DIACABSNSEDiamond Power Infrastructure Limited· Electrical EquipmentHighPositive
Announced Tue, 16 Dec, 2025 · 16:23 IST

Cable supply order worth Rs. 57.58 crores from Rajesh Power Services

DIACABS · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
+0.0%Reaction day
₹140.40
prior close
₹143.95
announcement price
After-mkt
timing
Nifty Microcap 250market · index membership as recorded later (tracked since Jun 2026)-0.9%+0.9% vs market
Other Electrical Equipment peers, median of 44sector-1.0%+1.1% vs sector

On the reaction day the stock moved 0.9 pts more than Nifty Microcap 250 and 1.1 pts more than its Other Electrical Equipment peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
-2.3
10m
-2.2
15m
-2.4
30m
-2.2
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
+0.0-0.9+0.9-1.0+1.1
Next day
+1.1-1.2+2.3-2.0+3.1
2d
-0.3+0.0-0.4-1.2+0.9
3d
+2.6+1.4+1.2+0.5+2.1
4d
+1.4+1.5-0.0-0.0+1.5
5d
+0.4+0.9-0.5-0.4+0.8
1w
-1.7-0.4-1.3-1.2-0.5
15d
-0.6-0.3-0.3-3.6+3.1
1m
-5.9-4.2-1.7-9.8+3.9
2m
-1.8-1.7-0.1-4.1+2.3
3m
-11.5-11.4-0.2-12.5+1.0
UpDownMarket · Nifty Microcap 250Sector · Other Electrical Equipment peers, median of 44Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Diamond Power Infrastructure received a Letter of Intent from Rajesh Power Services Limited for supply of 11 KV XLPE aluminum armored cables worth Rs. 57.58 crores inclusive of GST. The order runs from January 1 to June 30, 2026, on a km-rate basis with PV formula. Cables to be supplied as per UGVCL Robust 2.0 specification. The order is from a domestic EPC contractor and is not a related party transaction.

Likely market impact

Positive order inflow improves revenue visibility for H1 2026. Independent deal reflects genuine business traction.