GPIL starts 6.91 MW waste heat power plant at Raipur
GPIL · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.0 pts less than Nifty Smallcap 250 and 1.7 pts less than its Iron & Steel Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Godawari Power and Ispat has commenced commercial operations of its 6.91 MW Waste Heat Recovery Based Power Plant at Siltara, Raipur, Chhattisgarh, effective 23.06.2026. The plant will utilize waste heat from flue gas generated by the company's existing Pellet Plant and Ferro Alloys Division at the integrated steel plant, improving energy efficiency and lowering power costs.
Improves energy efficiency and reduces power costs at existing steel facility, supporting operating margins.