Announced Fri, 18 Sept · 10:36 IST

DMR Engineering wins Rs 70 Cr LoA for Arunachal hydro project

Price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reaction · full curve 14 horizons · vs prior close
+18.4%1-day move
₹28.48
prior close
₹30.00
base price
In-mkt
timing
5m10m15m30m1D2D3D4D5D7D15D1M2M3M
+4.3+4.3+4.3+4.4+18.4
Up moveDown movePending
AI summary

DMR Engineering, as lead member of a JV with Shri Balaji Hydro Construction, received a Letter of Award worth Rs 70 crore (ex-GST) from Arun Shakti Energy. Work involves building a coffer dam and barrage for the 24.60 MW Kamlang Small Hydro Electric Project in Lohit, Arunachal Pradesh. DMR holds 51 percent in the JV. Contract tenure is 780 days.

Likely market impact

Adds Rs 70 Cr to order book; strengthens revenue visibility over 780 days from hydro EPC segment.