ACME Solar bags 450 MW SJVN peak power project at INR 6.75/unit
ACMESOLAR · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.9 pts less than Nifty Smallcap 250 and 1.7 pts less than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
ACME Solar won a 450 MW / 1800 MWh SJVN FDRE-IV peak power project at a tariff of INR 6.75 per unit for 25 years. LoA received on November 10, 2025 after e-reverse auction on October 9, 2025. Project combines 300 MW solar with 1800 MWh BESS for 4-hour peak supply with 90 percent monthly availability. First ACME project using Indian-made ALMM List-II solar cells, located in Rajasthan using night-time connectivity.
Adds 450 MW to portfolio with 25-year revenue visibility; strengthens peak power segment and showcases BESS expertise.