3M India Ahmedabad plant fully resumes operations after flood disruption
3MINDIA · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 0.8 pts less than Nifty Midcap 150 and 0.8 pts less than its Diversified peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
3M India says its Ahmedabad plant has fully resumed manufacturing from August 10, 2026, after restoration work. Operations were suspended from July 24 due to heavy rains and flooding, with partial restart happening before full resumption. Assets are insured and impact is being assessed.
Plant back to normal after flood disruption, with insurance coverage in place, limiting long-term damage. Watch for impact assessment update.