Board approves new Rs 250 Cr aluminium plant at Hosur
CRAFTSMAN · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 5.8 pts more than Nifty Smallcap 250 and 6.6 pts more than its Auto Components & Equipments peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Craftsman Automation board approved a new aluminium products manufacturing facility called Hosur Unit 3 in Tamil Nadu. Total estimated investment is Rs 250 Crore (Phase I Rs 100 Cr, Phase II Rs 150 Cr), funded mainly via term loans. Expected commissioning in 6-8 months. Existing capacity is at about 85 percent utilisation, with rising demand from auto OEM customers in Southern India driving the expansion. The Hosur location provides proximity to key customers.
Positive long term: capacity boost to capture OEM demand. Near term, Rs 250 Cr capex via debt may pressure margins and add leverage.