Juniper Green subsidiary commissions 12.40 MW additional wind capacity
JNPR · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved in line with Nifty Microcap 250, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
Juniper Green Stellar Private Limited, a wholly owned subsidiary, commissioned 12.40 MW of additional wind power capacity. This is part of its 120 MW Firm and Dispatchable Renewable Energy Project. With this addition, project capacity stands at 177.6 MWp and about 201 MWh battery storage out of the planned 232.4 MWp. Aggregate operational capacity of Juniper Green Energy and its subsidiaries is now about 2,588 MWp and about 500 MWh battery storage.
Boosts operational portfolio to about 2,588 MWp; positive step toward completing the 232.4 MWp project.