Ceigall India wins Rs 704.70 Cr road project in Arunachal Pradesh
CEIGALL · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.1 pts less than Nifty Microcap 250 and 1.2 pts less than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Ceigall India (74%) jointly with Sushee Infra and Mining (26%) emerged as L1 bidder for a Ministry of Road Transport and Highways project. Work covers construction of km 85.60 to 168.00 of the Lada-Sarli section of NH-913 Frontier Highway in Arunachal Pradesh on EPC mode. Awarded cost is Rs 704.70 Crore excluding GST. Timeline is 48 months construction plus 5 years maintenance. CIL share is about Rs 521.68 Crore.
Boosts order book and revenue visibility; government-backed highway order strengthens medium-term execution pipeline.