Tall Bridge Successful Testing of an contract value of Rs. 116.59 Crores all set to be inaugurate by Hon''ble Prime minster Sh. Narendra Modi
Price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
Awaiting price reaction for this filing.
Brahmaputra Infrastructure announced the successful testing of Tall Bridge No. 161-162-163 at km 42.36 on the new Bhairabi-Sairang broad gauge railway line, a Rs. 116.59 Crore contract executed in a joint venture. The steel girder bridge, with spans of 47.74m and 78.80m configurations, passed load testing, structural integrity checks, and speed trials up to 110 km/h, with the Commissioner of Railway Safety clearing operations at 90 km/h. The full railway line, including this bridge, is set to be inaugurated by Prime Minister Narendra Modi. The milestone covers complete foundation, substructure, steel girder erection, and ancillary works.
Positive for the company's reputation in government railway infrastructure, with high-visibility PM-level inauguration likely boosting order book prospects. However, the Rs. 116.59 Cr contract value was likely already recognised over the construction period, so this is more of a brand credibility boost than a fresh revenue trigger for shareholders.