KNR Constructions Limited has informed the Exchange about Bagging/Receiving of orders/contracts
KNRCON · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 1.1 pts less than Nifty Microcap 250 and 0.4 pts less than its Civil Construction peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
KNR Constructions has received a Letter of Acceptance from the Greater Hyderabad Municipal Corporation (GHMC) for building a 3-lane flyover on each side at Kukatpally 'Y' junction on NH65 in Telangana. The project will be executed on an EPC/Turnkey basis at a value of Rs. 72.80 crores (excluding GST). The construction timeline is 24 months. The trading window for dealing in KNR securities has been closed from 1st October 2025 in line with insider trading regulations.
This is a modest order win for KNR's order book and reinforces its presence in Telangana's urban infrastructure segment, though the Rs. 72.8 crore value is unlikely to materially move the stock. Positive sentiment-wise, it signals continued order inflows but is not a transformative contract.