KPELNSEK.P. Energy LimitedHighPositive
Announced Wed, 8 Jul · 18:23 IST

K.P. Energy commissions 50.4 MW wind power project for NTPC in Gujarat

Greenfield CommissionedCapex & Operations View source PDF

KPEL · price

Loading chart…

▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.

Price reaction · full curve 14 horizons · vs prior close
+1.5%1-day move
₹324.90
prior close
₹325.30
base price
After-mkt
timing
5m10m15m30m1D2D3D4D5D7D15D1M2M3M
+2.7+2.0+1.9+2.2+1.5+1.0-0.3-0.3-1.0-2.1
Up moveDown movePending
AI summary

K.P. Energy has commissioned the first 50.4 MW capacity of a wind power project at Vanki site in Kutch, Gujarat, achieving Commercial Operation Date effective July 8, 2026. The project includes 16 Suzlon wind turbines of 3.15 MW each and was developed as an EPC contract for NTPC Renewable Energy. The company positions this as a key milestone reinforcing its standing as a leading wind energy EPC and operations and maintenance provider supporting India renewable energy growth.

Likely market impact

Positive - COD achieved on EPC contract for NTPC Renewable Energy, boosting KPEL execution track record and likely supporting order book momentum.