Announced Fri, 7 Aug · 18:01 IST
Juniper Green Energy wins 230 MW SECI FDRE Round-the-Clock tender
JNPR · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
Price reaction · full curve 14 horizons · vs prior close
+1.6%1-day move
₹251.30
prior close
₹251.00
base price
After-mkt
timing
5m10m15m30m1D2D3D4D5D7D15D1M2M3M
-1.1-1.5-2.0-2.5+1.6+0.8-1.1-0.9-3.9+1.0————
Up moveDown movePending
AI summary
Juniper Green Energy has won 230 MW capacity under SECI's 1000 MW FDRE Round-the-Clock tender at a tariff of Rs.5.26 per unit. The project is backed by a 25-year PPA with SECI, with commercial operation expected within 24 months. It strengthens the company's FDRE portfolio using integrated solar, wind, and battery storage. Operational capacity is 2.57 GWp and 500 MWh BESS; total portfolio exceeds 10 GWp.
Likely market impact
Positive — adds 230 MW to FDRE pipeline with long-term PPA, strengthening renewable energy growth and revenue visibility.