Bondada Engineering wins 100 MWh VRFB battery storage order from NTPC REL
Price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 3.3 pts more than Nifty Microcap 250 and 4.3 pts more than its Telecom - Infrastructure peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Bondada Engineering received a Notification of Award from NTPC Renewable Energy for an EPC package to build a 100 MWh Vanadium Redox Flow Battery Energy Storage System at Khavda Solar Park, Gujarat, including 10 years of O&M. Completion timeline is 10 months. Delectrik Systems is the technology partner. The company claims this is India's first and largest grid-scale VRFB BESS project. Order value was not disclosed.
Strengthens Bondada's position in India's fast-growing battery energy storage sector and marks entry into advanced vanadium flow battery technology. Positive for growth visibility.