Models
THIRANI PROJECTS LTDBSE 538464Finance
₹-4per share · Base Model Note
The horizon and scenarios are yours to change. Every other input is part of the Trader plan; saving, sharing a saved link and the live-formula workbook are part of the Institutional plan.
Scenario
Value per share, your model₹(4)implied P/B (0.61)× on FY26 book
Against CMP ₹2.94−233.0%close of 29 Oct 2026
Cost of equity6.91%risk-free + beta × equity risk premium
Book equity, FY26₹6per share · excess returns add ₹(10)
This figure is the arithmetic of your inputs and nothing else. MarketPing publishes no fair value, target or rating; the model is yours.

Excess-return schedule · ₹ crore · book equity earns your ROE; value is book plus the returns above the cost of equity

₹ croreFY27FY28FY29FY30FY31
Opening book equity1313141415
Net income at 3.7% ROE00111
Cost of equity charge at 6.91%(1)(1)(1)(1)(1)
Excess return(0)(0)(0)(0)(0)
Present value(0)(0)(0)(0)(0)
Closing book equity1314141516
Book equity today13
PV of 5 years of excess return(2)
PV of the terminal excess return, 5% flat(19)
add non-operating investments0
Equity value(8)
÷ 2.02 crore shares₹(4)
ROE is at or below the cost of equity, so every year destroys value against book and the model lands below book value. That is the arithmetic, not a view.

Where the methods land · ₹ per share · the dashed line is the CMP

52-week rangetraded range, a fact not a value
₹2₹5

Scenarios side by side · ₹ per share

ScenarioTemplateGrowthMarginRateTerminal₹ / sharevs CMP
Base · editingExcess returnROE 3.7%—6.91%5%₹(4)(233.0)%
A scenario is a full set of inputs under a name. Keep Base as the filed history carried forward; add Bull and Bear by saving the current inputs under those names and moving the two or three assumptions you actually hold a view on. The distribution above draws each driver between the lowest and highest value across your scenarios, so three scenarios give it a real range; with one scenario it falls back to fixed bands.