BSEBrahmaputra Infrastructure Ltd· ConstructionHighPositive
Announced Thu, 9 Jul, 2026 · 15:00 IST

Brahmaputra Infrastructure emerges as L1 bidder for Rs 137.60 cr railway EPC order

Price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
+0.0%Reaction day
₹167.00
prior close
₹163.30
announcement price
In-mkt
timing
Nifty Microcap 250market · in no size index; the smallest one is used+1.9%-1.9% vs market
Civil Construction peers, median of 99sector+0.8%-0.8% vs sector

On the reaction day the stock moved 1.9 pts less than Nifty Microcap 250 and 0.8 pts less than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
+2.2
10m
+4.1
15m
+1.4
30m
—
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
+0.0+1.9-1.9+0.8-0.8
Next day
+5.8+3.3+2.5+1.7+4.0
2d
+16.3+3.5+12.8+2.2+14.1
3d
+13.2+2.4+10.7+0.5+12.7
4d
+10.2+3.1+7.1+0.5+9.7
5d
+10.8+2.6+8.2+0.0+10.8
1w
-1.0+2.1-3.1-1.5+0.6
15d
+0.3+0.9-0.6-2.3+2.6
1m
-1.2+5.5-6.7-1.2-0.0
2m
—+8.1—-6.1—
3m
—+3.5—-11.3—
UpDownMarket · Nifty Microcap 250Sector · Civil Construction peers, median of 99Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Brahmaputra Infrastructure Ltd, in JV with HBMCPL, emerged as the lowest bidder (L1) for a Rs 137.60 crore railway EPC contract from Northeast Frontier Railway Construction. The scope includes earthwork, bridges, a Road Over Bridge, and railway electrification on the Kokrajhar-Gelephu cross-border rail link to Bhutan, to be executed in 2 years. This is the first construction package on the 69-km corridor, announced at a total project cost of Rs 3,456 crore. Formal Letter of Acceptance is still awaited.

Likely market impact

New order adds revenue visibility; L1 status positions company for future packages on the same corridor. Formal award pending.