Models
MARG TECHNO PROJECTS LIMITEDBSE 540254Finance
-18per share · Base Model Note
Revenue growth, the horizon and scenarios are yours to change. Every other input is part of the Trader plan; saving, sharing a saved link and the live-formula workbook are part of the Institutional plan.
Scenario
Value per share, your model(18)implied P/B (0.72)× on FY26 book
Against CMP ₹9.76282.6%close of 2026-09-10
Cost of equity7.57%risk-free + beta × equity risk premium
Book equity, FY2625per share · excess returns add ₹(42)
This figure is the arithmetic of your inputs and nothing else. MarketPing publishes no fair value, target or rating; the model is yours.

Excess-return schedule · ₹ crore · book equity earns your ROE; value is book plus the returns above the cost of equity

₹ croreFY27FY28FY29FY30FY31
Opening book equity3536373839
Net income at 2.8% ROE11111
Cost of equity charge at 7.57%(3)(3)(3)(3)(3)
Excess return(2)(2)(2)(2)(2)
Present value(2)(2)(1)(1)(1)
Closing book equity3637383940
Book equity today35
PV of 5 years of excess return(7)
PV of the terminal excess return, 5% flat(53)
add non-operating investments0
Equity value(25)
÷ 1.42 crore shares(18)
ROE is at or below the cost of equity, so every year destroys value against book and the model lands below book value. That is the arithmetic, not a view.

Where the methods land · ₹ per share · the dashed line is the CMP

52-week rangetraded range, a fact not a value
951

Scenarios side by side · ₹ per share

ScenarioTemplateGrowthMarginRateTerminal₹ / sharevs CMP
Base · editingExcess returnROE 2.8%7.57%5%(18)(282.6)%
A scenario is a full set of inputs under a name. Keep Base as the filed history carried forward; add Bull and Bear by saving the current inputs under those names and moving the two or three assumptions you actually hold a view on. The distribution above draws each driver between the lowest and highest value across your scenarios, so three scenarios give it a real range; with one scenario it falls back to fixed bands.