IRB Infrastructure Trust wins TOT-18 highway project in Odisha
IRB · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.4 pts more than Nifty Smallcap 250 and 1.6 pts more than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
IRB Infrastructure Trust (associate of IRB Infrastructure Developers) is preferred bidder for NHAI TOT-18 project. Scope is Tolling, Operation, Maintenance and Transfer of 74.5 km Chandikhole-Bhadrak section of NH-16 in Odisha for 20 years. Upfront concession fee of Rs 3,087 Crores to be paid to NHAI. Order book rises by about Rs 1,600 Crores. This is IRB Group's 6th TOT win, lifting TOT market share to about 44 percent and footprint to 13 Indian states.
New TOT win lifts IRB Group TOT market share to about 44 percent and adds to order book. Positive for long-term toll revenue visibility.