KPI Green Energy gets 300 MWac order from Adani for Khavda project
KPIGREEN · price
▲ positive · ▼ negative · ● neutral filings · teal = economic event · numbered = multiple that day (click to pick). Times IST.
On the reaction day the stock moved 0.7 pts less than Nifty Microcap 250 and 0.1 pts less than its Power Generation peers, over the same two closes: a difference in percentage points, not a measure of what the filing did.
Minute windows have no benchmark: there is no intraday index history to compare against.
KPI Green Energy has received orders from Adani Group entities (Adani Green Energy Six Ltd and Adani Green Energy Ltd) for electrical, civil and allied work for a 300 MWac / 405 MWdc project at the Khavda Hybrid Renewable Energy Park in Gujarat. Scope includes AC-DC electrical works, civil works, pile foundations, module mounting structures, and supply of electrical equipment. With this, aggregate Adani orders for Khavda stand at 834 MWac / 1,131 MWdc, including the 534 MWac order from January 16, 2026. Domestic order, not a related party transaction.
Boosts order book and reinforces role as execution partner for marquee renewable projects; positive for revenue visibility.