procured ~300 FEUs (40-ft) used mainly in steel; demand was strong in H2 and expected to grow. Secondary: increased domestic movement of aluminium, MSME and industrials, supported by new MSME rail services from west to south (Bengaluru) and north (Jaipur) — and Indore shortly. Tertiary: first big tanker rake project for DCM Sriram (Ankleshwar to Lanjigarh), successfully test-run earlier this month.
7. Capex outlook FY26
Gunit Singh, Counter PMS
Question. Do we have any procurement plans for specialized containers or capex plans for FY26?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Given long-term commitments (INR 1,089 cr Vedanta being the largest supply chain order in the country) and 2-3 large contracts in the pipeline, this is a good time to step up capex. FY25 capex of ~INR 70 cr was the largest ever. Plan for FY26: ~INR 100 cr capex — the largest in company history, spread across the year.
8. Quarterly volumes
Rajeev Agarwal, Sterling Capital
Question. Please share quarterly volumes of domestic and EXIM for Q4 FY25 vs the corresponding quarter last year.
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Had only this year's quarterly data, not the prior year break-up. Q4 FY25: domestic 19,824 TEUs, EXIM 35,532 TEUs. Q4 FY24 (Q4 23 referenced): domestic 15,078 TEUs, EXIM 38,853 TEUs.
9. IPO proceeds utilisation
Amit Agicha, HG Hawa
Question. IPO raised INR 492 cr — is that fully utilised or some left for capex?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Not fully utilised. A substantial portion has been deployed. ~INR 156 cr still with us, part of which will go into the FY26 capex. The balance is invested in bank FDs per norms (out of INR 400 cr primary raise).
Follow-up. Any one key insight discovered over the past three years that is very unique to this business?
Answer. Key insight: customers have become far more inclined toward multimodal logistics, especially post-COVID. Earlier, logistics was fragmented (separate rail forwarder, road transporter, CHA). Now, consolidated 3PL/4PL solution providers like us are being preferred. Per 1Lattice report, the rail-and-road multimodal market was INR 1,714 bn in FY24, projected to INR 4,667 bn by FY29 (22% CAGR). Aligned with DFC, multimodal parks and Gati Shakti.
10. Opex / margin pressure
Mamita Agrawal, ABS Investments
Question. What specific elements of opex contribute most to margin pressure and are expected to persist?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Opex splits into rail freight (for rail business) and diesel (for road first/last mile). Diesel has been more or less flat for a year — no pressure. Rail freight also stable. So short-run opex is largely fixed; don't expect dramatic change.
Follow-up. What cost realization or efficiency improvement initiatives are we taking to protect margins?
Answer. Goal is to run a tight supply chain — reduce empty hauls, reduce turnaround of assets, streamline operations. Also 'smarter man management' — e.g. one person doing two jobs with better pay rather than two hires. Margin improvement comes from sweating assets and optimising the supply chain without raising operating costs.
11. Other income
Mamita Agrawal, ABS Investments
Question. Other income increased significantly to INR 4.8 cr from INR 1.5 cr YoY — what contributed (treasury gains, incentives, one-offs)?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Mainly interest income on IPO money parked in bank FDs per norms. ~INR 156 cr still unutilised from the IPO is held in FDs, which is the source of other income.
Follow-up. Given margin pressure, how is the receivable cycle trending, what are current working capital needs, and what steps are being taken to reduce it?
Answer. Working capital cycle has been long because of added new businesses. New project launch timelines have stretched to 120-150 days vs 90-130 historically — industry-wide, not just us. Now seeing signs of reduction; expecting working capital to streamline effectively in FY26.
12. Margin recovery drivers
Mamita Agrawal, ABS Investments
Question. Do you anticipate EBITDA and PAT margin recovery in Q1 FY26? Is it pricing/cost control or volume push?
Answer, Kanishka Sethia, CEO, CFO & Whole Time Director. Expect margins to improve steadily through FY26 on both EBITDA and PAT, with working capital also substantially improving as projects move from launch to implementation. Per-unit margins unchanged — gains come from volume + efficiency. Example: a forklift doing 100 trips for 3,000 containers — if containers rise 10% to 3,300, asset costs stay the same so margins rise incrementally. Customer problem-solving creates incremental benefit for us.
