Bajel Projects wins Ultra Mega transmission order worth over Rs 400 Cr from PGCIL
BAJEL · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.1 pts more than Nifty Microcap 250 and 1.9 pts more than its Heavy Electrical Equipment peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Bajel Projects has bagged an Ultra Mega EPC order worth over Rs 400 Crore from PowerGrid Corporation of India (PGCIL) for a 765 kV transmission line. The project involves constructing 87.3 km of the Vindhyachal Pool to Prayagraj double circuit line under the Inter-regional NR-WR transmission strengthening scheme. Execution period is 21 months from the date of Notification of Award. The order is domestic, not a related party transaction. The win reinforces Bajel position in the high voltage power transmission EPC segment.
Strengthens order book and revenue visibility over the next 21 months. Positive signal for Bajel push into the specialised UHV transmission EPC space.