शुभ दीपावलीDiwali offer: 3 months free on yearly plans · ends 11 NovSee plans
DIACABSNSEDiamond Power Infrastructure Limited· Electrical EquipmentHighPositive
Announced Wed, 3 Jun, 2026 · 13:28 IST

Diamond Power commissions 8th MV/EHV cable line at Vadodara

DIACABS · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
-2.7%Reaction day
₹193.50
prior close
₹189.41
announcement price
In-mkt
timing
Nifty Microcap 250market · index membership as recorded later (tracked since Jun 2026)+0.2%-3.0% vs market
Other Electrical Equipment peers, median of 49sector+0.0%-2.8% vs sector

On the reaction day the stock moved 3.0 pts less than Nifty Microcap 250 and 2.8 pts less than its Other Electrical Equipment peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
+0.1
10m
+0.4
15m
+0.5
30m
+0.5
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
-2.7+0.2-3.0+0.0-2.8
Next day
-0.5+1.1-1.6+0.6-1.1
2d
+5.0+1.1+3.9-0.4+5.4
3d
+2.1-0.9+3.0-2.4+4.5
4d
+4.7+1.0+3.8-0.1+4.9
5d
+2.7-0.5+3.2-1.6+4.3
1w
+4.4+1.4+3.0-1.0+5.4
15d
+5.4+6.2-0.8+2.8+2.6
1m
+3.1+7.1-4.0+0.1+3.0
2m
+67.2+8.0+59.2-1.4+68.6
3m
+67.4+11.2+56.2-3.6+71.0
UpDownMarket · Nifty Microcap 250Sector · Other Electrical Equipment peers, median of 49Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Commissioned its 8th MV/EHV power cable production line at Vadodara, Gujarat. Adds 150 km per month to existing 1050 km monthly capacity. Current utilization is 60 percent. Total investment of Rs 30 crore funded through internal accruals. Expansion driven by product demand.

Likely market impact

Positive for revenue growth. Internal funding means no debt. 60 percent utilization leaves room to absorb new capacity.