Commercial production begins at Ghiloth facility with added capacity
EPACKPEB · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.6 pts less than Nifty Microcap 250 and 2.3 pts less than its Industrial Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
EPACK Prefab Technologies began commercial production of pre-engineered buildings and PUF panels at its Ghiloth facility on October 28, 2026, after receiving consent to operate. The expansion adds 11,300 metric tons per year of PEB capacity and 800,000 square meters per year of PUF panel capacity. It required about INR 100 crore, funded from IPO proceeds, to serve growing demand in North India.
Higher capacity and exposure to North India demand may support revenue growth, but benefits depend on utilization and successful execution.