Operations halted at Bhilad facility due to heavy rainfall and flooding
ICIL · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.0 pts less than Nifty Microcap 250 and 1.4 pts less than its Other Textile Products peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Operations at Indo Count Industries' Bhilad, Gujarat manufacturing facility have been temporarily stopped since 23rd July 2026 due to unprecedented rainfall and flooding. The company has ensured personnel safety and confirmed that all assets and materials at the facility are adequately insured. Damage assessment and production impact are still being evaluated, with a further update to follow once operations resume.
Near-term production at Bhilad unit may be affected. Insurance cover should limit financial loss, but quarterly impact is still unclear.