शुभ दीपावलीDiwali offer: 3 months free on yearly plans · ends 11 NovSee plans
ISGECNSEIsgec Heavy Engineering Limited· ConstructionHighNegative
Announced Tue, 1 Jul, 2025 · 18:42 IST

Isgec Heavy Engineering Limited has informed the Exchange about Impact of Heavy Rainfall at Material Subsidiary's Premises

ISGEC · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
-1.6%Reaction day
₹1229.90
prior close
₹1227.00
announcement price
After-mkt
timing
Nifty Microcap 250market · in no size index; the smallest one is used-0.2%-1.4% vs market
Civil Construction peers, median of 87sector-0.8%-0.8% vs sector

On the reaction day the stock moved 1.4 pts less than Nifty Microcap 250 and 0.8 pts less than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
-0.5
10m
-0.8
15m
-0.8
30m
-1.4
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
-1.6-0.2-1.4-0.8-0.8
Next day
-2.7-0.1-2.6-0.8-1.9
2d
-0.8+0.3-1.1-0.6-0.2
3d
-0.8-0.2-0.6-1.3+0.5
4d
-1.5-0.3-1.2-1.3-0.1
5d
-1.1+0.2-1.3-1.1-0.0
1w
-3.7+0.1-3.8-2.3-1.5
15d
-7.9+1.2-9.1-2.5-5.4
1m
-11.0-2.2-8.8-6.1-4.9
2m
-17.0-3.0-14.0-7.1-9.9
3m
-27.0-2.9-24.1-6.3-20.7
UpDownMarket · Nifty Microcap 250Sector · Civil Construction peers, median of 87Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

Isgec Heavy Engineering's material subsidiary, Saraswati Sugar Mills Limited, experienced water ingress at its factory in Yamuna Nagar, Haryana, due to heavy rainfall on June 30, 2025. Floodwater entered some sugar godowns, and because sugar absorbs moisture, part of the stored sugar stock was damaged. The subsidiary has begun draining the water and shifting stock to limit further losses, while a valid insurance policy is in place and a claim is being filed. The exact extent of damage is still being assessed and cannot be quantified yet. Since this is the off-season for the sugar factory, management does not expect any material impact on the subsidiary's production or business operations.

Likely market impact

Short-term impact is limited to the value of damaged sugar stock, which is expected to be recovered through insurance. Since the sugar factory is in off-season and no production disruption is anticipated, the event is unlikely to have a material effect on Isgec's consolidated earnings or share price.