Ceigall India bags 4 MoRTH road contracts worth Rs 2,149.62 Cr in Arunachal
CEIGALL · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 3.2 pts less than Nifty Microcap 250 and 2.4 pts less than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Ceigall India, with JV partner Sushee Infra Mining (74:26 share), received 4 Letters of Acceptance from the Ministry of Road Transport and Highways dated 17 Aug 2026. Total bid cost: Rs 2,149.62 Cr. Projects cover road construction on NH-913 Frontier Highway in Arunachal Pradesh on EPC mode. Individual contracts: Rs 521 Cr, Rs 611.10 Cr, Rs 525 Cr, Rs 492.52 Cr. Timelines: 36 to 48 months construction plus 5 years maintenance.
Large order win worth Rs 2,149.62 Cr strengthens order book; CIL share in JV is 74%. Positive for revenue visibility.