ACME Solar commissions 160 MWh BESS project in Rajasthan
ACMESOLAR · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.4 pts less than Nifty Smallcap 250 and 1.4 pts less than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
ACME Solar Holdings, through its wholly owned subsidiary ACME Suryodaya Private Limited, has commissioned 160.512 MWh of Battery Energy Storage System (BESS) capacity at Sanwara and Mehar Nagar, Jaisalmer, Rajasthan on July 20, 2026. Commercial operations begin July 22, 2026. With this, the subsidiary's total commissioned capacity rises to 285 MW / 1113.472 MWh, strengthening the company's energy storage portfolio.
Boosts operational storage capacity, supporting revenue growth in the energy storage segment.