Commercial production begins at expanded Ghiloth manufacturing facility
EPACKPEB · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.6 pts less than Nifty Microcap 250 and 2.3 pts less than its Industrial Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
EPACK Prefab Technologies began commercial production of pre-engineered buildings and PUF panels at its Ghiloth facility in Rajasthan on October 28, 2026. The state pollution board granted consent to operate. Added annual capacity is listed at 11,300 tonnes for PEB structures and 800,000 square metres for PUF panels. The project required around INR 100 crore, funded by IPO proceeds, to serve North India demand. Existing utilisation was about 77.5% for PEB and 49.5% for PUF panels.
More capacity may support sales and improve cost efficiency, but no order value or revenue impact was disclosed.