HMDA awards Rs 1,396.54 crore corridor project
KNRCON · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 2.3 pts more than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
KNR Constructions received a formal award from Hyderabad Metropolitan Development Authority to build an elevated corridor from ICCC Banjara Hills to Shilpa Layout Flyover Road in Hyderabad. The contract is worth Rs 1,396.54 crore, excluding GST, and the construction period is 24 months.
Positive for order visibility; the 24-month project adds execution, funding and collection risk before full revenue is recognised.