JSWENERGYBSEJSW ENERGY LIMITED· PowerHighPositive
Announced Wed, 12 Aug, 2026 · 13:47 IST

JSW Energy subsidiary signs JV with Bhutan's DGPC for 920 MW hydro project

JV announcedStrategic Transactions View source PDFExplain this filing

JSWENERGY · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reactionminutes from the announcement price · days from the prior close
-1.3%Reaction day
₹563.00
prior close
₹555.05
announcement price
In-mkt
timing
Nifty Midcap 150market+0.3%-1.6% vs market
Power Generation peers, median of 28sector-0.1%-1.2% vs sector

On the reaction day the stock moved 1.6 pts less than Nifty Midcap 150 and 1.2 pts less than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.

Minutes after the announcementfrom the announcement price · no benchmark
Stock
5m
-0.1
10m
-0.2
15m
-0.2
30m
-0.1
Sessions after the filingfrom the prior close
StockMarketvs marketSectorvs sector
Reaction day
-1.3+0.3-1.6-0.1-1.2
Next day
-1.3+0.3-1.6-0.7-0.6
2d
-0.5-0.2-0.4-0.4-0.1
3d
-1.3-0.0-1.3-1.1-0.2
4d
-2.6-0.4-2.2-1.6-1.0
5d
-3.4-0.7-2.7-1.9-1.5
1w
-3.2-0.2-3.0-1.7-1.5
15d
-4.3-1.5-2.8-4.6+0.3
1m
-10.3-4.7-5.6-5.8-4.5
2m
-17.0-7.8-9.1-8.5-8.5
3m
-7.9-3.0-4.9-5.1-2.8
UpDownMarket · Nifty Midcap 150Sector · Power Generation peers, median of 28Pending

Minute windows have no benchmark: there is no intraday index history to compare against.

AI summary

JSW Neo Energy, JSW Energy's wholly owned subsidiary, signed an agreement with Druk Green Power Corporation (Bhutan's government utility) to develop the 920 MW Punatsangchhu-III Hydroelectric Project in Bhutan on a BOOT basis. The JV will be incorporated in Bhutan with DGPC holding 51% and JSW Neo Energy 49%. Initial contribution is BTN 245 million. This is JSW Energy's first power generation venture outside India, strengthening its 1,781 MW operational hydro portfolio.

Likely market impact

Positive: first overseas venture adds clean dispatchable capacity to support 30 GW target by 2030, though 49% minority stake and Bhutan execution risk remain.