Ashoka Buildcon wins Rs 865.90 crore NHAI expressway contract
ASHOKA · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 8.9 pts more than Nifty Microcap 250 and 9.5 pts more than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Ashoka Buildcon received an acceptance letter for an NHAI project to build the 8-lane Karvad to Jujuwa section of the Vadodara-Mumbai Expressway in Gujarat. The EPC price is Rs 865.90 crore, excluding GST. Completion is planned within 18 months, with a 10-year defect liability period.
The contract improves visibility on future revenue and work, but execution and cost risks remain during the 18-month project.