What was said
Topic by topic, in the order it was spoken
Macro context and FY25 industry backdrop · Kanishka Sethia (CEO/CFO)
- FY25 framed as a year of resilience amid geopolitical disruptions, global supply chain issues, regulatory uncertainty and an active election cycle depressing government spending
- India's merchandise exports at $437.42 bn in FY25 — essentially flat YoY (+0.08%) reflecting global trade challenges
- GDP recovered to 6.2% in Q3 from a 7-quarter low of 5.4% in Q2; retail inflation at a 6-year low of 3.3% in March; government spend picking up in infra, defense and power
International trade and EXIM outlook · Kanishka Sethia (CEO/CFO)
- Prospective return of container ships to Red Sea/Suez after US-Houthi ceasefire would add ~6% TUE per mile capacity, dramatically lowering ocean trade costs and aiding EXIM
- Cautious on near-term US tariff actions; expects short volatility through first two quarters of FY26 followed by sustained growth
- Domestic front more favourable — continued government push in critical infra, defense and power, plus formalisation, e-commerce penetration and shift to multimodal
Order book and mega contracts · Kanishka Sethia (CEO/CFO)
- >80% of revenues from clients with 3+ year relationships — high retention legacy
- Anchor order: INR 1,089 cr 4-year Vedanta contract for end-to-end aluminium/big iron/magnesium supply chain from Jharsuguda — termed the largest supply chain order in the country
- Other large wins: INR 170 cr Hindustan Zinc, INR 41 cr Tata Steel, INR 139 cr Vedanta material handling, INR 70 cr Bharat Aluminum, INR 23 cr DCM Sriram (Sriram Alkalies), INR 23 cr Lhaki Steels (Bhutan), INR 8 cr Tata International, INR 5.6 cr Brahmaputra Cracker & Polymer
- Two/three more large contracts in pipeline expected to be announced shortly
Volume performance and operational metrics · Kanishka Sethia (CEO/CFO)
- Domestic volumes +31% YoY at 79,840 TEUs (FY24: 60,863) — led by specialized container demand; procured ~300 FEUs aligned to customer specs
- EXIM volumes -12% YoY at 1,33,635 TEUs (FY24: 1,51,637) — hit by transhipment port congestion, irregular vessel schedules and geopolitical tensions
- Signs of normalisation emerging; optimistic on stronger EXIM recovery in FY26
Sector-wise demand commentary · Kanishka Sethia (CEO/CFO)
- Metals (60% of business) had a tough year EXIM-wise but domestic demand absorbed most of the impact; hopeful on sustained EXIM growth as geopolitics normalises
- FMCG & pharma (~25-30%): muted urban demand offset by improving rural on strong monsoons; benign raw materials supportive
- Industrial goods & MSME (~20%): green shoots of growth, expected to be reinvigorated by good monsoons
- New project launch timelines stretched to 120-150 days vs historical 90-130 days — industry-wide challenge
New rail services and project launches · Kanishka Sethia (CEO/CFO)
- New MSME-focused rail services ex-Western India to Bengaluru (south) and Jaipur (north) live; Indore and Kathuwas to start by month-end
- Inaugural tanker rake movement from Ankleshwar to Lanjigarh for DCM Sriram successfully test-run earlier this month — to scale
- New business development ex-Goa initiated; expected to grow this financial
- Long-term focus reiterated on Western India — India's largest production hub
Financial performance FY25 · Kanishka Sethia (CEO/CFO)
- Revenue from operations: INR 1,726 cr vs INR 1,686 cr in FY24 (+2.4%) — stable despite tough geopolitics
- EBITDA: INR 120 cr at ~7% margin; PAT: INR 65 cr at 3.8% margin — margins under pressure from EXIM but within anticipated range
- Capex of ~INR 70 cr deployed on reach stackers, forklifts, commercial vehicles and specialized containers
- Strategic priorities unchanged: long-term customer relationships, tech-driven transparency, execution excellence
FY26 outlook and DFC · Kanishka Sethia (CEO/CFO)
- Enter FY26 with strong order book, enhanced capacity and renewed optimism
- Northern Dedicated Freight Corridor expected by end-2025 (possibly Mar 2026) — to enhance transit speed, lower costs and benefit rail/multimodal players
- Domestic momentum expected to continue; EXIM hopeful on freight route stabilisation
- Closed by thanking employees and stakeholders, then opened Q&A
In their words
I don't see EXIM numbers reducing any further. I think we've reached the bottom. And the only way up is for the EXIM numbers to improve from here.
The INR 1,089 crore Vedanta order, I think, is the largest supply chain order in the country.
It would be very foolhardy of me to come up with strong guidance. So I don't want to give guidance for the entire year at this time. Maybe if the situation is far more predictable, maybe in the next quarter I would like to give a guidance.
To check next time
What management committed to on this call, or the dates they gave.
- Northern Dedicated Freight Corridor completion (expected Dec 2025 or Mar 2026).
- FY26 capex execution progress towards the planned ~₹100 cr.
- EXIM volume recovery as Red Sea container ship returns resume.
- New rail services launches in Indore (Central India) and Kathuwas (North) by May-end.
- FY26 margin improvement trajectory and Q1 FY26 EBITDA/PAT levels.
Transcript
We have not transcribed this call's recording. Read the company's transcript (PDF).
The stock after the call
| After the call | Close | Stock | Nifty 50 |
|---|---|---|---|
| Next session Mon 19 May 2025 | ₹84.49 | +0.45% | −0.30% |
| 5 sessions Fri 23 May 2025 | ₹93.52 | +11.19% | −0.67% |
| 20 sessions Fri 13 Jun 2025 | ₹105.42 | +25.34% | −1.20% |
From the close of Fri 16 May 2025, ₹84.11: the close before the call day (the call's time is not on file). Adjusted daily closes; the move includes everything else that happened in those sessions.